Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207E197 + (02:57:23, 7 December 2024)
- ML20207E196 + (02:57:23, 7 December 2024)
- ML20207E195 + (02:57:24, 7 December 2024)
- B17671, Forwards Draft Ts,Reflecting Plant in Defueled Condition,Per NUREG-1433,Vol 1,Rev 1, Std TS GE Plants BWR/4. Matrix Included Which Cross References Current Operating TS with Proposed Draft of Defueled Specification + (02:57:25, 7 December 2024)
- NOC-AE-00453, Annual Personnel Exposure Rept. with + (02:57:28, 7 December 2024)
- B17685, Annual Rept. with + (02:57:30, 7 December 2024)
- ML20207E187 + (02:57:31, 7 December 2024)
- ML20207E188 + (02:57:31, 7 December 2024)
- 05000331/LER-1999-003, :on 990209,both Trains of CR Standby Filter Units (Sfu) Were Declared Inoperable.Caused by Failure of Low Flow Pressure Differential Switch (Pds).Replaced PDS in B Sfu & Tested & Restored a Sfu.With + (02:57:33, 7 December 2024)
- ML20207E185 + (02:57:34, 7 December 2024)
- ML20207E184 + (02:57:35, 7 December 2024)
- ML20207E182 + (02:57:36, 7 December 2024)
- ML20207E183 + (02:57:36, 7 December 2024)
- IR 05000322/1988006 + (02:57:37, 7 December 2024)
- ML20207E178 + (02:57:38, 7 December 2024)
- ML20207E177 + (02:57:39, 7 December 2024)
- L-99-091, Application for Amends to Licenses NPF-66 & NPF-73,revising Frequency Notation for Manual Functions Specified in ESFAS TS to More Clearly Denote Appropriate Refueling Frequency for Testing + (02:57:40, 7 December 2024)
- ML20207E173 + (02:57:41, 7 December 2024)
- ML20207E170 + (02:57:42, 7 December 2024)
- ML20207E171 + (02:57:42, 7 December 2024)
- ML20207E169 + (02:57:43, 7 December 2024)
- ML20207E168 + (02:57:43, 7 December 2024)
- ML20207E167 + (02:57:44, 7 December 2024)
- ML20207E163 + (02:57:45, 7 December 2024)
- ML20207E161 + (02:57:48, 7 December 2024)
- ML20207E159 + (02:57:49, 7 December 2024)
- ML20207E158 + (02:57:50, 7 December 2024)
- ML20207E156 + (02:57:50, 7 December 2024)
- ML20207E155 + (02:57:51, 7 December 2024)
- ML20207E152 + (02:57:52, 7 December 2024)
- IR 05000445/1986007 + (03:00:56, 7 December 2024)
- ML20207E149 + (03:00:57, 7 December 2024)
- 05000263/LER-1999-004-01, :on 990422,low Reactor Water Level Scram,Group 2 & 3 Isolations & Subsequent HPCI Became Inoperable.Caused by Feedwater Controller Power Supply Failure.Three Power Supplies Replaced & Connections Cleaned.With + (03:01:00, 7 December 2024)
- ML20207E145 + (03:01:01, 7 December 2024)
- ML20207E143 + (03:01:02, 7 December 2024)
- ML20207E144 + (03:01:02, 7 December 2024)
- ML20207E142 + (03:01:03, 7 December 2024)
- ML20207E140 + (03:01:04, 7 December 2024)
- ML20207E141 + (03:01:04, 7 December 2024)
- IR 05000338/1998011 + (03:01:09, 7 December 2024)
- BSEP-99-0085, Forwards Proprietary Rev 67 to EPIP OPEP-App a, Emergency Response Resources & non-proprietary Rev 53 to Radiological Emergency Response Plan, Rev 15 to EPIP OPEP- 03.8.2 & Rev 17 to EPIP OPEP-04.2.Proprietary Info Withheld + (03:01:10, 7 December 2024)
- ML20207E136 + (03:01:11, 7 December 2024)
- ML20207E133 + (03:01:12, 7 December 2024)
- ML20207E132 + (03:01:13, 7 December 2024)
- ML20207E128 + (03:01:14, 7 December 2024)
- ML20207E127 + (03:01:15, 7 December 2024)
- IR 05000245/1998006 + (03:01:32, 7 December 2024)
- ML20207E125 + (03:01:36, 7 December 2024)
- ML20207E124 + (03:01:37, 7 December 2024)
- SECY-99-0128, Notation Vote Approving SECY-99-0128 Re Proposed License to Export Natural Uranium to Canada for Test & Evaluation of Avlis Feed Material + (03:01:38, 7 December 2024)
- ML20207E117 + (03:01:39, 7 December 2024)