.e-AUG 0 81988 Docket No. 50-440 The Cleveland Electric illuminating Company ATTN: Mr. Alvin Kaplan Vice President Nuclear Gro'ip 10 Center Road Perry, OH 44081 Gentlemen:
This refers to the Cleveland Electric Illuminating Company request for Enforcement Discretion to voluntarily enter Technical Specification Limiting Condition for Operation Action Statements 3.3.1 and 3.3.2 in order to safely establish flow thru feedwater 6A heater as stated in your letter to Davis, letter of August 4, 1988.
We have thoroughly reviewed and evaluated the context of your request and have discussed the subject with NRC Headquarters management.
Based on our in-depth discussion and reviews, we have concluded that your justification for voluntarily bypassing the Main Steam Line (MSL) Radiation Monitor trips while establishing flow thru feedwater heater 6A provided the necessary infonnation to support the NRC's granting of this relief on a one-time basis.
Based on the infonnation provided relative to the effects expected during establishing flow to the 6A feedwater heater and the monitoring of the nonbypassed MSL radiation monitoring channels, your request to voluntarily enter into the technical specification action statement was granted.
In accordance with Section 2.790 of the NRC's "Rules for Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.
8808170096 880000 PDR ADOCK 05000440
) O p
PNU fE4 i
The Cleveland Electric Illuminating 2
Company d
No reply to this letter is required; however, should you have questions on the basis of conclusions reached by the NRC, or if you need clarification on the decision, please let us know and we will be pleased to discuss them with you.
Sincerely, Original signed by A. Bert Davis A. Bert Davis Regional Administrator
Attachment:
Ltr dtd 8/4/88 Al Kaplan to A. Bert Davis cc:
F. R. Stead, Director, Nuclear Support Department M. D. Lyster, General Manager, Perry Plant Operations Department R. A. Newkirk, Manager, Licensing and Compliance Section S. S. Kensicki, Director, Perry Plant Technical Department DCD/DCB(RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Harold W. Kohn, Ohio EPA Terry J. Lodge, Esq.
James W. Harris, State of Ohio Robert M. Quillin, Ohio Department of Health State of Ohio, Public Utilities Concission INPO bec:
J. M. Taylor, Deputy Executive Director for Regional Operations T. E. Murley, Director, NRR Regional Administrators RI, RII, RIV, RV L. W. Zech, Chairman T. M. Roberts, Conmissioner K. M. Carr, Coninissioner K. Rogers, Conmissioner F. Miraglia, Division Director, NRR J. Lieberman, Office of Enforcement RIII, PRR
.RIII, SGA RIII RIII qd RIII RIU RIII Coo erin j K p h dk S
an P
r llo is