ML17352B030

From kanterella
Jump to navigation Jump to search
Forwards FFD Program Performance Data for Six Month Period Ending 941231
ML17352B030
Person / Time
Site: Saint Lucie, Turkey Point  
Issue date: 02/16/1995
From: Bohlke W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-95-60, NUDOCS 9502210165
Download: ML17352B030 (9)


Text

P R.ICBM.IWY'ACCELERATED RIDS PROCI;SSIN REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9502210165 DOC.DATE: 95/02/16 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 50-335 St. Lucie Plant, Unit 1, Florida Power

& Light Co.

50-389 St. Lucie Plant, Unit 2,,Florida Power 6 Light Co.

AUTH.NAME AUTHOR AFFILIATION BOHLKE,W.H.

Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT; Forwards FFD program performance data for six month period ending 941231.

DISTRIBUTION CODE A021D COPIES RECEIVED:LTR ENCL SIZE:

DOCKET 05000250

. 05000251 05000335 05000389 P

NOTES RECIPIENT ID CODE/NAME PD2-2 PD NORRIS,J INTERNAL: ACRS NRR/DSSA/S PS B RGN2 02 EXTERNAL: NOAC COPIES LTTR ENCL 1

1 1

1

'I 1

1 1

1 1

1 RECIPIENT ID CODE/NAME CROTEAU,R ILE CENTER~Ol NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 D

U E,

N YOTE TO ALL"RIDS" RECIPIEYTS:

PLEASE ICELP US TO REDUCE O',KSTE! COYTACT'I'IIE DOCL'WIEYTCONTROL DESK, ROOKI Pl-37 (EXT. 504- 033 ) TO ELIiIIYATEYOL'R XAifL FROil DISTRIBU'I'IOY.LIS'I'S I'OR DOCI.'NIEX'I'SYOL'ON"I'L'ED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR, 10 ENCL 10

Florida Power 5 Light Company, P.O. Box 14000, Juno Beach, FL 33408-0420 FEB 1 6 1995 L-95-60 10 CFR 26.71 U.

S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 St. Lucie Units 1 and 2

Docket Nos.

50-335 and 50-389 Semi-Annual Fitness-For-Duty Pro ram Performance Data Gentlemen:

In accordance with 10 CFR 26.71(d),

please find attached the fitness-for-duty program performance data for the six (6) month period ending December 31, 1994.

Should you have any questions, please contact us.

Very truly yours, W. H.

Bo lke Vice President Nuclear Engineering and Licensing WHB/spt Attachment cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC Turkey Point Plant Senior Resident Inspector, USNRC St. Lucie Plant 9502210ib5 9502ib PDR ADOCK 05000250' PDR an FPL Group company

I~

I t

4 peel 1

f n

A

Fitness for Duty Program Performance Data Personnel Subject to 10CFR Part 26 Florida Power & Li ht Company Turke Point Plant Location Arthur R. Cummin s Contact Name December 31 1994 5 Months Endlntl 407 694-3573 Phone (Include Area Coda)

Cutoffs:

Screen/Confirmation (ng/mi) 0 Appendix A to 10 CFR Part 25 Marijuana 50/10 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 0plates 00%200 Alcohol (%BAG) 04%

TESTING RESULTS Average Number with Unescorted Access LICENSEE EMPLOYEES 1139 LONG-TERM CONTRACTOR PERSONNEL 273 SHORT-TERM CONTRACTOR PERSONNEL 363 CATEGORIES Pre-Access Post Accident

¹ TESTED 191

¹ POSITIVE

¹ TESTED

¹ POSITIVE

¹ TESTED 869

¹ POSITIVE 22 For Cause Random Follow-up Other Observed Behavior 281 15 78 89 TOTAL 489 78 969 23

Breakdown of Confirmed Positive Tests for Specific Substances Opiates Amphetamhes Phencydidne Retusal to Test 3

4 5

Long-Term Contractors Short-Term Contractors PTN TOTALS 12 26

    • One short term contractor tested positive for marijuana at 13 ng/ml. Allof the other positive drug tests listed above exceeded the DHHS/NRC cutoff levels.

MANAGEMENTACTIONS TURKEY POINT PLANT On October 13, 1994 notification was received from SmithKline Beecham Clinical Laboratories, the contracted DHHS laboratory, confirming an unsatisfactory performance testing incident.

The incident involved an expected fortified cocaine blind sample that was reported as "negative".

After an investigation by the toxicology laboratory management, it was found that human error was the likely cause.

Corrective action involving retraining and additional quality control steps were implemented.

Fitness for Duty Program Performance Data Personnel Subject to 10CFR Part 26 Florida Power & Ll ht Company St. Lucie Plant Location Arthur R. Cummin s Contact Name December 31 1994 B Months Ending 407 694-3573 Phone (Include Aron Code)

Cutoffs:

Screen/Confirmation (ng/ml) 0 Appendix A to 10 CFR Part 26 50/10 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/200 Akohol (%BAG)

.04%

TESTING RESULTS Average Number with Unescorted Access LICENSEE EMPLOYEES 1614 LONG-TERM CONTRACTOR PERSONNEL 228 SHORT-TERM CONTRACTOR PERSONNEL 498 CATEGORIES

¹ TESTED

¹ POSITIVE

¹ TESTED

¹ POSITIVE

¹ TESTED POSITIVE Pre-Access For Cause Random Follow-up Other Post Accident Observed Behavior 272 362 57 53 0

1130 145 24 25 TOTAL 692 55 0

1302 29

Breakdown of Confirmed Positive Tests for Specific Substances Ucensee Employees long-Tenn Contractors Short-Term Contractors PSL TOTALS Man]uana 16 Amphetamines Refusal to Test 1

2 4

5 33

'* All of the positive drug tests listed above exceeded the DHHS/NRC cutoff levels.

4 y

h

\\

1

~

S