PR.IC3R.I EY (ACCELERATED RIDS PROCESSIN REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9503010389 DOC.DATE: 95/02/20 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit,3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET g
05000250 05000251 P
SUBJECT:
Forwards "Engineering Evaluation of Turkey Point Units 3
& 4 Containment Structure."
Rept summarizes re-analysis of Turkey Point Units 3
4 containment structures,per commitment made by 941123 ltr.
DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: General Distribution NOTES:
0 RECIPIENT ID CODE/NAME PD2-2 LA CROTEAU,R INTERNA ~FILE CENgEE4 0
NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1
1 1
1 1.
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DRCH/HICB, NRR/DS SA/SRXB OGC/HDS3 NRC PDR COPIES LTTR ENCL 1
l.
1 1
1 1
1 0
1 1
D 0
U N
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE DOCUMENTCONTROL DESK, ROOM P!-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAMEFROM DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL 10
4 h
FEB 20 1995 L-95-050 U.
S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Containment Structure Re-analysis TAC Nos.
M90486 M90487 By letter L-94-279, dated November 23, 1994, Florida Power
& Light Company (FPL) committed to submit a Special Report to the NRC summarizing the ze-analysis of the Turkey Point Units 3 and 4
containment structures.
In response to a request from the NRC, the enclosed report includes additional details concerning FPL' conclusion that the root cause of the higher than pzedicted tendon wire prestress force losses is due to higher ambient tendon temperatures and the corresponding higher relaxation rates than originally predicted.
In addition, the report includes:
(a)
An evaluation/summary of the methodology and results of the containment structure re-analysis including the determination of new minimum required tendon prestress forces for each tendon group.
(b)
An evaluation/summary of the analysis of existing surveillance data versus the minimum required prestress force, verifying the continuing capability of the containment structure to meet the design and licensing basis requirements through the end of the licensed plant life.
(c)
A summary of the background events leading up to the necessity of performing a containment structure re-analysis.
This transmittal satisfies FPL' commitment to the NRC as discussed during a meeting held with the NRC in Rockville, Maryland on September 29, 1994 and documented in,FPL letter L-94-279.
Should there be any questions, please contact us
~
Very truly yours, T. F. Plunkett Vice President Turkey Point Plant TFP/RJT/zt Enclosure cc; S.