Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205P632 + (19:59:34, 7 December 2024)
- ML20205P630 + (19:59:35, 7 December 2024)
- ML20205P631 + (19:59:35, 7 December 2024)
- ML20205P629 + (19:59:36, 7 December 2024)
- ML20205P628 + (19:59:37, 7 December 2024)
- ML20205P627 + (19:59:37, 7 December 2024)
- 05000416/LER-1986-014, :on 860411,failure to Perform Nonroutine Surveillance Retest for motor-operated Isolation Valve Thermal Overload Bypass Circuitry Identified.Caused by Procedural Error.Procedure Will Be Revised + (19:59:55, 7 December 2024)
- ML20205P623 + (19:59:56, 7 December 2024)
- ML20205P622 + (19:59:57, 7 December 2024)
- 05000352/LER-1986-017, :on 851121,absence of Gutter Internal Fire Protection Seal Noted.On 860303,addl Seals in Four Electrical Gutters Missing.Caused by Personnel Failing to Notify of Abnormal Condition.Memo Issued + (19:59:59, 7 December 2024)
- TXX-4789, Interim Deficiency Rept CP-86-25 Re Full Breaker/Fuse Coordination.Initially Reported on 860410.High Voltage & Protection Studies from Jet Impingement or Pipe Whip Ongoing.Next Rept Will Be Submitted on 860722 + (20:00:01, 7 December 2024)
- ML20205P619 + (20:00:01, 7 December 2024)
- 1CAN049902, Application for Amend to License DPR-51,revising Requirements Associated with ANO-1 Station Batteries & DC Sources to 125 Vdc Switchyard Distribution Sys + (20:00:02, 7 December 2024)
- ML20205P612 + (20:00:03, 7 December 2024)
- ML20205P610 + (20:00:04, 7 December 2024)
- ML20205P604 + (20:00:06, 7 December 2024)
- ML20205P605 + (20:00:06, 7 December 2024)
- ML20205P603 + (20:00:07, 7 December 2024)
- TXX-4790, Interim Deficiency Rept CP-86-32 Re Unidentified & Overfilled Through Wall Embedded Conduit Sleeves.Initially Reported on 860421.Evaluation of Effects of Cable Derating Continuing.Next Rept Will Be Submitted by 860724 + (20:00:07, 7 December 2024)
- ML20205P600 + (20:00:08, 7 December 2024)
- ML20205P599 + (20:00:09, 7 December 2024)
- ML20205P597 + (20:00:12, 7 December 2024)
- PNO-II-87-018, on 870316,Troxler Moisture/Density Gauge Model 3411B,containing 8 Mci Cs-137 & 40 Mci Am-241:Be Stolen from State of Fl Licensee Pickup Truck.Device Owned by Peninsula Engineering & Testing Co of Gainesville,Fl + (20:00:13, 7 December 2024)
- ML20205P595 + (20:00:14, 7 December 2024)
- ML20205P593 + (20:00:14, 7 December 2024)
- IR 05000223/1988005 + (20:00:15, 7 December 2024)
- TXX-4803, Interim Deficiency Rept CP-86-14 Re 6.9 Kv Switchgear Breaker Jack Shaft Weld Failure.Initially Reported on 860311.Unit 2 Insp Will Commence When Unit 1 Completed in Jul 1986.Next Rept Will Be Submitted by 860729 + (20:00:16, 7 December 2024)
- ML20205P591 + (20:00:16, 7 December 2024)
- ML20205P589 + (20:00:17, 7 December 2024)
- ML20205P586 + (20:00:18, 7 December 2024)
- ML20205P585 + (20:00:18, 7 December 2024)
- ML20205P583 + (20:00:19, 7 December 2024)
- ML20205P581 + (20:00:20, 7 December 2024)
- ML20205P582 + (20:00:20, 7 December 2024)
- B17735, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 2.With + (20:00:21, 7 December 2024)
- ML20205P580 + (20:00:21, 7 December 2024)
- ML20205P578 + (20:00:22, 7 December 2024)
- ML20205P576 + (20:00:24, 7 December 2024)
- B17747, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With + (20:00:25, 7 December 2024)
- ML20205P575 + (20:00:25, 7 December 2024)
- TXX-4799, Final Part 21 & Deficiency Rept CP-86-26 Re Gibbs & Hill Safety Classification of Containment Spray Sys Recirculation Lines.Initially Reported on 860414.Classification Conforms to Reg Guide & Fsar.Item Not Reportable Per 10CFR50.55(e) + (20:00:27, 7 December 2024)
- ML20205P573 + (20:00:27, 7 December 2024)
- ML20205P570 + (20:00:28, 7 December 2024)
- PNO-I-88-112A, overexposure of 33 Patients Receiving Palliative Brain Tumor Treatments Received 75% in Excess of Prescribed Dose.Misadministation Confirmed by Consultant. Radiotherapist Hosp Privileges Suspended + (20:00:28, 7 December 2024)
- ML20205P568 + (20:00:29, 7 December 2024)
- HL-5758, Forwards Response to NRC 990129 RAI Re GL 96-05 Program at Ei Hatch Nuclear Plant + (20:00:30, 7 December 2024)
- ML20205P567 + (20:00:30, 7 December 2024)
- ML20205P565 + (20:00:31, 7 December 2024)
- ML20205P563 + (20:00:32, 7 December 2024)
- PNO-III-87-044, on 870326,licensee Formally Requested Region III to Allow Restart of Unit.On 870327,region Issued Confirmatoru Action Ltr Permitting Restart & Power Ascension Program.Instrument Channel Malfunctioned During Preparation + (20:00:32, 7 December 2024)
- ML20205P559 + (20:00:34, 7 December 2024)
- ML20205P560 + (20:00:34, 7 December 2024)