Provides Clarification of Design Baseline & Verification Program Interface W/Equipment Qualification (Eq).Corrective Actions Required to Resolve Discrepancies Identified in Sys Evaluation Reviewed for Potential Impacts on EQ Program
ML20205K634
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/26/1988
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8811010266
Download: ML20205K634 (2)


Text

r

(,

a TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374ot SN 157B Lookout Place 08T 261988 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SQN) - CIARIFICATION OF THE DESIGN BASELINE AND VERIFICATION PROGRAM (DBVP) INTERFACE WITH THE EQUIPMENT QUALIFICATION (EQ)

PROGRAM

Reference:

TVA's letter to NRC dated September 30, 1988, "Sequoyah Nuclear Plant (SQN) - Clarification of the July 21, 1988 TVA/NRC Meeting on Phase II of the Design Baseline and Verification Program (DBVP)"

In response to the October 20, 1988 telephone conference call between TVA and NRC on the EQ program, TVA is providing clarification to the referenced letter.

The referenced letter was intended to state that the EQ program review of corrective actions resulting from discrepancios identified by DBVP was the same for units 1 and 2.

This misunderstanding resulted from revising the DBVP scope in the Nuclear Performance Plan, section III, for unit 1.

This.evision was made to shos that the EQ program was independent of DBVP and that DBVP did not duplicate tde efforts of the EQ program.

Corrective actJons required to resolve disetepancies identified in the system avaluatio7 by DSVP were reviewed for potential impacts on EQ program requirements by tho, EQ project as part of the plant design control proces.

Please direct questions concerning this issue to J. W. Proffitt at (615) 870-7461.

Very truly yours, TENNESSEE VALLEY AUTHORITY M. AAd/'

b. Cridley, Manager Nuclear Licensing and Regulatory Affairs cc:

See page 2 G811010266 681026 NO PDR ADOCK 05000327 An Equal Opportunity Employer P

PDC I

I o...

..s.

t U.S. Nuclear Regulatory Commission lhllf $h jhkN3 l'

cc: 1Ms. S. C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 I

Mr. F. R. McCoy, Assistant Director for Inspection Programs TVA Projects Division i

U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 i

Atlanta, Georgia 30323 Sequoyah Resident Inspector Sequoyah Nuclear Plant I

2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 r

f

=

l I

I 1

. l h

[

i

{

- -