Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000250/1995001 + (13:49:35, 7 January 2025)
- ML17352B051 + (13:49:36, 7 January 2025)
- IR 05000250/1994023 + (13:49:38, 7 January 2025)
- ML17352B048 + (13:49:39, 7 January 2025)
- L-95-033, Forwards Relief Request for Turkey Point Unit 3 Class 1 & Class 2 Pressure Retaining Similar & Dissimilar Metal Welds in Vessels & Piping + (13:49:40, 7 January 2025)
- ML17352B044 + (13:49:43, 7 January 2025)
- TAC:M90487 + (13:49:43, 7 January 2025)
- ML17352B042 + (13:49:44, 7 January 2025)
- ML17352B040 + (13:49:45, 7 January 2025)
- L-95-002, Forwards Response to NRC 941117 RAI Re Proposed License Amends Submitted by 940719 & 1020 Ltrs,Revising TS 3/4.7.1.1 & Associated Bases Which Addresses Max Allowable Reactor Thermal Power Operation W/Inoperable MSSVs + (13:49:46, 7 January 2025)
- L-95-053, Special Rept:On 950201,rapid Start of EDG Attempted & Alarms Failed to Sound When EDG Did Not Start.Caused by High Resistance on Contacts of Relay.Relay Replaced & EDG Retested Satisfactorily + (13:49:48, 7 January 2025)
- ML17352B033 + (13:49:50, 7 January 2025)
- L-95-051, Monthly Operating Repts for Jan 1995 for Turkey Point Units 1 & 2 + (13:49:52, 7 January 2025)
- ML17352B029 + (13:49:54, 7 January 2025)
- ML17352B030 + (13:49:54, 7 January 2025)
- ML17352B027 + (13:49:55, 7 January 2025)
- ML17352B023 + (13:49:56, 7 January 2025)
- ML17352B022 + (13:49:57, 7 January 2025)
- ML17352B019 + (13:50:04, 7 January 2025)
- ML17352B018 + (13:50:05, 7 January 2025)
- ML17352B014 + (13:50:08, 7 January 2025)
- ML17352B013 + (13:50:09, 7 January 2025)
- ML17352B012 + (13:50:10, 7 January 2025)
- ML17352B011 + (13:50:11, 7 January 2025)
- 05000250/LER-1994-006-03, :on 941226,C Main Feedwater Control Valve Failed Closed,Causing Reactor & Turbine Trips.Caused by Loose Screw Terminal Connection.I/P Transducers Replaced W/ New Model W/Different Design Wire Connection + (13:50:12, 7 January 2025)
- ML17352B009 + (13:50:13, 7 January 2025)
- ML17352B004 + (13:50:15, 7 January 2025)
- ML17352B005 + (13:50:15, 7 January 2025)
- ML17352A999 + (13:50:20, 7 January 2025)
- IR 05000250/1994024 + (13:50:36, 7 January 2025)
- ML17352A996 + (13:50:38, 7 January 2025)
- TAC:M86873 + (13:50:46, 7 January 2025)
- ML17352A994 + (13:50:48, 7 January 2025)
- ML17352A993 + (13:50:49, 7 January 2025)
- ML17352A992 + (13:50:50, 7 January 2025)
- ML17352A991 + (13:50:52, 7 January 2025)
- ML17352A986 + (13:50:53, 7 January 2025)
- ML17352A975 + (13:50:54, 7 January 2025)
- L-94-328, Advises That Recommended Current Order Timing Mod,Per GL 93-04,will Be Implemented During Next Refueling Outage for Unit 3 Scheduled to Start in Sept 1995 & Unit 4 Scheduled to Start in Mar 1996 + (13:50:55, 7 January 2025)
- L-94-301, Forwards Response to 10CFR50.46, Acceptance Criteria for ECCS in Light Water Power Reactors, Satisfying Annual Reporting Requirements for Util Turkey Point Units 3 & 4 + (13:50:57, 7 January 2025)
- TAC:85616 + (13:50:58, 7 January 2025)
- ML17352A963 + (13:51:00, 7 January 2025)
- L-94-327, Submits Financial Info,Per 10CFR140.21.Licensee 1993 Form 10-K,most Recent Annual Financial Rept,Attached as Exhibit 1 + (13:51:02, 7 January 2025)
- L-94-306, Responds to RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers Issued by NRC on 931220,to Help Insure Timely Resolution of Fire Barrier at Facility Units 2 & 3 + (13:51:04, 7 January 2025)
- ML17352A960 + (13:51:10, 7 January 2025)
- ML17352A958 + (13:51:12, 7 January 2025)
- L-94-319, Forwards Util Scope & Objectives for 1995 Facility Annual EP Exercise + (13:51:13, 7 January 2025)
- L-94-293, Provides Update on Items Completed at Plant During 941003-1114 Cycle 15 Refueling Outage.Summarizes Regulatory Activities & Items of Regulatory Interest,For Which Action Taken During Refueling Outage + (13:51:15, 7 January 2025)
- L-94-317, Forwards Rev 28 to Radiological Emergency Plan. Attachment 1 Provides Summary of Plant Radiological Emergency Plan Rev 28 Changes + (13:51:16, 7 January 2025)
- 05000251/LER-1994-006-02, :on 941130,Unit 4 Tripped Automatically.Caused by Failure of Flexible Link Connection Between Main Generator B Phase Bus & Associated Isolated Phase Bus Bar. All Bolts on Flexible Link Checked + (13:51:19, 7 January 2025)
- L-94-313, Monthly Operating Repts for Nov 1994 for Turkey Point Units 3 & 4 + (13:51:21, 7 January 2025)
- ML17352A950 + (13:51:21, 7 January 2025)