ML17347A946

From kanterella
Jump to navigation Jump to search
Forwards mgt-on-shift Weekly Rept,Per NRC 871019 Order. One Plant Supervisor Shift Rept Identifying Area for Improvement Also Being Submitted
ML17347A946
Person / Time
Site: Turkey Point  
Issue date: 01/25/1989
From: Conway W
FLORIDA POWER & LIGHT CO.
To: Ernst M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
EA-87-085, EA-87-85, L-89-28, NUDOCS 8902070009
Download: ML17347A946 (45)


Text

,:. ggcglZRATED D1~Bt'TIO.'EMONSTR+OY SYSTEM v

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 8902070009 DOC. DATE: 89/01/25 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION ERNST,M.L.

Region 2, Ofc of the Director

SUBJECT:

Forwards mgt-on-shift weekly rept,per NRC 871019 order.

DISTRIBUTION CODE:

D036D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Turkey Point Management Onshift Program NOTES:

DOCKET g 05000250 05000251 RECIPIENT ID CODE/NAME DRP/ADR-2 PD2-2 PD INTERNAL: AEOD NRR DEPY NRR MORISSEAU,D NRR/ADT 12-G-18 NRR/DRIS DIR 9A OE LI JT E

ILE 0~

EXTERNAL LPDR NSIC COPIES LTTR ENCL 1

1' 1

1 1

1 1

1 1

. 1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME NRR/DRP-1/2 EDISON, G DEDRO NRR DIR NRR/ADP 12-G-18 NRR/DLPQ/PEB NUDOCS-ABSTRACT OGC/HDS2 RGN2 FILE NRC PDR COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 h

NOZE IO ALL "RIDS" RECIPIENIS:

PLEASE HELP US K) REDUCE HASTE!

CGHI'ACZ 'IHE DOCUMEMI'OFZROL DESK ROOM Pl-37 (EXT. 20079) m ELIMINATE YOUR MME FKR DISTRIK7TIQN LISTS FOR DOCUMEMIS YOU DONiT NEEDr TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL 22

'0 up

P.O. Box14000, Juno Beach, FL 33408-0420 JANUARY 2 S 1989 L-89-28 Mr. Malcolm L. Ernst Acting Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N. W., Suite 2900 Atlanta, Georgia 30323

Dear Mr. Ernst:

Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Mana ement-on-Shift Weekl Re ort Pursuant to the Nuclear Regulatory Commission Order dated October 19, 1987, the attached summary of Management-on-Shift (MOS) reports is submitted.

One Plant Supervisor-Nuclear Shift Report identifying an area for improvement is also being submitted.

The attached will be a final report, in accordance with the NRC letter dated January 20, 1989 which terminated the MOS portion of NRC Order EA-87-85.

Should there be any questions on this information, please contact us

~

Very truly yours, W. F.

Conw Senior Vic President Nuclear WFC/RHF/gp Attachment cc:

J.

Lieberman, Director, Office of Enforcement, USNRC Dr.

G. E. Edison, Project Manager,.NRR, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant R.

E. Talion, President, FPL MOS.LTR 8902070009 5000250 890125 PDR ADOCK 0 PDC R

an FPL Group company l

~

Boa&

I

~

w" I

MANAGEMENT ON SHIFT (MOS)

WEEKLY SUMARY REPORT WEEK STARTING:

~/~3/89 PAGE 1

PP 1

Five MOS observers were on shift.

S.

G. Brain, Independent Safety Engineering-Group,

Chairman, St.

Lucie Plant (1/13-15/89, days);

M.

B.

Gilmore, Plant Support Group Operations Specialist, Juno Beach (1/16-19/89, and 1/21-22/89, days);

J.

W.

Patterson, Westinghouse Electric Corporation (1/13-16/89, nights);

R.

C.

Coulthard, Westinghouse Electric Corporation (1/17-23/89, nights);

C. L. Mowrey, Westinghouse Electric Corporation (1/20/89, days).

Unit 4 remained defueled.

Unit 3 attained Mode 3, then cooled down to Mode 5 to repair a leak at the incore flux thimble seal table.

No immediate safety problems or questionable work practices were reported.

The independent observers noted six areas for improvement, as

-follows:

One item on valve seat leakage.

One item on pump parameters One item on surveillance frequency Two items on reference material One item on hardware deficiency The Plant Supervisor Nuclear (PSN) noted one area for improvement, as follows One item on fillingthe lab tank The MOS portion of NRC Order EA-87-85 was terminated by the NRC letter dated January 20, 1989 from M. L. Ernst to W. F.

Conway.

ATTACHMENT: MOS DAILY REPORTS S

l)t)te

~ -

1 13/89 Shift Re porty,,

Peaks Anderson Shift Management AI~SN Dallau NNK Spence A.

QUESTIONABLE WORK PRACTICBS/ACTIONS TAKEN/RECOMMENDATIONS None B.

AREAS FOR IMPROVEMENT/RBCOMMBNDATIONS/ACTIONSTAKEN For as long as I can

remember, we have had problems with filling the lab tank with demineralized water.

The pumps cannot supply water to the Demineralized Water Storage Tank {DWST) and the lab tank at the same time, so we isolate the DWST to push water up to the lab tank.

This has blown dozens of rupture discs when we have Ecolochem trailers in service.

When the WTP is in service it shocks the WTP system when 001 is throttled, causing the resin beds to lifta small amount causing an increase in conductivity and shorter life of the resin beds {sometimes 4 of normal life span).

Recommendation:

The lab tank has an automatic fill system in which a solenoid valve opens upon a certain level. All it needs is enough pressure in the system to fillthe tank.

If the source of the water were off of the primary water system header it would fill automatically from the primary water pumps.

A simple tubing run would accomplish this.

This fix would also eliminate the use of an operator to fillthe lab tank which always seems to need filled when we have several other evolutions going on.

{Same as 88-0849, 4/16/88, also from Anderson)

C.

GOOD PRACTICES/PROFBSSIONALISM OBSERVED Routine operations

f lf ~

~

0

~

~ ~

~

~ ~

~

~

e

~

~

~

~

s e

e

~

I

~

~

~

~

~

~

~.-

s

~

~

~

~

o

~

~

~

~

~

~

~

~

~ ~

~

~

~

~

~

~ -.

~ ~, ~,

~

~

~

~ &

~

~

~

~

0

~

~

v

~,

a

~

i

~

~

~

~

~,

~ ~

I t

~ ~

~ t ~

e o

~

~

~

~

~

~

~

~

~

~

~

I

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

6

- r

~

~

~

~

~

~

~

~

~

~ ~

~

~

~

~

~

~

~

~

~

~

~

~ ~

~

~

~ ), ~,

~

~

~ ~ r

~

~

r

~,

r

~

\\

~

r

~

~

~ ~,

r ~

s

~

~ ~

r r

~

~

I~ r

~

~

~

~

~

r

~

~

~

~ I e

e

~I

~

'a 4

J

~

~

~

~

~

'I ~

~

~.

~

o

~

~

~

0

~

~

~ ~

~

~

~ >>.

~

~.

~

~

~

~

~

~.

~

~ ~

~

~.-

~

~

~

I

~ ~

~

~ ~

~,

~

~

~

m

~

~

'0 0

~

e

~,

e

~

l ~

e

~

~

~

~

~

~ ~

~

~

r

~

~ ~

P

+

~

~

~

e

~

e

~

~

~ ~

~

~

~

I I

~

~

~

~

~ '

~ 0

~

~

+ sg

'0

(

U 4/)'I' 1

Date:

I/14-15/89 OIIIFT OVERSIGHT PROGR+

DAILYREPORT John Patterson

(

server)

A.

PLANT EVOLUTIONS OBSERVED Unit 3 - mode 3, unt 4 - defueled 2330 shift turnover/briefing Tour of intake structure Tour of turbine deck Tour of unit 4 containment Plant heatup Shift:

B.

IMMEDIATESAFETY PROBLEMS None C.

QUESTIONABLE WORK PRACTICES None D.

AREAS FOR IMPROVEMENT None E.

PROFESSIONALISM,

SUMMARY

OF SHIFT, COMMENTS Routine heatup and outage activities.

Reviewed By:

perations Superi ntendent-Nuclear Date:

Management Review By:

i(

1tpt ae IXOLIad IIIM'She

l

'0 f

, ll

'DI:~

OIOIIFTOVERSIGHT PROGRAM DAILYREPORT Page S. G. Brain

(

server)

A.

PLANT BVOLUTIONSOBSBRVBD Unit 3 - mode 3, unit 4 defueled Day shift meeting/peak shift meeting Toured turbine area Toured unit 4 containment Toured reactor auxiliary building B.

IMMBDIATBSAFBTY PROBLBMS None C.

QUBSTIONABLBWORK PRACTICBS None D.

ARBAS FOR IMPROVBMBNT None B.

PROFBSSIONALISM,

SUMMARY

OF SHIFT, COMMBNTS Unit 3 heatup held pending repair of HCV-936.

Routine control room operations continuing to prepare unit 3 for heatup and unit 4 for lower cavity floodup.

Good professional meetings with good communications to and from shift management

- PSN and AFSN.

Reviewed By:

perations Superintendent-Nuclear Management Review By:

M-

,Jl(l 5(

ate

  • ilOS:Iad I INDE

e e

<g f

P

~

I g

IW ass

~

as>>

a

~

~

'ate:

1/15-lo/89 OUHIFTOVERSlGHT PROGR+

DAILYREPORT Page John Patterson

(

server shia:"y A.

PLANT EVOLUTIONS OBSERVED Unit 3 - mode 3,Unit 4 - defueled 2330 shift turnover/briefing Tour of intake structure Tour of unit 4 containment Reactor head lift Reactor coolant system (RCS)

B.

IMMEDIATESAFETY PROBLBMS None C.

QUESTIONABLE PORK PRACTICES None D.

AREAS FOR IMPROVEMENT None B.

PROFBSSIONALISMb

SUMMARY

OF SHIFT, COMMENTS Units 3 and 4 activities proceeded smoothly.

Reviewed By:

Operations Superintendent-Nuclear Management Review By:

~n'og

h, 0

(

1 C

1

~ Q l

p

'I I

1 e

t

D t ONIFT OVERSIGHT PROGRAI DAILYREPORT Page M. B. Gilmore

(

server y

A.

PLANT EVOLUTIONS OBSERVED Shift turnover Shift briefing (day shift)

Plan of the day meeting Unit 3 heatup to 547 F

Overpressure test in progress Toured units 3 and 4 component cooling water (CCVI) areas "A"Emergency Diesel Generator (FDG) test Shift briefing (peak shift)

B.

IMMEDIATESAFETY PROBLEMS None C.

QUESTIONABLE WORK PRACTICES None D.

AREAS FOR IMPROVEMENT None B.

PROFESSIONALISM,

SUMMARY

OF SHIFT, COMMENTS Unit 3 heatup went smoothly, routine operations.

Reviewed By:

Operations uperi ntendent-Nuclear Dat:

/7 Management Review By:

M-

,J1P/9)

  • hlOS:I mal I Ilia/b5

4 0

l 1

C I

~

~

~ I ~

~

~

Q

~

~ I

~

~

~

~ r r

~

e ~

~

~

~

~

~

~

~

~

~

~

~

~ ~ I ~

~

~

~ ~,

r

~

~

~

~ ~ \\

~

I I

~

r

~

r r

I

~

r

~

~

~'

~

~ ~

r

~

~ ~

e

~

~

~ ~ r

~

~

~ r

}

~

~

r I

~

~

I ~

~

~

~

~

I

~

I

~ ~ I ~

I

~

~

I ~

I ~

I

~

~

~

~

~

~

~

~

~ ~

~

I

~

~

~

~ '

~I

~

t,'1

)

~ir ttly 3i+'j I

D~te'.

I/17/89 OlIIFT OVERSIGHT PROGRAM DAILYREPORT Hike Gilmore

(

server)

Shift:

A.

PI.ANT EVOLUTIONS OBSERVED Shift turnover Plan of the Day meeting Unit 3 cooldown to mode S (<200 F)

Pumping (slucing) ¹3 Refueling Water Storage Tank (RWST) to ¹4 RWST for

¹4 cavity fill 1400 outage meeting Shift briefing B.

IMMEDIATESAFETY PROBLEMS None C.

QUESTIONABLE WORK PRACTICES None D.

AREAS FOR IMPROVEMENT None B.

PROFESSIONALISM,

SUMMARY

OF SHIFT, COMMENTS Operations were conducted professionally.

Reviewed By:

perations Superi ntendent-Nuclear Management, Review By:

I" '

}

I' t

V

'ate:

1/17-18/89 OlSIFT OVERSIGHT PROGRAM DAILYREPORT Page Richard Coulthard

(

server)

Sh ft:

Night A.

PLANT EVOLUTIONS OBSERVED Unit 3 in cold shutdown {mode 5)

Unit 4 defueled Establishment of cold shutdown requirements per GOP-305 and AP 103.32 2330 start of shift meeting Boric acid batching efforts to refillunit 3 RWST Monitoring of unit 4 leakage to containment sumps using safety assessment system Report to NRC of contractor employee testing positive for substance abuse B.

IMMEDIATESAFETY PROBLEMS None C.

QUESTIONABLE WORK PRACTICES None D.

AREAS FOR IMPROVEMENT None E.

PROFBSSIONAI.ISM,

SUMMARY

OF SHIFT, COMMENTS Both shifts were quite busy with clearances and valve lineup verifications.

All activities were conducted in a professional manner.

Reviewed By:

perations Superi ntendent-Nuclear Bat: ryP Management Review By:

/~pej l 1(( (t ae

t gp nS

~

~

0

~

~

~

~

~

~

~

~

~

I g

~

~.

~

~

~

~

P

~

~

~

~

~

~

~.

I

\\

~

~ ~

~

~ ~

~

~

~ ~

~

~

~

~

0

~

~

~

~ ~

~

~

~

~

~

~

~

~

~ ~

0

~

~

P

~,

0 0

I

~

0

~

~

~

0

~ ~

~

0 ~

0 0

~

0 ~

0 0

~

~

~

P

~

P

~

~

~

~ ~ ~

~

I

~

~

~

~

~

~

~

~ )

~

~

~

~

~

~

~I I

4l

~J

)

~

~

~

e

~

~

~

~

Q e

~

~

~ I

~

Q

~

~

~

~

~

~

~

~

~

I

~

~

~

~

~

~

~ -

~ '

~

~

~ ),

~

~

~

~ t Q

~

~

o

~,

o

~

I

~

~

~

~

~ P, 0 ~

~

~

~ ~

P 0

~

~

~

~

~

~

~

~

~

~

~

~

I I

~

~

~

~

~

~

~ ~

~

~

~

~

~ I

~ I I

~

~

~

I

~

~

~

~

I

~

~

~

~

~

~

~

~ \\

~

~

~

~

I

~

~

I ~

I I

~

~ I I

~

I ~

~

~

~

~

I

~

0 f 0

~

~

~

~

P

~

e

~

~

~

I

~

~

~

~

I

~

~

~

]I g't

.Date) '/19/89 OIIIIFTOVERSIGHT PROORA DAILYREPORT Page hiike Gllmore ShiL

\\

A.

PLANT BVOLUTION8OBSBRVBD Control room activities Shift turnover Plan of the Day meeting Post unit 4 ca'vlty drain down B.

IMHBDIATB8AFBTY PROBLBMS None C.

QUBSTIONABLBWORK PRACTICBS None 1

D.

ARBAS FOR IMPROVBMBNT None B.

PROFB88IONALISMa

SUMMARY

OF SHIFT, COMMBNTS None h

I Reviewed By:

f Management Review By;

/

II

~

C

<<Qos I a4 II en+

I~

Date: / K perationa upennten nt-uc ear

/ lgo

0

~

J p

II

Bate:'

1 19-20 89 ONItPTOVERSlGHT PROGRAM DAILYREPORT Paga-Rfchard Coulthard A.

PLANTBVOLUTIONS OBSBRVBD Unit 3 in cold shutdown Unit 4 defueled Unit 4 containment tour 2330 start of shift meeting Dfscussion of residual heat remova1 (RHR) incident by the Operations crew and the Operatfons Supervisor B.

IMMBDIATBSARBTY PROBLBMS None C.

QUS8TLONABLS WORK PRACTICBS None D.

ARSA8 FOR IMPROVSMSNT None B

PROFS88IONALISMy

SUMMARY

OP SHIFT~ COMMBNTS The peak shift was busy with unit 4 activities associated with reactor cavity drain down, refilling reactor vessel and tagouts.

All activities conducted in a professfonal manner.

Reviewed By:

peratmns sperinten nt-ue ear Management Review By;

/

1ll0$:f o4 lies g Igug

Gate:.

1/20/89 O~HIFTOVERSIGH'F P BOG R DAILYREPORT Past Craig Mowrey

~

server see:

A.

PLANT EVOLUTIONS OBSBRVBD 0700 Plan of the Day meeting Notification oE Sfgnftfcant Event per AP 0103.12 (Guard asleep)

Preparation to fflland vent 4B component coolfng water header Peak shift brief'fng B.

IMMEDIATESAFETY PROBLEMS None C.

QUBSTIONABLBWORK PRACTICBS None D.

ARHA8 FOR IMPROVHMHNT 2i 34 AP 0103.12 requires that, during business

hours, the PSN contact the Vice President Nuclear Energy, Mr, Conway's telephone number is not in the Duty Call book.

This same problem was identÃfed last May.-

(89-oo77)

The dfA'fculty in contacting Mr. Conway was exacerbated because there is no F PAL telephone directory in the control room.

(89-0078)

At least 13 lights on unit 4 Turbfne Area 30'" eleva)ion do not have safety globes over the lfght bulbs. Are they supposed tot (89-0079)

B PROFBSSIONALISMy

SUMMARY

OP SHIPT~ COMMBNTS None Reviewed By; perattons upennten nt-uc ear Date:

Management, Review By:

t4<

e4

~. ~

~

~

~

~

~

~ l

~..

~ t 5 4 h

~

~

~

~

~

~

I 1

1

~

~

~

~':

~

~

~

~

~

~

a

~,

s

\\ y e

~

~ ~,

'\\

~ ~

0

~ ~

~

~

~

~

~

~

~

~

~

~

~

~. ~-

~

~

~

~ I

~ ~

~ ~

~

~

~ ~

~ I

~

~

~

~ '

o-

~

~

~

~

~

~ ~

~

~

~

4

~

~

~

~

i

~ ~:

~

~

~

~

~

~

~ -

-- III

=

~ I ~ ~ I

~

0 ~

~

1

~

~

~ y

~

w

~

~,

~ '

~

~

~ ~

~

~

1

~ ~

~

~

~

~

~

~

4

~ ~

~

~

~

~

~ t

~

~

t

~

~

~

\\

~

~ '

~

~

~

I

~

~

~

~

~ I

~ ~

~

~

~ '

~I 0

f

~

'0 I OlgliPTOVERRIGHTPROGRAM DA)LYREPORT M. B. Gilmore server Shift'.

PLANT BVOLUTIONSOBSBRVBD Shift turnover (mid-day)

Plan of the Day meeting Pill and vent on 8 Coinponent Cooling. Yi'ater (CCYP) header

- Clearance worklist Shift turnover (day-peak)

Shift briefing (peak shift)

B.

IMMHDIATBSAFETY PROBLEMS None C.

QUBSTIONABLBWORK PRACTICB9 None.

D, ARBAS FOR IMPROVBMBNT None FRORBSSIONALISM, SUMMARXOF SHIFT, COMMENTS Both units shutdown, routine operations.

Reviewed By perot<one uperi @ten nt-uclear Date:

Management Review By:

I/

4IIOS:I axf Itch'ae

1

1-22 &9 0IHIPTOVERSIGHT PROGRAM DAILYREPORT PICA Rfchard Coulthard server A.

PLANT EVOLUTIONS OBSBRVBD 4

Unit 3 in cold shutdown Unit 4 dei'ueled 4

Unit 3 preSSuriZer COOldOWn and bubble COllapae 2330 start of mid-shift meetfng B. 'HMHDIATB8AFBTY PROBLBMS None.

C.

QUHSTIONABLBWORK PRACTICES None D.

ARBA8 FOR IMPROVHbiBNT None Ho PROFHSSIONALISMy

SUMMARY

OF SHIFT~ COMKBNTS l.

Unit 4 was very busy early in the shift durfng pressurizer cooldown in preparation for the in-core tube repairs.

2, Shift activities were conducted fn a professional manner.

Reviewed By:

peratfons uperinten nt-uc ear Date.'anagement Review By:

ate lo

tt9 0

Y

Satb l 22 89 0

HUFF OVERSIGHT PROGR~

DAILYREPORT Fags Nike Gflmore server A.

PLANT EVOLUTIONS OBSERVBD Unit 3 - mode 5> unit 4 defueled Shfft turnover (mid-day)

Shift briefing 4

Plan of'he Day meetfng 1400 outage meeting Shm; D'y B.

IMMEDIATESAFBTY PROBLEMS None Co QUESTIONABLB WORK PRACTICBS None D.

AREAS FOR IMPROVEMENT None H.

PROPBSSIONALISM, SUMNARYOF SHIPT, COMMBNTS Emphasis on releasing clearances

today, otherwise qufet shff't conducted fn a

professional manner.

Reviewed By:

perchance uperinten nt-uc ear Management Review By; aeoi:s wl~

ate

g-II

0+HlFT OVERSIGHT PROGRAM DA1LYREPORT Page Richard Coulthard Shift'.

PLANT BVOLQTIONS OBSBRVBD Unit 3 in cold shutdown and depressurhed Unit 4 defueled 1530 start of peak shift meeting 2330 start of mid shift meetfng Tour of unit 4 containment during fillof refueling cavity B.

IMMBDIATBSAFBTY PROBLBMS None C.

QUHSTIONABMWORK PRACTICBB None D.

ARBAS POR IMPROVBMBNT None B.

PROPBSSIONALISM,

SUMMARY

OP SHIPT, COMMBNTS Major shfft activftfes were assocfated w}th unit 4 refue)fng cavity sequence, work on unit 3 incore tubes J-7 and J-12 and leak repairs to the intake cooling water (ICW) piping near the 4B component cooling water (CCW) heat exchanger.

Overall, it was a quiet shift, Reviewed By: