Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LIC-99-0028, Provides NRC with Status of Corrective Actions Re Plant Fire Protection Program,As Result of NRC Insp Rept 50-285/97-06. Mod to MOV Is in Design Phase & Currently Scheduled for Installation During 1999 Refueling Outage + (05:58:49, 7 December 2024)
- ML20206J154 + (05:58:50, 7 December 2024)
- ML20206J150 + (05:58:51, 7 December 2024)
- IR 05000454/1988020 + (05:58:52, 7 December 2024)
- ML20206J148 + (05:58:53, 7 December 2024)
- ML20206J147 + (05:58:53, 7 December 2024)
- ML20206J146 + (05:58:54, 7 December 2024)
- 05000285/LER-1987-003, :on 870307,while Performing Main Steam Safety Valve Test,Three Safety Valves Failed to Lift within Plus/ Minus 1% of Nameplate Setpoint.Caused by Normal Drift.Valves Recalibr & Tested + (05:58:56, 7 December 2024)
- PNO-I-99-022, on 990509,Millstone Unit 2 Established Reactor Criticality.Nrc Staff Providing Augmented Insp Coverage of Restart Activities,Including round-the-clock Observations of Licensee Activities During Key Operational Evolutions + (05:58:56, 7 December 2024)
- ML20206J142 + (05:58:57, 7 December 2024)
- ML20206J141 + (05:58:58, 7 December 2024)
- PNO-II-99-016, on 990505,Hatch Unit 2 Had Main Generator Trip Form 98% Power,Due to Electrical Fault.Licensee Continuing Investigation Has Been Hampered Due to Inclement Local Weather Conditions.Plant Being Depressurized + (05:58:59, 7 December 2024)
- ML20206J137 + (05:58:59, 7 December 2024)
- RBG-23914, Forwards Rev 4 to Preservice Insp Plan Submitted on 841105. Submittal Contains 860512 Relief Request & Text Changes Identified for Rev 4.Fee Paid,Per RM Diggs 860609 Request to Cahill + (05:59:00, 7 December 2024)
- ML20206J135 + (05:59:00, 7 December 2024)
- ML20206J131 + (05:59:01, 7 December 2024)
- ML20206J130 + (05:59:02, 7 December 2024)
- ML20206J127 + (05:59:02, 7 December 2024)
- ML20206J126 + (05:59:03, 7 December 2024)
- ML20206J125 + (05:59:03, 7 December 2024)
- ML20206J124 + (05:59:04, 7 December 2024)
- ML20206J121 + (05:59:05, 7 December 2024)
- ML20206J120 + (05:59:05, 7 December 2024)
- PNO-III-86-061, on 860622,reactor Tripped as Result of Signal Showing MSIV Not Fully Open.Caused by Failed Relay in MSIV Circuitry Giving Incorrect Indication.Relay Replaced & Tested + (05:59:06, 7 December 2024)
- ML20206J119 + (05:59:06, 7 December 2024)
- ML20206J114 + (05:59:10, 7 December 2024)
- ML20206J113 + (05:59:11, 7 December 2024)
- ML20206J112 + (05:59:11, 7 December 2024)
- 05000302/LER-1988-020, :on 881012,hydraulic Snubber RCH-81 Found Disconnected at Piping End.Snubber Removed to Allow Maint on Adjacent Valve on 871119.Snubber Reinstalled.Procedure Revised for Tracking Purpose + (05:59:13, 7 December 2024)
- ML20206J109 + (05:59:22, 7 December 2024)
- ML20206J105 + (05:59:23, 7 December 2024)
- ML20206J106 + (05:59:23, 7 December 2024)
- ML20206J102 + (05:59:29, 7 December 2024)
- ML20206J098 + (05:59:29, 7 December 2024)
- ML20206J097 + (05:59:30, 7 December 2024)
- ML20206J096 + (05:59:31, 7 December 2024)
- ML20206J094 + (05:59:33, 7 December 2024)
- ML20206J093 + (05:59:34, 7 December 2024)
- ML20206J092 + (05:59:38, 7 December 2024)
- ML20206J090 + (05:59:38, 7 December 2024)
- ML20206J087 + (05:59:40, 7 December 2024)
- ML20206J085 + (05:59:41, 7 December 2024)
- ML20206J086 + (05:59:41, 7 December 2024)
- ML20206J082 + (05:59:42, 7 December 2024)
- ML20206J081 + (05:59:43, 7 December 2024)
- ML20206J079 + (05:59:44, 7 December 2024)
- ML20206J080 + (05:59:44, 7 December 2024)
- ML20206J075 + (05:59:45, 7 December 2024)
- ML20206J073 + (05:59:46, 7 December 2024)
- ML20206J074 + (05:59:46, 7 December 2024)
- ML20206J072 + (05:59:47, 7 December 2024)