MARCH 13, 1997 Florida Power and Light Company ATTN: Mr. T. F. Plunkett President - Nuclear Division P. O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
OPERATIONAL SAFEGUARDS RESPONSE EVALUATIONPROGRAM
Dear Mr. Plunkett:
As part of the Operational Safeguards
Response
Evaluation (OSRE) program, NRC will visit licensees ifit appears that there have been changes in site protection strategy or capability that should be validated.
During the recent security inspection at Turkey Point conducted by NRC Region II on February 3-7, 1997, there were indications that this was the case.
Therefore, a limited scope visit is planned for the Turkey Point Plant on May 20-22, 199?.
These dates are the result of advance liaison between cognizant NRC Headquarters and Regional personnel and licensee personnel.
The primary objective of the OSRE program is to evaluate the readiness of licensees'nsite security forces to respond to an external threat.
NRC OSRE team personnel performing the evaluation will include two reactor safeguards specialists, three NRC contractor personnel, and a safeguards inspector from the NRC Regional office. The proposed schedule for the onsite activities is enclosed.
Please provide appropriate plant security personnel support for the OSRE personnel during the scheduled evaluation.
Every effort will be made to schedule activities to avoid disruption of normal plant operations.
Ifyou have any questions regarding the conduct of the OSRE program which you wish to have answered prior to the team's visit, please contact David Orrik, Safeguards Branch, at (301) 415-3213, or Lori Stratton of the Region II staff at (404) 331-2603.
Sincerely, ORIGINAL SIGNED BY PAUL'FREDRICKSON Paul E. Fredrickson, Chief Special Inspection Branch Division of Reactor Safety Docket Nos. 50-250, 50-251 License Nos. DPR-31, DPR-41
~
Enclosure:
Proposed Schedule of Events (cc w/encl:
See page 2) 970@f70425 9703i3 PDR ADOCK 05000250 F
PDR IIIIIII.lllllilllllliiill'IIIIIIMIIIIII
~ '
FP8L cc w/encl:
H. N. Paduano, Manager Licensing 8 Special Programs Florida Power and Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Plant General Manager Turkey Point Nuclear Plant P. O. Box 029100 Miami, FL 33102 R. J. Hovey Site Vice President Turkey Point Nuclear Plant P. O. Box 029100 Miami, FL 33102 G. E. Hollinger Licensing Manager Turkey Point Nuclear Plant P. O. Box 4332 Miami, FL 33032-4332 M. S. Ross, Attorney Florida Power & Light 11770 US Highway 1 North Palm Beach, FL 33408 John T. Butler, Esq.
Steel, Hector and Davis 4000 Southeast Financial Center Miami, FL 33131-2398 Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 (cc cont'd - See page 3)
FP8L (cc cont'd)
Armando Vidal County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, FL 33128 Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Distributfon w/encl:
T. Martin, NRR D. Matthews, NRR L. Cunningham, NRR R. Croteau, NRR D. Orrik, NRR K. Landis, Rll B. R. Crowley, Rll G. Hopper, RII PUBLIC Thomas P. Johnson Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 1448 Homestead, FL 33090 SIGNATURE, NANE DATE 5/ 97 JULIAN 03/ ~/
7 FR ICKSON 03/ IE /97 03/
/97 03/
/97 03 /
/ 97 COPY?
YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL ORO COPY U-
.L
PROPOSED SCHEDULE FOR TURKEY POINT EVALUATION MAY20-21, 1997 Tues.
8:00 am 8:30 am 8:30 am 9:00 am 10:00 am 1:00 pm 2:30 pm 4:00 pm 4:30 pm 6:00 pm 8:00 pm Entrance meeting; discuss objectives, schedule of events Licensee briefing on site security strategy Discuss, identify target sets Site specific training/access badging Tour of protected area, target equipment, paths to targets, response personnel equipment locations Time-line drills with Response Team Leader "A" Time-line drills with Response Team Leader "B" NRC team meeting; critique time-lines, identify drill scenarios for actual onsite drills NRC/Licensee discuss drill scenarios Contingency drills (two or more)
NRC team meeting; critique drills Weds.
8:00 am NRC team review of site protection strategy 10:00 am Review with Site Security Manager 11:00 am Exit briefing with licensee management 12:00 pm Exit site Ifyou'have any questions or comments, please call David Orrik, (301) 415-3213, or Ray Hsu, (301) 415-3213.
Enclosure