Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17354A477 + (13:23:47, 7 January 2025)
- L-97-108, Requests That Addl Ref Be Added to Turkey Point,Units 3 & 4 TS Section 6.9.1.7, Colr + (13:23:48, 7 January 2025)
- ML17354A469 + (13:23:55, 7 January 2025)
- ML17354A467 + (13:23:56, 7 January 2025)
- ML17354A466 + (13:23:57, 7 January 2025)
- L-97-092, Monthly Operating Repts for Mar 1997 for Turkey Point Units 3 & 4 + (13:23:59, 7 January 2025)
- ML17354A465 + (13:23:59, 7 January 2025)
- ML17354A462 + (13:24:01, 7 January 2025)
- L-97-091, Forwards Annual Radioactive Effluent Release Rept for Period Jan-Dec 1996 + (13:24:02, 7 January 2025)
- 05000250/LER-1997-002-01, :on 970303,manual Reactor Trip Following Rod Control Urgent Failure Alarm Occurred.Caused by Phase Failure Detection on Stationary a Circuits of 2BD Rod Control Cabinet.Air Conditioning Replaced + (13:24:04, 7 January 2025)
- L-97-080, Responds to NRC 970203-07 Ltr Re Violations Noted in Insp Repts 50-250/97-02 & 50-251/97-02.Corrective Actions: IP-904 Has Been Revised + (13:24:11, 7 January 2025)
- L-97-082, Notifies NRC That Util Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 970513-14 + (13:24:15, 7 January 2025)
- L-97-084, Submits Results of Inservice Insp SG Tube Plugging + (13:24:18, 7 January 2025)
- 05000250/LER-1997-001-01, :on 970118,missed Surveillance on CR Position Verification Occurred Due to Inoperable Rod Deviation Monitor.Faulty Circuit Common Connection Was Corrected & Rdm Operability Was Restored + (13:24:22, 7 January 2025)
- L-97-086, Provides Rev to 120-day Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions + (13:24:23, 7 January 2025)
- ML17354A449 + (13:24:26, 7 January 2025)
- ML17354A448 + (13:24:27, 7 January 2025)
- IR 05000250/1997001 + (13:24:52, 7 January 2025)
- ML17354A445 + (13:24:54, 7 January 2025)
- ML17354A444 + (13:24:55, 7 January 2025)
- ML17354A443 + (13:24:56, 7 January 2025)
- TAC:M98149 + (13:24:57, 7 January 2025)
- ML17354A441 + (13:24:58, 7 January 2025)
- IR 05000250/1996013 + (13:24:59, 7 January 2025)
- L-97-076, Requests Change to Util Official Svc Lists for St Lucie 1 & 2 & Turkey Point 3 & 4 + (13:25:03, 7 January 2025)
- ML17354A437 + (13:25:07, 7 January 2025)
- ML17354A432 + (13:25:16, 7 January 2025)
- ML17354A431 + (13:25:17, 7 January 2025)
- ML17354A430 + (13:25:18, 7 January 2025)
- ML17354A429 + (13:25:22, 7 January 2025)
- L-97-053, Informs That FP&L Has No Candidates from Turkey Point Scheduled to Participate in General Fundamentals Exam Section of Written Operator Licensing Exam Scheduled for 970409 + (13:25:28, 7 January 2025)
- TAC:M97653 + (13:25:32, 7 January 2025)
- ML17354A424 + (13:25:33, 7 January 2025)
- ML17354A422 + (13:25:34, 7 January 2025)
- ML17354A423 + (13:25:34, 7 January 2025)
- L-97-042, Forwards Util Scope & Objectives for 1997 Turkey Point Annual Emergency Preparedness Exercise + (13:25:40, 7 January 2025)
- ML17354A418 + (13:25:43, 7 January 2025)
- ML17354A415 + (13:25:46, 7 January 2025)
- ML17354A413 + (13:25:47, 7 January 2025)
- ML17354A411 + (13:25:52, 7 January 2025)
- ML17354A410 + (13:25:53, 7 January 2025)
- ML17354A409 + (13:25:58, 7 January 2025)
- ML17354A407 + (13:25:59, 7 January 2025)
- 05000250/LER-1996-004, :on 970107,identified Three Instances of Inadequate Surveillance Testing.Caused by Inadequate Surveillance Procedures.Surveillance Procedures Revised + (13:26:00, 7 January 2025)
- 05000250/LER-1996-004-03, Forwards LER 96-004-03 Re TS Surveillance Procedure Review for Identification of Inadequate Surveillance Testing,Per GL 96-01 + (13:26:02, 7 January 2025)
- ML17354A403 + (13:26:04, 7 January 2025)
- ML17354A402 + (13:26:05, 7 January 2025)
- ML17354A400 + (13:26:06, 7 January 2025)
- ML17354A396 + (13:26:10, 7 January 2025)
- 05000364/LER-1917-003, Regarding Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits + (13:26:12, 7 January 2025)
- L-97-021, Forwards Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions + (13:26:13, 7 January 2025)