Text
April 4, 1997 Florida Power and Light Company ATTN:
Mr. T.
F. Plunkett President
- Nuclear Division P. 0.
Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR)
- TURKEY POINT 3 and 4
Dear Mr. Plunkett:
On March 11, 1997. the regional staff completed the semiannual Plant Performance Review (PPR) of'urkey Point 3 and 4.
The'taff conducts these reviews, for all operating nuclear'power plants to develop an integrated understanding of safety performance.
The results are used by regional management to facilitate planning and allocation of inspection resources.
The PPR for Turkey Point 3 and 4 involved the participation, of all technical divisions in evaluating inspection results and safety performance information for the period from September 1996 to March 1997.
PPRs provide regional management with a current summary of 'licensee performance and serve as inputs.
to the NRC Systematic Assessment of Licensee'erformance (SALP) and senior management meeting (SMM) reviews.
. This letter advises you of our. planned inspection effort resulting from the Turkey Point 3 and 4 PPR review.
It is provided in an attempt to minimize the resource impact on your staff and to allow for scheduling conflicts to be resolved in advance of inspection dates.
The enclosure presents our inspection plan for the next six months. 'pecific dates. are included for near term inspections.
Long term inspection dates will be announced prior to the inspections and any scheduling conflicts will be resolved with your.staff.
The rational or basis for each ins'pection outside the core inspection program is provided so that you are aware of the reasons for: emphasis in these program
.areas.
Resident inspections are not listed due to their ongoing and continuous nature, nor are region based inspections which accomplish Resident Core Modules to compensate for Resident Inspector absences'due t'o training.
During each NRC inspection planned during this period. specific attention will continue to be given to the verification of selected Updated Final Safety Analysis Report (UFSAR) commitments.
Applicable portion(s) of the UFSAR that relate to the inspection activities wi11 be reviewed and verification made that the UFSAR commitments have been proper ly implemented into plant practices, procedures and/or parameters.
9704i70i74 970404 PDR ADOCK 05000250 G
PDR OFFICIAL COPY IIH3IIMIIHIIIII3llllllftill/llllltllfl
FP8L We will inform you of any changes to the inspection plan.
If you have any questions, please contact Caudle Julian at 404-331-5526.
Sincerely, Orig signed by Kerry D. Landis Caudle A. Julian, Acting Chief Reactor Projects Branch 3
Division of Reactor Projects Docket No. 50-250 and 251 License Nos.
Enclosure:
Inspection Plan cc w/encl:
H.
N. Paduano, Manager Licensing 8 Special Piograms Florida Power and Light Company P. 0.
Box 14000 Juno Beach, FL '33408-0420 Plant General Manager Turkey Point Nuclear Plant P. 0.
Box 029100 Miami FL 33102 R. J.
- Hovey, Site Vice President Turkey Point Nuclear Plant 9760 SW 344th Street Florida City. FL 33035 G.
E. Hollinger Licensing Manager Turkey Point Nuclear Plant 9760 SW 344th Street Florida City, FL 33035 M. S.
- Ross, Attorney Florida Power
& Light 11770 US Highway 1
North Palm Beach, FL'3408 John T. Butler, Esq..
Steel.
Hector and Davis 4000 Southeast Financial Center
- Miami, FL 33131-2398.
FP8L Attorney General Department of Legal, Affairs The Capitol Tallahassee, FL 32304 Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee.
FL 32399-0700 Armando Vidal County Manager ot Metropolitan Dade County
.111 NW 1st Street, 29th Floor Miami. FL 33128 Joe Myers, Director Division of Emergency Preparedness Department of Community. Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Distribution w/encl:
- Croteau, NRR B. Crowley,.RII G. Hopper, RII PUBLIC Thomas P.
Johnson Senior Resident Inspector U.S. Nuclear Regulatory Commission P. 0.
Box 1448 Homestead, FL 33090 3
~
SEHO TO PUBLIC OOCUHENT ROON?
OFFICE YES HO SIGNATURE S
n HChristensen c-'Ho and PFredrickson arr TP b es OATE COPY?
/
/97 O
9 /97'4 f/97 YES HO YES NO
+/ 97 YES HO
/ 97 E
HO 04 /
/ 97 YES
~ $
~ ~ g I
~
~ g
~
g
~
I
~ > g
~
g g
~
~
~
g ~
I'
~
J
~
~
~ I I
g
~
I I
~
~
~
~
J
~
g ~
I ~ $
~
~
~
~ ~
I
~ g)g$
~ lg I
I' g
~
~
~
g ~ ~
~
~ ~
~
I ~
~
g g ~
~
~
~
0
~
~ g I ~
~
~
g a
~
~
~
I s
I ~
I