|
---|
Category:ENVIRONMENTAL MONITORING REPORTS(&RADIOLOGICAL)-PERIODIC
MONTHYEARNOC-AE-000476, 1998 Annual Environ Operating Rept for STP Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Environ Operating Rept for STP Units 1 & 2. with NOC-AE-00453, Annual Personnel Exposure Rept. with1998-12-31031 December 1998 Annual Personnel Exposure Rept. with NOC-AE-0098, Annual Radioactive Effluent Release Rept for South Texas Project Electric Generating Station1997-12-31031 December 1997 Annual Radioactive Effluent Release Rept for South Texas Project Electric Generating Station ML20246Q0581997-12-31031 December 1997 1997 Annual Environ & Annual Radiological Environ Operating Repts, for South Texas Project ST-HL-AE-5597, Annual Personnel Exposure Rept1996-12-31031 December 1996 Annual Personnel Exposure Rept ST-HL-AE-5593, Annual Radioactive Effluent Release Rept for 1996 for South Tx Project Electric Generating Station1996-12-31031 December 1996 Annual Radioactive Effluent Release Rept for 1996 for South Tx Project Electric Generating Station ML20148L9751996-12-31031 December 1996 Corrected 1996 Environ Rept,Annual Environ & Annual Radiological Environ Operating Repts ST-HL-AE-5641, 1996 Envrion Rept:Annual Environ & Annual Radiological Environ Operating Repts1996-12-31031 December 1996 1996 Envrion Rept:Annual Environ & Annual Radiological Environ Operating Repts ML20140B9261996-12-31031 December 1996 Errata to 1996 Annual Radioactive Effluent Release Rept ST-HL-AE-5356, 1995 Annual Environ & Annual Radiological Environ Repts STP Electric Generating Station1995-12-31031 December 1995 1995 Annual Environ & Annual Radiological Environ Repts STP Electric Generating Station ST-HL-AE-5312, Annual Radioactive Effluent Release Rept for 19951995-12-31031 December 1995 Annual Radioactive Effluent Release Rept for 1995 ST-HL-AE-5298, Annual Personnel Exposure Rept for 19951995-12-31031 December 1995 Annual Personnel Exposure Rept for 1995 ST-HL-AE-5013, Annual Personnel Exposure Rept1994-12-31031 December 1994 Annual Personnel Exposure Rept ST-HL-AE-5012, Annual Radioactive Effluent Release Rept,940101-1231. W/1994-12-31031 December 1994 Annual Radioactive Effluent Release Rept,940101-1231. W/ ST-HL-AE-5078, 1994 Annual Environ & Annual Radiological Environ Operating Repts1994-12-31031 December 1994 1994 Annual Environ & Annual Radiological Environ Operating Repts ML20029D2861993-12-31031 December 1993 1993 Annual Environ & Annual Radiological Environ Operating Repts South Tx Project Electric Generating Station. W/ 940427 Ltr ST-HL-AE-4706, Annual Radioactive Effluent Release Rept Jan-Dec 19931993-12-31031 December 1993 Annual Radioactive Effluent Release Rept Jan-Dec 1993 ST-HL-AE-4711, Annual Repts Required by TS 6.9.1.2 & 10CFR20.407,consisting of Annual Personnel Exposure Repts & Rept of Results of Specific Activity Analyses for Any Primary Coolant Samples Exceeding TS 3.4.8 Limits1993-12-31031 December 1993 Annual Repts Required by TS 6.9.1.2 & 10CFR20.407,consisting of Annual Personnel Exposure Repts & Rept of Results of Specific Activity Analyses for Any Primary Coolant Samples Exceeding TS 3.4.8 Limits ML20029D2331993-12-31031 December 1993 1993 Annual Environ & Annual Radiological Environ Operating Repts South Tx Project Electric Generating Station. W/ 940427 Ltr ST-HL-AE-4182, Semiannual Radioactive Effluent Release Rept for 920101 Through 9206301992-06-30030 June 1992 Semiannual Radioactive Effluent Release Rept for 920101 Through 920630 ST-HL-AE-4021, Semiannual Radioactive Effluent Release Rept for Jul-Dec 19911991-12-31031 December 1991 Semiannual Radioactive Effluent Release Rept for Jul-Dec 1991 ST-HL-AE-4020, Annual Personnel Exposure Repts for 1991 for South Texas Project1991-12-31031 December 1991 Annual Personnel Exposure Repts for 1991 for South Texas Project ST-HL-AE-4073, Annual Radiological Environ Operating Rept 19911991-12-31031 December 1991 Annual Radiological Environ Operating Rept 1991 ST-HL-AE-4072, Annual Environ Operating Rept for South Texas Project Electric Generating Station Jan-Dec 19911991-12-31031 December 1991 Annual Environ Operating Rept for South Texas Project Electric Generating Station Jan-Dec 1991 ST-HL-AE-3857, Semiannual Radioactive Effluent Release Rept for South Texas Project Electric Generating Station Unit 1 & 2 for Jan-June 19911991-06-30030 June 1991 Semiannual Radioactive Effluent Release Rept for South Texas Project Electric Generating Station Unit 1 & 2 for Jan-June 1991 ST-HL-AE-3735, Annual Environ Operating Rept for 19901990-12-31031 December 1990 Annual Environ Operating Rept for 1990 ST-HL-AE-3742, 1990 Annual Radiological Environ Operating Rept1990-12-31031 December 1990 1990 Annual Radiological Environ Operating Rept ML20029A7031990-12-31031 December 1990 Annual Personnel Exposure Repts for 1990. W/910225 Ltr ML20029B5241990-12-31031 December 1990 Semiannual Radioactive Effluent Release Rept for Jul-Dec 1990. W/910304 Ltr ST-HL-AE-3552, Semiannual Radioactive Effluent Release Rept for First Half 19901990-06-30030 June 1990 Semiannual Radioactive Effluent Release Rept for First Half 1990 ML20012A1271989-12-31031 December 1989 Semiannual Radioactive Effluent Release Rept for Second Half 1989. W/900228 Ltr ML20042E9941989-12-31031 December 1989 1989 Annual Radiological Environ Operating Rept. W/900430 Ltr ML20059E0821989-12-31031 December 1989 Corrected Semiannual Radioactive Effluent Release Rept for Second Half of 1989 ST-HL-AE-3218, Semiannual Radioactive Effluent Release Rept,Jan-June 19891989-06-30030 June 1989 Semiannual Radioactive Effluent Release Rept,Jan-June 1989 ST-HL-AE-3066, Suppl to Semiannual Effluent Release Rept for Jul-Dec 1988. Condenser Vacuum Exhaust Sys Process Flowmeter Removed from Svc on 881101.Condenser Vacuum Exhaust Will Be Rerouted to Unit Vent1989-05-0101 May 1989 Suppl to Semiannual Effluent Release Rept for Jul-Dec 1988. Condenser Vacuum Exhaust Sys Process Flowmeter Removed from Svc on 881101.Condenser Vacuum Exhaust Will Be Rerouted to Unit Vent ST-HL-AE-3075, Npod 1988 Annual Environ Operating Rept1988-12-31031 December 1988 Npod 1988 Annual Environ Operating Rept ST-HL-AE-3079, Npod 1988 Annual Radiological Environ Operating Rept. W/1988-12-31031 December 1988 Npod 1988 Annual Radiological Environ Operating Rept. W/ ML20235U8281988-12-31031 December 1988 Semiannual Radioactive Effluent Release Rept,Jul-Dec 1988 ST-HL-AE-3001, Annual Exposure Rept 19881988-12-31031 December 1988 Annual Exposure Rept 1988 ST-HL-AE-2769, Semiannual Radioactive Effluent Release Rept for 880308- 06301988-06-30030 June 1988 Semiannual Radioactive Effluent Release Rept for 880308- 0630 ST-HL-AE-2636, Annual Environ Operating Rept for 19871987-12-31031 December 1987 Annual Environ Operating Rept for 1987 ST-HL-AE-2638, Preoperational Radiological Environ Monitoring Rept for 19871987-12-31031 December 1987 Preoperational Radiological Environ Monitoring Rept for 1987 ST-HL-AE-2537, Personnel Monitoring - Annual Statistical Rept for 19871987-12-31031 December 1987 Personnel Monitoring - Annual Statistical Rept for 1987 ST-HL-AE-1719, Impingement/Entrainment Monitoring Program Progress Rept for First Quarter 1986,per Fes.No Data Collected Since Pumping Occurred on 8601061986-08-11011 August 1986 Impingement/Entrainment Monitoring Program Progress Rept for First Quarter 1986,per Fes.No Data Collected Since Pumping Occurred on 860106 ST-HL-AE-1637, Rept 4,Colorado River Entrainment & Impingement Monitoring Program Phase Two Studies,Oct-Dec 19851985-12-31031 December 1985 Rept 4,Colorado River Entrainment & Impingement Monitoring Program Phase Two Studies,Oct-Dec 1985 ST-HL-AE-1672, 1985 Preoperational Radiological Environ Monitoring Rept1985-12-31031 December 1985 1985 Preoperational Radiological Environ Monitoring Rept ST-HL-AE-1358, Submits Rept of Progress of Entrainment & Impingement During Cooling Reservoir Filling Operation,Per Fes.Pumping During Second Quarter 1985 Consisted of Sporadic Pumping on 850621, 24,25 & 26.No Data Collected During Limited Pumping1985-09-16016 September 1985 Submits Rept of Progress of Entrainment & Impingement During Cooling Reservoir Filling Operation,Per Fes.Pumping During Second Quarter 1985 Consisted of Sporadic Pumping on 850621, 24,25 & 26.No Data Collected During Limited Pumping ML20115F1431985-04-30030 April 1985 Colorado River Entrainment & Impingement Monitoring Program,Phase Two Studies - Jul-Dec 1984, Rept 2 ST-HL-AE-1269, Submits First Quarter 1985 Rept on Progress of Entrainment & Impingement Programs Conducted During Cooling Reservoir Filling Operations,Per Fes.Pump Operation Did Not Occur1985-03-31031 March 1985 Submits First Quarter 1985 Rept on Progress of Entrainment & Impingement Programs Conducted During Cooling Reservoir Filling Operations,Per Fes.Pump Operation Did Not Occur ML20100L0281984-10-31031 October 1984 Rept 1,Colorado River Entrainment & Impingement Monitoring Program,Phase Two Studies - Jul 1983 - June 1984 1998-12-31
[Table view] Category:TEXT-ENVIRONMENTAL REPORTS
MONTHYEARNOC-AE-00472, NPDES Noncompliance Notification:On 981002,Cs-137,current Nominal Activity 144.7 Uci,Was Discovered Leaking in Excess of 0.005 Uci.Source Has Been Withdrawn from Use & Tested for Leakage with No Indication of Leakage1999-03-23023 March 1999 NPDES Noncompliance Notification:On 981002,Cs-137,current Nominal Activity 144.7 Uci,Was Discovered Leaking in Excess of 0.005 Uci.Source Has Been Withdrawn from Use & Tested for Leakage with No Indication of Leakage NOC-AE-000476, 1998 Annual Environ Operating Rept for STP Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Environ Operating Rept for STP Units 1 & 2. with NOC-AE-00453, Annual Personnel Exposure Rept. with1998-12-31031 December 1998 Annual Personnel Exposure Rept. with ML20153D0831998-09-22022 September 1998 Environ Assessment & Finding of No Significant Impact Re Proposed Merger Between Central & Southwest Corp & American Electric Power Co,Inc NOC-AE-0098, Annual Radioactive Effluent Release Rept for South Texas Project Electric Generating Station1997-12-31031 December 1997 Annual Radioactive Effluent Release Rept for South Texas Project Electric Generating Station ML20246Q0581997-12-31031 December 1997 1997 Annual Environ & Annual Radiological Environ Operating Repts, for South Texas Project ST-HL-AE-5597, Annual Personnel Exposure Rept1996-12-31031 December 1996 Annual Personnel Exposure Rept ML20140B9261996-12-31031 December 1996 Errata to 1996 Annual Radioactive Effluent Release Rept ST-HL-AE-5641, 1996 Envrion Rept:Annual Environ & Annual Radiological Environ Operating Repts1996-12-31031 December 1996 1996 Envrion Rept:Annual Environ & Annual Radiological Environ Operating Repts ST-HL-AE-5593, Annual Radioactive Effluent Release Rept for 1996 for South Tx Project Electric Generating Station1996-12-31031 December 1996 Annual Radioactive Effluent Release Rept for 1996 for South Tx Project Electric Generating Station ML20148L9751996-12-31031 December 1996 Corrected 1996 Environ Rept,Annual Environ & Annual Radiological Environ Operating Repts ST-HL-AE-5298, Annual Personnel Exposure Rept for 19951995-12-31031 December 1995 Annual Personnel Exposure Rept for 1995 ST-HL-AE-5312, Annual Radioactive Effluent Release Rept for 19951995-12-31031 December 1995 Annual Radioactive Effluent Release Rept for 1995 ST-HL-AE-5356, 1995 Annual Environ & Annual Radiological Environ Repts STP Electric Generating Station1995-12-31031 December 1995 1995 Annual Environ & Annual Radiological Environ Repts STP Electric Generating Station ST-HL-AE-5012, Annual Radioactive Effluent Release Rept,940101-1231. W/1994-12-31031 December 1994 Annual Radioactive Effluent Release Rept,940101-1231. W/ ST-HL-AE-5078, 1994 Annual Environ & Annual Radiological Environ Operating Repts1994-12-31031 December 1994 1994 Annual Environ & Annual Radiological Environ Operating Repts ST-HL-AE-5013, Annual Personnel Exposure Rept1994-12-31031 December 1994 Annual Personnel Exposure Rept ML20029D2331993-12-31031 December 1993 1993 Annual Environ & Annual Radiological Environ Operating Repts South Tx Project Electric Generating Station. W/ 940427 Ltr ST-HL-AE-4706, Annual Radioactive Effluent Release Rept Jan-Dec 19931993-12-31031 December 1993 Annual Radioactive Effluent Release Rept Jan-Dec 1993 ML20029D2861993-12-31031 December 1993 1993 Annual Environ & Annual Radiological Environ Operating Repts South Tx Project Electric Generating Station. W/ 940427 Ltr ST-HL-AE-4711, Annual Repts Required by TS 6.9.1.2 & 10CFR20.407,consisting of Annual Personnel Exposure Repts & Rept of Results of Specific Activity Analyses for Any Primary Coolant Samples Exceeding TS 3.4.8 Limits1993-12-31031 December 1993 Annual Repts Required by TS 6.9.1.2 & 10CFR20.407,consisting of Annual Personnel Exposure Repts & Rept of Results of Specific Activity Analyses for Any Primary Coolant Samples Exceeding TS 3.4.8 Limits ST-HL-AE-4182, Semiannual Radioactive Effluent Release Rept for 920101 Through 9206301992-06-30030 June 1992 Semiannual Radioactive Effluent Release Rept for 920101 Through 920630 ST-HL-AE-4020, Annual Personnel Exposure Repts for 1991 for South Texas Project1991-12-31031 December 1991 Annual Personnel Exposure Repts for 1991 for South Texas Project ST-HL-AE-4073, Annual Radiological Environ Operating Rept 19911991-12-31031 December 1991 Annual Radiological Environ Operating Rept 1991 ST-HL-AE-4021, Semiannual Radioactive Effluent Release Rept for Jul-Dec 19911991-12-31031 December 1991 Semiannual Radioactive Effluent Release Rept for Jul-Dec 1991 ST-HL-AE-4072, Annual Environ Operating Rept for South Texas Project Electric Generating Station Jan-Dec 19911991-12-31031 December 1991 Annual Environ Operating Rept for South Texas Project Electric Generating Station Jan-Dec 1991 ST-HL-AE-3913, NPDES Noncompliance Notification:On 911010,several Hundred Dead Fish Discovered at Circulating Water Discharge Structure.Caused by Possible Chlorine Toxicity.Fish Specimens Delivered to Texas A&M for Exam1991-10-31031 October 1991 NPDES Noncompliance Notification:On 911010,several Hundred Dead Fish Discovered at Circulating Water Discharge Structure.Caused by Possible Chlorine Toxicity.Fish Specimens Delivered to Texas A&M for Exam ML20079L7161991-10-0202 October 1991 Renewed & Amended State of Tx NPDES Permit TX0064947 Issued to Houston Lighting & Power Co ST-HL-AE-3857, Semiannual Radioactive Effluent Release Rept for South Texas Project Electric Generating Station Unit 1 & 2 for Jan-June 19911991-06-30030 June 1991 Semiannual Radioactive Effluent Release Rept for South Texas Project Electric Generating Station Unit 1 & 2 for Jan-June 1991 ST-HL-AE-3742, 1990 Annual Radiological Environ Operating Rept1990-12-31031 December 1990 1990 Annual Radiological Environ Operating Rept ST-HL-AE-3735, Annual Environ Operating Rept for 19901990-12-31031 December 1990 Annual Environ Operating Rept for 1990 ML20029A7031990-12-31031 December 1990 Annual Personnel Exposure Repts for 1990. W/910225 Ltr ML20029B5241990-12-31031 December 1990 Semiannual Radioactive Effluent Release Rept for Jul-Dec 1990. W/910304 Ltr ST-HL-AE-3552, Semiannual Radioactive Effluent Release Rept for First Half 19901990-06-30030 June 1990 Semiannual Radioactive Effluent Release Rept for First Half 1990 ML20012A1271989-12-31031 December 1989 Semiannual Radioactive Effluent Release Rept for Second Half 1989. W/900228 Ltr ML20042E9941989-12-31031 December 1989 1989 Annual Radiological Environ Operating Rept. W/900430 Ltr ML20059E0821989-12-31031 December 1989 Corrected Semiannual Radioactive Effluent Release Rept for Second Half of 1989 ST-HL-AE-3218, Semiannual Radioactive Effluent Release Rept,Jan-June 19891989-06-30030 June 1989 Semiannual Radioactive Effluent Release Rept,Jan-June 1989 ST-HL-AE-3066, Suppl to Semiannual Effluent Release Rept for Jul-Dec 1988. Condenser Vacuum Exhaust Sys Process Flowmeter Removed from Svc on 881101.Condenser Vacuum Exhaust Will Be Rerouted to Unit Vent1989-05-0101 May 1989 Suppl to Semiannual Effluent Release Rept for Jul-Dec 1988. Condenser Vacuum Exhaust Sys Process Flowmeter Removed from Svc on 881101.Condenser Vacuum Exhaust Will Be Rerouted to Unit Vent ST-HL-AE-3075, Npod 1988 Annual Environ Operating Rept1988-12-31031 December 1988 Npod 1988 Annual Environ Operating Rept ST-HL-AE-3079, Npod 1988 Annual Radiological Environ Operating Rept. W/1988-12-31031 December 1988 Npod 1988 Annual Radiological Environ Operating Rept. W/ ML20235U8281988-12-31031 December 1988 Semiannual Radioactive Effluent Release Rept,Jul-Dec 1988 ST-HL-AE-3001, Annual Exposure Rept 19881988-12-31031 December 1988 Annual Exposure Rept 1988 ST-HL-AE-2769, Semiannual Radioactive Effluent Release Rept for 880308- 06301988-06-30030 June 1988 Semiannual Radioactive Effluent Release Rept for 880308- 0630 ML20153E9741988-03-31031 March 1988 Errata to Environ Protection Plan (Nonradiological) ST-HL-AE-2636, Annual Environ Operating Rept for 19871987-12-31031 December 1987 Annual Environ Operating Rept for 1987 ST-HL-AE-2638, Preoperational Radiological Environ Monitoring Rept for 19871987-12-31031 December 1987 Preoperational Radiological Environ Monitoring Rept for 1987 ST-HL-AE-2537, Personnel Monitoring - Annual Statistical Rept for 19871987-12-31031 December 1987 Personnel Monitoring - Annual Statistical Rept for 1987 ML20215G7441987-06-16016 June 1987 Amend 10 to Environ Rept ML20214H0341987-04-30030 April 1987 Final Rept-Colorado River Entrainment & Impingement Monitoring Program,Phase 2 Studies,Jul 1983 - Nov 1985 1999-03-23
[Table view] |
Text
_ .. ._ ~ . . - . _ _ _ . . _._..._._.m . _ . _ . _ _ _ . _ _ . . . _ _ . - . - __ . _ .
l l
Nuclear Operating Company-
. Sondh TaasPhteetEkstrkGwatMgStatkm 20 Aw289 Khdsurth Teus77483 m February 24, 1999 :
NOC-AE-00453 !
File No. G02 U. S. Nuclear Regulatory Commission !
Attention: Document Control Desk I Washington,DC 20555 South Texas Project Units 1 & 2 Docket Nos. STN 50-498 & 50-499 Annual Reports Reauired by Technical Specification 6.9.1.2 Attached are the Annual Reports required by the South Texas Project Technical Specification 6.9.1.2. Attachment 1 is the Annual Personnel Exposure Report required by Technical Specification 6.9.1.2.a. Attachment 2 is the annual report required by Technical !
Specification 6.9.1.2.b of the results of specific activity analyses for any primary coolant samples exceeding Technical Specification 3.4.8 limits.
If you have any questions on this matter, please contact Mr. S. M. Head at (361) 972-7136 or me at (361) 972-7566. ,
Af /
G.T. Powell ;
Manager, Health Physics I
) \
PLA/
Attachments: 1) Annual Personnel Exposure Report S
'2) A Report of Results of Specific Activity Analyses for any Primary Coolant Samples Exceeding the Technical Specification 3.4.8 Limits
~
99031'001'80 981231 PDR ADOCK 05000498 .f: O. $
R PDR j wp\nl\nrc-ap\rrep98\ts00453 STI 30821748
,m. - .
NOC-AE-000453 File No.: G02 l
--. < Page 2 Ellis W. Merschoff Jon C. Wood - j
- Regional Administrator, Region IV Matthews & Branscomb U. S. Nuclear Regulatory Commission- One Alamo Center . ,
611 Ryan Plaza Drive, Suite 400 106 S. St. Mary's Street, Suite 700 l
Arlington, TX 76011-8064 . San Antonio, TX 78205-3692 Thomas W. Alexion - Institute of Nuclear Power Project Manager, Mail Code 13H3 Operations - Records Center ;
U. S. Nuclear Regulatory Commission 700 Galleria Parkway i Washington, DC 20555-0001 Atlanta, GA 30339-5957 i Cornelius F. O'Keefe Richard A. Ratliff Sr. Resident Inspector Bureau of Radiation Control ;
c/o U. S. Nuclear Regulatory Commission Texas Department of Health P. O. Box 910 1100 West 49th Street Bay City, TX 77404-0910 Austin, TX 78756-3189 !
J. R. Newman, Esquire D. G. Tees /R. L. Balcom l Morgan, Lewis & Bockius Houston Lighting & Power Co. i 1800 M. Street, N.W. P. O. Box 1700 ,
Washington, DC 20036-5869 Houston,TX 77251 '
M. T. Hardt/W. C. Gunst Central Power and Light Company i City Public Service ATTN: G. E. Vaughn/C. A. Johnson P. O. Box 1771 P. O. Box 289, Mail Code: N5012 ;
San Antonio,TX 78296 Wadsworth,TX 77483 i
A. Ramirez/C. M. Canady U. S. Nuclear Regulatory Commission City of Austin - Attention: Document Control Desk Electric Utility Department Washington, D.C. 20555-0001 721 Barton Springs Road Austin, TX .78704 n
i
+
. . . ~ . - - . . - _ . - . . . - . - . . . - . . - - - - - - - - - - - - - . . - - - -
k
, Attachment i NOC-AE-00453 Page 1 of 3 l
t i
ANNUAL PERSONNEL EXPOSURE REPORT Technical Specification 6.9.1.2.a requires a tabulation on an annual basis of the number l of station, utility, and other personnel (including contractors) receiving exposures gieater than ;
100 mrem /yr according to work and job functions. This data is based on self-reading dosimetry {
results and is pmsented on page two of this attachment. Specific tasks included in the Special ,
Maintenance work and job function are listed on page three - i 5
s i
I i
l l
l l
4 1
a l
1 l
i
- -q i .
! Attrchment 1 -
02nm 4.T 13.1t Plant Radiation Exposure Planning And Reporting Databas* NOC-AE-00453 !
[' W STP NVOLEAR OPEM T.J COMPANY Ibc 2 Of 3 Addre.e : Post Othos Don 289
- Wadeswth, Tense 77483 APPENDIX A NRC Wees Number (s) ; NPF . 78: 9F . 60 REPORTVM3 YEAR 1996 Page t OF 1 '
STANDARD FOPJfAT POR REPORTING NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB ? UNCTION l
l l
NUMBER OF PERSONNEL (> 100 MREM)
TOTAL MAN 4LEM (ALL PERSONNEL) i STATION UTluTY CONTRACTORS STATION UTIUTY CONTRACTORS
& JOB EMPLOYEES EMPLOYEES AND CTHERS EMP'.OYEES EMPLOYEES AND OTHERS i l REACTOR OPS & SURVEILANCE OPERAftONS 17 0 0 6A00 0.000 0.001 ,
- 4AINTENANCE - 1 0 1 0.749 0.000 0As6 ;
ENGINtERING 1 0 0 0.600 0 000 0417 GEN. SUPPORT 20 0 20 TA12 0D00 8.667 NUCLEAR A&L - 1 0 0 0312 0400 0.016 i CTHER 2 0 2 0.661 0.000 0.706 !
[- ROUTINE MAINTENANCE I OPERATIONS 0 0 0 CDS9 0.000 0.000 l 6 MAINTENANCE 9 0 9 SA40 0.000 2A40 ,
ENGINEERING 0 0 0 0.138 0.000 OArm I i GEN. SUPPORT C 0 63 0210 9.000 20.303 NUCLEAR /.&L 0 0 0 OD80 0.000 0.070 OTHEh 1 0 0 0284 0400 0.137 IN4ERVICE INSPECTSON OPERATIONS 0 0 0 0.008 0400 0 o00 MAINTENANCE 8 0
- 14 1.811 0400 8436 ENGINEERING 8 0 2 1A91 0.000 CA79 GEN. SUPPORT 1 0 0 0211 0400 0426 NUCLEAR A&L 1 0 0 0.176 0.000 CA71 CTHEa 6 0 0 0.864 0o00 0.000 l SPECIAL MAINTENANCE OPERATIONS 0 0 0 0213 0.000 0.000 MAINTENANCE 34 0 10 9.127 0.000 2A89 JNQlNEERING 2 0 0 0249 0.000 0.000 l GEN. SUPPORT 8 0 178 2A79 0.000 44.410 NUCLEAR A&L 0 0 8 Ob34 0h00 0.628 i CTHER 2 0 1 0A23 0.000 0363 CASTE PROCESSING j OPERATIONS , 0 0 CA34 0.000 0.000 MAINTENANCE O O O Ch41 Oh00 0.044 ENGINEERING 0 0 0 0400 0D00 Choo GEN. SUPPORT 4 0 16 2.040 0.000 4236 i NUCLEAR A&L 1 0 0 CD60 040- 0.000 OTHER 0 0 0 0.048 0.00L 0.130 REFUELING OPERATX3NS 8 0 0 0,378 OD00 0.000 MAINTENANCE 16 0 0 4376 0400 0.089 I EhGINEERING 3 0 0 0A66 0.000 0h00 i QEN. SUPPORT 8 0 40 '2.788 0.000 11.026 NUCLEAR A&L 2 0 0 0322 0.000 0.000 l
l OTHEa 6 0 0 0468 0.000 Ch06 TOTAL WORK & JO3 FUNCTION OPERATIONS 21 0 0 6.492 0.000 0.001 i
MAANTENANCE 67 0 34 19443 0.000 9.663 l
l ENQiNEERING 14 0 2 1894 0.000 496 i l GEN. SUPPORT 41 0 314 16 649 0.000 129.*36 NUCLEAR A&L 6 0 8 1.173 0.000 1.084 OTHER 16 0 8 3.028 0.000 1.331 GRAND TOTAL 163 0 366 49.479 0.000 142.030 l
1
.W
p T Attachment 1 NOC-AE-00453 Page 3 of 3 1998 Annual Personnel Exposure Report Technical Specification 6.9.1.2 Additional Information
- 1. The South Texas Project includes two 1250 Mw, Westinghouse four loop pressurized water reactors.
- 2. During 1998, Unit 2 completed its sixth refueling outage in 21.5 days that included the following special maintenance activities:
a) Primary inspections on all Unit 2 steam generators (100% eddy cunent) with 102 tubes plugged, two tubes pulled, and video inspection of plugs b) Secondary side inspections and sludge lancing on all Unit 2 steam generators c) Reactor coolant pump motor interference removal for two pumps to prepare for pump removal d) Removal and replacement of reactor coolant pump 2D l
e) Removal and replacement of three thimbic tubes Exposure rates inside the secondary shield wall during this outage were higher than during previous outages due to an increase in the Co 58 activity in the primary system. i
~
The outage dose was 174 rem as measured by the electronic dosirnetry system. The highest individual exposure was 1.478 rem.
- 3. The estimated exposure described in this report is based on electronic dosimeter j (ALNOR) values. j l
Attachment 2 NOC-AE-00453 Page1of1 Primary Coolant Specific Activity Report Technical Specification 6.9.1.2.b requires the results of the specific activity analyses in which the primary coolant exceeded the limits of Technical Specification 3.4.8 to be reported on an annual basis.
Unit I and Unit 2 have not exceeded the limits of Technical Specification 3.4.8 for the calendar year of 1998.
- _ _ - - - _ _ - - - _