Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18043B102 + (15:47:06, 6 January 2025)
- ML18043B101 + (15:47:07, 6 January 2025)
- 05000255/LER-1979-040-01, /01T-0:on 790927,ultrasonic & Radiographic Examinations Revealed Linear Cracklike Indications on 18- Inch Main Feedwater Lines Inside Containment.Cause Unknown. Approx 28 Inches of Main Feedwater Pipe Being Replaced + (15:47:09, 6 January 2025)
- 05000255/LER-1979-040, Forwards LER 79-040/01T-0 + (15:47:10, 6 January 2025)
- ML18043B097 + (15:47:12, 6 January 2025)
- ML18043B095 + (15:47:14, 6 January 2025)
- ML18043B090 + (15:47:15, 6 January 2025)
- ML18043B089 + (15:47:16, 6 January 2025)
- ML18043B088 + (15:47:17, 6 January 2025)
- ML18043B081 + (15:47:18, 6 January 2025)
- ML18043B079 + (15:47:19, 6 January 2025)
- ML18043B077 + (15:47:20, 6 January 2025)
- ML18043B078 + (15:47:20, 6 January 2025)
- ML18043B076 + (15:47:22, 6 January 2025)
- 05000255/LER-1979-038-03, /03L-0:on 790829,pump Discharge Valve Failed to Open During Attempt to Operate Svc Water Pump P-7C.Caused by Corrosion of Valve Hinge Pins.Repairs and Futher Insp Planned + (15:47:25, 6 January 2025)
- 05000255/LER-1979-039-03, /03L-0:on 790829,pH of Steam Generator a Dropped to 8.08 Following Change in Condensate Demineralizers.Caused by Increase in Demin Resin Level to Correct High Condenser Tube Leakage.Corrective Action Under Evaluation + (15:47:28, 6 January 2025)
- 05000255/LER-1979-039, Forwards LER 79-039/03L-0 + (15:47:30, 6 January 2025)
- ML18043B066 + (15:47:31, 6 January 2025)
- ML18043B064 + (15:47:32, 6 January 2025)
- ML18043B063 + (15:47:33, 6 January 2025)
- ML18043B062 + (15:47:34, 6 January 2025)
- ML18043B059 + (15:47:36, 6 January 2025)
- ML18043B052 + (15:47:37, 6 January 2025)
- 05000255/LER-1979-033, Forwards Response to Item 2 of IE Bulletin 79-14, Seismic Analyses for As-Built Safety-Related Piping Sys. Deformed Support Attached to Snubber 33 (Ref LER 79-33) & Other Minor Conditions Found + (15:47:38, 6 January 2025)
- ML18043B049 + (15:47:40, 6 January 2025)
- ML18043B048 + (15:47:41, 6 January 2025)
- ML18043B041 + (15:47:43, 6 January 2025)
- ML18043B042 + (15:47:43, 6 January 2025)
- W3F1-2018-0009, Spent Fuel Storage Radioactive Effluent Release Report for 2017 + (15:47:44, 6 January 2025)
- ML18043B039 + (15:47:45, 6 January 2025)
- ML18043B037 + (15:47:46, 6 January 2025)
- ML18043B036 + (15:47:47, 6 January 2025)
- ML18043B035 + (15:47:48, 6 January 2025)
- ML18043B034 + (15:47:50, 6 January 2025)
- 05000255/LER-1979-036-03, /03L-0:on 790821,during Routine Testing of Diesel generators,1-1 D/G Failed to Start.Caused by Dirty Oil in Engine Governor Which Was Drained & Flushed to Restore Operability + (15:47:51, 6 January 2025)
- 05000255/LER-1979-036, Forwards LER 79-036/03L-0 + (15:47:53, 6 January 2025)
- ML18043B028 + (15:47:55, 6 January 2025)
- ML18043B027 + (15:47:55, 6 January 2025)
- ML18043B026 + (15:47:56, 6 January 2025)
- 05000255/LER-1979-035-01, /01T-0:on 790905,during Release of Contents of Waste Gas Decay Tank T-68B,waste Gas Monitor Alarmed & Terminated Release.Caused by Personnel Error.Review Step Added to Release Form + (15:47:58, 6 January 2025)
- ML18043B023 + (15:47:59, 6 January 2025)
- ML18043B022 + (15:48:01, 6 January 2025)
- ML18043B021 + (15:48:02, 6 January 2025)
- ML18043B018 + (15:48:03, 6 January 2025)
- ML18043B017 + (15:48:03, 6 January 2025)
- ML18043B016 + (15:48:04, 6 January 2025)
- ML18043B015 + (15:48:05, 6 January 2025)
- ML18043B013 + (15:48:05, 6 January 2025)
- ML18043B008 + (15:48:06, 6 January 2025)
- ML18043B004 + (15:48:07, 6 January 2025)
- ML18043B001 + (15:48:08, 6 January 2025)
- ML18043A999 + (15:48:09, 6 January 2025)