March 3, 1995 LICENSEE:

Florida Power 8 Light Company. (FPL) p FACILITY:

Turkey Point Units 3 and 4

SUBJECT:

MEETING HELD TO DISCUSS THE PROPOSED THERMAL POWER UPRATE PROJECT On February 28,

1995, the staffs of FPL and NRR met in,the NRR offices.

The meeting was held at FPL request to discuss th'e proposed'thermal power uprate project for Turkey Point,Units 3 and 4 and the neecessary. licensing submittals.

H Mr. R. Kundalkar of FPL discussed the uprate program,, licensing submittals, and anticipated schedules.

Licensi'ng actions include leak-before-break methodology, revised thermal, design'rocedure, instrumentatio'n technical specification format change, small-break loss of coolant accident (LOCA) methodology, and a final uprate submittal, requesting an increase in thermal output from 2200 MW/unit to 2300 MW/unit';',

Reanalysis of the large-break LOCA is also necessary.

The status of the current NRC review of the Westinghouse best estimate. large-break LOCA methodology was discussed.

The final uprate request is'urrently scheduled for December 29,

1995, and NRC approval by September 30, 1996, will be requested.

The meeting resulted in a good understanding of the FPL plans and the NRR staff provided feedback on the feasibility of the,FPL'chedule estimates for NRR staff review.

Enclosure 1 contains a list of attendees and Enclosure 2 consists of the presentation material.

(Original Signed By)

Richard P. Croteau, Project Manager Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos.

50-250 and 50-251

Enclosures:

As stated cc w/enclosures:

See next page Distribution Docket-File PUBLIC PDII-2 RF WRussel 1 /FMiragli a RZimmerman

LPlisco, EDO NRR Attendees SVarga JZwolinski OGC EJordan D/AEOD ACRS (4)

DVerrelli, RII OFC'A:PDI I-2 NAME Dunnin ton 8%

DATE 03 2 95 PM: PDI I-2 RCroteau 03 95

/

I D:PDI 56Het hew

0) f95 OFFICIAL RECORD COPY - FILENAME: G:iNEETSUM.TP3

. Amoco

~!fly ~~"I'f! P~'6'INCISE CoiÃl 9503070289 950303 PDR ADOCK 05000250 PDR

I 11

Mr. J.

H. Goldberg Florida Power and Light Company CC:

Harold F. Reis, Esquire Newman and Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 Jack Shreve, Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Madison Avenue, Room 812 Tallahassee, Florida 32399-1400 John T. Butler, Esquire

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. Thomas F. Plunkett, Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Joaquin Avino County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission P.O.

Box 1448 Homestead, Florida 33090 Mr. Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Turkey Point Plant Units 3 and 4

Mr. Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Mr. H. N. Paduano, Manager Licensing 5 Special Programs Florida Power and Light Company P.O.

Box 14000 Juno

Beach, Florida 33408-0420 Mr. Edward J.

Weinkam Licensing Manager Turkey Point Nuclear Plant P.O.

Box 4332 Princeton, Florida 33032-4332

Enclosure 1

Turkey Point Units 3 and 4 Thermal Uprate Meeting February 28, 1996 A

n

~Na e

Office R. Kundalkar D. Carter B. Thomas F. Orr W. Bohlke E. Weinkam W. Smith J.

Tsao F. Grubelich H. Garg R.

Goel C.

Wa R. Croteau FPL NRR NRR NRR FPL FPL Bechtel/SERCH NRR NRR NRR NRR NRR NRR

TURKEY POINT UNITS 3 5, 4 THERMAL POWER UPRATE PROJECT FEBRUARY 28, 1995 FPL/NRC MEETING

+

~a~

Olear TURKEY POINT NUCLEAR PLANT THERMALPOWER UPRATE PROJECT I.

Uprate Program lt.

Licensing Submittals lll. Format l Content of Uprate Submittal IV. Discussion

~s>e I'oI Op TURKEY POlNT NUCLEAR PLANT

+

~o THERMALPOWER UPRATE PROJECT I.

u rate Pro ram

+ 3 loop Westinghouse PWRs - 2 units

+ Current license core power level - 2200 MW,/unit

~

Original analysis of record - 2293.7 MW,/unit

~

NSSS sister plant licensed for 2300 MW,

+ Plan to re-license Turkey Point Units 3 5 4

~

Uprated core power level - 2300 MW,/unit

~

31 MW,/unit output gain projected, 62 MW. total

~

Major re-analysis Nuclear Steam Supply Systems Power Conversion Systems

~

Minor physical modifications

+ Environmental Assessment

~

As part of original licensing, final environmental statement recognized ultimate thermal generating capacity of 2300 MW,

~

Small impact on radiological releases

~C+

+4/~

TURKEY POINT NUCLEAR PLANT THERMALPOWER UPRATE PROJECT I.

U ra e Pro ram (continued)

+ Benefits

~

Benefit to the Rate Payer Reduces system fuel expense by a significant amount Lowest cost capacity management option lVlore cost effective than Demand Side Management

~

Benefit to the FPL Shareholder Deferral of cash requirements for new generation Better utilization of existing assets

g+0 Poi Op

/

TURKEY PO1NT NUCLEAR PLANT THERMALPOWER UPRATE PROJECT

~IJ t

P i

ti dl 1/94 3/94 6/94 9/94 1/95 3/95 6/95 9/95 1/96 3/96 6/96 9/96 1/97 3/97 6/97 Engineering Analysis Licensing Submittal NRC Review Implementation Preparation Implementation Of Modifications Implement Uprating I

I l

l I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I CI I

I I

I I

I I

I I

I I

I I

I I

I No.

Licensing Submittals Topic Planned Submittal Date Requested Approval Date 1

Leak Before Break 2

Revised Thermal Design Procedure 3

Instrumentation Tech Spec Format 4

Small Break LOCA 2/2/95 A 5/1/95 5/31/95 8/31/95 8/1/95 10/31/95 11/30/95

'/28/96

>op lecrr

+~

TURKEY POINT NUCLEAR PLANT THERIMIALPOWER UPRATE PROJECT II.

Licensin Submi als

1. Leak Before Break (LBB)

~

Plant specific analysis for current power level

~

Will bound uprated conditions

~

Methodology and submittal comparable to analyses submitted by other Westinghouse utilities

~

Submitted February 2, 1995

~

Review requested by August 1, 1995

2. Revised Thermal Design Procedure (RTDP)

NRC approved methodology

~

Non-LOCA events reanalyzed

~

Significant increase in DNB margin (<3% to 19%)

~

Increases operating margin (OTDT, OPDT and S/G low-low level setpoints)

~

Methodology also used in uprating analyses Planned submittal by May 1, 1995 Review requested by October 31, 1995

-e>

>op4p TURKEY POINT NUCLEAR PLANT THERMALPOWER UPRATE PROJECT II.

Licensin Submi als (continued)

3. Instrumentation Technical Specification Format Change

~

Revises 5-column format to 2-column format for RPS/ESFAS setpoints

~

Nominal trip setpoint and allowable value included Consistent with Standard Technical Specification format Minimizes Technical Specification changes for equivalent instrument replacements

~

Uprating submittal will include 2-column format mark-ups

~

Planned submittal by May 31, 1995 Review requested by November 30, 1995

+Q pe lear

+

TURKEY POINT NUCLEAR PLANT THERMALPOWER UPRATE PROJECT

4. Small Break LOCA 10CFR50.46 Notice Significant error/change identified in October 1993 Penalty for Sl in broken loop Offsetting benefit of COSI FPL provided schedule for reanalysis (January 1994)

Next SBLOCA licensing activity

~

Uses NOTRUIVIP evaluation model addendum previously submitted in August 1994 Sl in the broken loop (WCAP-10054-P, Addendum 2) improved condensation model (COSI, WCAP-10054-P, Addendum 2 and WCAP-11767-P)

~

Uprating - Next FPL SBLOCA license activity

~

Consequences of delays in review Delayed uprate implementation (replacement power)

~

Planned submittal by August 31, 1995 Review requested by February 28, 1996

~C+

+Op TURKEY POINT NUCLEAR'PLANT

+

~a~

Oloae W~

THERMALPOWER UPRATE PROJECT II.

Licensin Submittals (continued)

5. Uprating Submittal

~

Integrated report of analyses and reviews for uprated conditions Comparable to other utilities'ecent uprating submittals Surry Vogtle

~

Planned submittal by December 29, 1995

~

Review requested by September 30, 1996

e4

go Pop TURKEY POINT NUCLEAR PLANT

++O)y~g +%4 THERMALPOWER UPRATE PROJECT III.

Forrna Con en of U rate Submi aIs

+ Format

~

Cover Letter Integrated Technical Report

+ Technical Report Content

~

Executive Summary

~

Program Description

~

NSSS Design Operating Conditions

~

Accident Analysis and Evaluations Non-LOCA Events LOCA Events Steam Generator Tube Rupture Containment Integrity Analyses Other Design Basis and Programmatic Evaluations Conclusions Summary of UFSAR Assessment (10CFR50.92)

~

NSSS and Turbine/Generator Components Review

~

NSSS and Turbine/Generator Systems Review

~

BOP Evaluations

~

Environmental Considerations

>o.

++op pe+

TURKEY POINT-NUCLEAR PLANT THERMAL POWER UPRATE PROJECT IV. Discussion

+ Best Estimate Large Break LOCA (BELOCA)

Status of NRC Review