March 4, 1997 Florida Power and Light Company ATTN:
Hs.
H. Lacal Training Manager Turkey Point Nuclear Plant P. 0.
Box 029100 Miami, FL 33102
SUBJECT:
RESPONSE
TO QUESTIONS RAISED DURING THE REGION II 1996 U. S.
NUCLEAR REGULATORY COMMISSION (NRC) TRAINING MANAGERS'ONFERENCE
Dear Hr. Lacal:
This is forwarding the response to the four 'questions raised during our conference.
After consultation with headquarters,'these responses were determined.
a)
What is the basis for requalification hours having to be the same for active versus inactive operators?
10 CFR Part 55.55(e) recognizes the difference between licensed operators who are actively performing the function of an operator and those who are not, and defines required periods of watchstanding under
. instruction that must be completed in order to regain active status if proficiency is not maintained.
However Part 55:59, "Requalification,"
does not differentiate between active operators and inactive operators.
Each licerIsed operator is required by Part 55.59 to successfully complete
.a requalification program developed by the facility licensee in accordance with a.systems approach to training.
Logically the job
- tasks, and. therefore the training requirements for a li'censed operator do not depend on an inactive or active watchstanding status.
NRC's position on this issue was clearly stated in NUREG-1262, "Answers to
~
Questions at Public Meeting Regarding Implementation of Title 10, Code of Federal Regulations, Part 55 on.Operators'icenses."
The answer to question 335 states that the same requalification program applies to operators on shift as well as off shift.
b)
Can an operator on-site be allowed to not be in requalification.training if he is in a developmental assignment, as an operator off-site in a developmental assignment is allowed?
No.
NRR's position is that individuals who are licensed will
'articipated in a facility's continuous requalification program, as required by Part 55.53(h).
Exceptions to this requirement are considered in accordance with Part 55.59(b), for personnel who relocated out of the vicinity of. the facility for developmental
- purposes, such as a rotation at INPO, or for personnel who take a leave of absence to advance their education; 970328005i 970304 PDR ADQCK 05000250 V
PDR IlltxllllIIIIIIllilllIIllllllilllllllllEIIIIllll y0
~gql
~
FP8L c)
Can the requirement be changed to allow reactivity manipulations f'r initial candidates to be accomplished on the simulator?
The present requirement reflects the Commission's view at the time of the rule revision that candidates for operator licenses should have as a
minimum the practical experience of performing reactivity manipulations on the plant for which they seek a license.
While it may be passible to change the rule, depending on the views of the present Commission and of the staff, the requirement is not presently.considered overly burdensome to the point that rulemaking at this time is warranted.
For facilities in extended shutdowns, NRC has allowed candidates to take licensing examinations and then has held issuance of their licenses pending completion of the requirement.
Under appropriate circumstance,,
NRR can exempt candidates from the requirement.
d)
Was the recent GFES examination time validated and should itbe
?
The October 1996 GFES examination was time validated.
The examination is not intended to be time limiting, within reason.
Based on industry
- feedback, we have increased the allowed time for the GEFS examination from 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> to 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.
I trust these answers will be of assistance to you.
Also, please note we have a need to move the Training Hanager's Conference to November 12 and 13, 1997."
Sincerely, (Original signed by T. A. Peebles)
Docket Nos.: 50-250, 50-251 Thomas A. Peebles, Chief Operator Licensing and Human Performance Branch.
Division of Reactor Safety IGHATIRE DATE COPYT TPeebles 03 /
/ 97 YES
/N 03'/
/97 03/
/97" YES HO YES NO 03 /
/ 97
~
YES NO YES NO YES HO 03 /
/ 97 03 /
/ 97