Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205K676 + (20:35:45, 7 December 2024)
- ML20205K673 + (20:35:46, 7 December 2024)
- ML20205K672 + (20:35:46, 7 December 2024)
- ML20205K669 + (20:35:47, 7 December 2024)
- 05000395/LER-1999-001, :on 990311,missed Surveillance Test for Electrical Equipment Protective Devices Was Noted.Caused by Inadequate Surveillance Tps.Fire Watches Were Posted Per TS 3.8.4.3 LCO Requirements.With + (20:35:50, 7 December 2024)
- ML20205K664 + (20:35:50, 7 December 2024)
- ML20205K663 + (20:35:51, 7 December 2024)
- B17724, Informs That Millstone Unit 2 Is Expected to Be Ready for Ascension to Mode 2 on or About 990414.Unit Affirmed for Readiness for Restart Pending Approval from Nuclear Oversight.Startup Will Be Controlled IAW Plan in + (20:35:52, 7 December 2024)
- ML20205K654 + (20:35:53, 7 December 2024)
- ML20205K652 + (20:35:53, 7 December 2024)
- ML20205K646 + (20:35:54, 7 December 2024)
- ML20205K643 + (20:35:55, 7 December 2024)
- ML20205K634 + (20:35:56, 7 December 2024)
- ML20205K638 + (20:35:56, 7 December 2024)
- ML20205K626 + (20:35:59, 7 December 2024)
- ML20205K625 + (20:35:59, 7 December 2024)
- ML20205K624 + (20:36:00, 7 December 2024)
- NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with + (20:36:01, 7 December 2024)
- ML20205K617 + (20:36:02, 7 December 2024)
- ML20205K614 + (20:36:03, 7 December 2024)
- ML20205K615 + (20:36:03, 7 December 2024)
- ML20205K611 + (20:36:04, 7 December 2024)
- ML20205K609 + (20:36:05, 7 December 2024)
- ML20205K610 + (20:36:05, 7 December 2024)
- B17717, Forwards non-proprietary Version of Rev 2 to Holtec Rept HI-971843, Licensing Rept for Reclassification of Discharge in Millstone Point Unit 3 Spent Fuel Pool, Per Request. Rept Provided as Suppl Info for 990118 Application + (20:36:06, 7 December 2024)
- ML20205K603 + (20:36:07, 7 December 2024)
- ML20205K600 + (20:36:08, 7 December 2024)
- ML20205K599 + (20:36:08, 7 December 2024)
- ML20205K598 + (20:36:09, 7 December 2024)
- TXX-6359, Interim Deficiency Rept CP-86-72 Re Scope of Plant Mods Resulting from Pipe Support Reverification Program.Initially Reported on 860609.Engineering Evaluation Has Not Identified Addl Reportable Instances.Next Rept Expected by 870612 + (20:36:10, 7 December 2024)
- PY-CEI-NRR-2386, Forwards Copy of Application Submitted to FERC Proposing Transfer of Jurisdictional Transmission Facilities of Firstenergy Corp Operating Companies to American Transmission Sys,Inc.With One Oversize Drawing + (20:36:11, 7 December 2024)
- ML20205K593 + (20:36:11, 7 December 2024)
- ML20205K589 + (20:36:14, 7 December 2024)
- 0CAN049902, Informs That Corrective Action Re Software Evaluation,Per Insp Repts 50-313/98-04 & 50-368/98-04,has Been Completed. Protective Tagging Sys Expected to Be Fully Operational by 990514 + (20:36:15, 7 December 2024)
- ML20205K587 + (20:36:15, 7 December 2024)
- 05000409/LER-1999-001, :on 990305,excessive back-flow Through Return Line Check Valve Was Noted.Check Valve Were Declared Inoperable.Compensatory Actions for Fesw Sys Pipe Break Were Established.With + (20:36:17, 7 December 2024)
- ML20205K584 + (20:36:18, 7 December 2024)
- ML20205K578 + (20:36:19, 7 December 2024)
- ML20205K577 + (20:36:23, 7 December 2024)
- IR 05000010/1999007 + (20:36:24, 7 December 2024)
- RA99-068, Informs That Info Re Facility Has Been Reviewed & Verified, with Listed Discrepancies Noted,As Requested by NRC 990323 Fascimile + (20:36:25, 7 December 2024)
- ML20205K564 + (20:36:27, 7 December 2024)
- ML20205K563 + (20:36:28, 7 December 2024)
- IR 05000327/1988040 + (20:36:33, 7 December 2024)
- ML20205K561 + (20:36:33, 7 December 2024)
- ML20205K560 + (20:36:34, 7 December 2024)
- ML20205K558 + (20:36:35, 7 December 2024)
- ML20205K557 + (20:36:35, 7 December 2024)
- 0CAN108810, Forwards Proposed Rev to Table B-1, Min Staffing Requirements of Emergency Plan.Rev Reduces Required Number of Nonlicensed Operators on-shift from Three to Two + (20:36:36, 7 December 2024)
- ML20205K556 + (20:36:36, 7 December 2024)
- ML20205K552 + (20:36:37, 7 December 2024)
- ML20205K550 + (20:36:38, 7 December 2024)