Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies. Provides Number,Manufacturer,Model,Capacity & Plant Application of Pumps.Test Results Encl
ML18043B063
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/17/1979
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Ziemann D
Office of Nuclear Reactor Regulation
References
NUDOCS 7910020625
Download: ML18043B063 (36)


Text

consumers Power company General Offices: 212 West Michigan Avenue, Jackson, Michigan 49201

  • Area Code 517 788-0550 September 17, 1979 Director, Nuclear Reactor Regulation Att:

Mr Dennis L Ziemann, Chief Operating Reactors Branch No 2 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET~ LICENSE DPR PALISADES PLANT IE BULLETIN 79-15 (DEEP DRAFT PUMP DEFICIENCIES)

Consumers Power Company's response to IE Bulletin 79-15 is as follows:

1.

Item

©lPW The number of deep draft pumps similar to those shown in Figures 1 and 2 utilized in safety-related applications in each facility.

Response

Six.

2.

Item Manufacturer, model, capacity and plant application.

Response

a.

Manufacturer:

Layne - Bowler, Inc Model:

67H-5605 Capacity:

8000 Gpm Plant Application:

P-7A, P-7B and P-7C Service Water Pumps

b.

Manufacturer:

Worthington Corp Model:

15M185 Capacity:

1500 Gpm J

Plant Application:

P-9f Motor-Driven Fire Pump

'191002~ ~.~

\\

SEP 1q1979

c.

Manufacturer:

Worthington Corp Model:

15M185 Capacity:

1500 Gpm Plant Application:

P-9B Diesel-Driven Fire Pump

d.

Manufacturer:

Worthington Corp Model:

15M185 Capacity:

1500 Gpm Plant Application:

P-41 Diesel-Driven Fire Pump

3.

Item Overall dimensions of pumps.

Response

a.

P-7A, P-7B and P-7C - 34'10" x 24" Diameter

b.

P-9A - 29'9" x 18~" Diameter P-9B - 29 1 9" x 18~'; Diameter P 29'9" x 18~" Diameter

4.

Item 2

i{

Summary of start-up, testing and routine maintenance history. *

Response

(

A summary of testing and start-up history is provided as Attachment A.

No evidence of test failure for either service water pumps or fire pumps could be found.

A summary of the maintenance history of the service water pumps is provided in Attachment B.

No record of maintenance on the fire pumps exists.

5.

Item Operational problems and major repair efforts.

Response

The service water pumps have had a history of packing and bearing problems since 1975.

The packing problems are probably due to the sandy, coarse environment to which the packing is exposed.

The bearing problems have almost always been motor thrust bearing problems perhaps due to the heavy load they must bear.

The only maintenance that could be considered major was completed on P-7A on 3/18/75 and P-7C on 3/9/77; this maintenance was performed in order to inves.tigate the bearing failures.

No significant problems were found on either occasion.

  • ~.,

(

3 The fire pumps have had no maintenance problems.

Although the maintenance summary indicates no work performed during the summary period, it is likely that occasional repacking was performed.

6.

Item The longest interval that each pump has been available for operation without corrective maintenance.

Identify the number of cycles of op.eration during this interval, the duration of each cycle and the operating mode(s) (recirculation, rated flow, etc).

Identify the longest continuous operation at or near rated flow conditions for each pump and the status of the pump operability at the end of the run.

Response

P-7A, 6/13/77 - 1/20/78 7 Months P-7B, 12/17/76 - 3/17/78 15 Months P-7C, 3/22/78 - 10/19/78 7 Months The pumps are normally operated in cycles of two weeks on - one week off, with two pumps in operation at or near rated flow (flow, of course, is dependent on lake temperature and heat load) except when the pumps were taken out of service for repairs as indiated in the Maintenance Summary.

The pumps were operable at the end of each run.

P-9B and P-41 are normally only periodically operated under test conditions.

P-9A, however, is run quite often £.or various uses and has never had an operational problem.

David P Hoffman (Signed)

David P Hoffman Assistant Nuclear Licensing Administrator CC JGKeppler, USNRC 0

l.*

.*.:1..,:':::.

.!S.

ll~rd Critical Se"ice Water Reader Pressurea vith two pumps*

Z'UmWig~ *.

_~~:~. ~ 4.
  • .:~. *;,

P-7A*"*dkcharge pressure P-7B discharge pressure PI 1318 PI 1319

... ~..

~*

a._ Pr-eregulsites

_*.. ~.

a hydrostatie teat

. ";.._.~.............,

2 *

~;~j;*

.:~* ~-~~-4:.,..
  • .;;r. ",¥. :

-~

-~. _.. 3* * ~*and control l)'*tems ban been calibrated and

    • MU~ ~a

'11tb CP Co Propert)' ProteCt1on Department an4 fnterested *insurance ~c1ea who dHire to vitnesll tests. (CP Co Property Protection Department vill uaat 1n *c:ontact1na 1nauranee iDspectOn.)

_f
5. Oiect entire-.,-st.ea to see tbat-all valni* and equipment
.~, * *
  • an pftQ ~

to;:;. denote CP Co operation or the 87Stftl* *

.. --.., \\t

6. Cb.ck that DO red tap are *placed on the ~

vhieh vlll

. *2:

  • _.:

"~._

btertwre vitb tbe teat.~-

  • .:<c':-*
  • './;*,-*-*F_.o_:_':
_;_:"'_-~.:'.*~~

~~--*. -..""or

',I c.*

  • Preeautioms *

, ;;: -~* ~:~<:~-.:f~ *

.;;.""., t.;. check-that tie~.,.. to ~ion of auxill&r7 f'eed-~te-P*. -~_.}- ~

......,., U"-Cloeed am tqged..

~...

... :~ ~-

  • ~*-

Cbect that tie Yal.YH to ~em.ce ftter S78te.i are cl.o~..

_.
-. ;~_ ;

~

-~.~

-.. ~

~*~*--.. --:!::;~-

_:~ :~-
3.

Caut1o~ penonnel 1n the Tic1n1t7 of *prinkler or delup *:--,,...,-i;-~/:i1t

.$i.~ _:_.

~C-* f

'~ 9J'*t.w bet'ore preHuridng 117atem.

',~ -:":".: ~_;:i_~-_j:,._:_*_:_,-_;_~_-_:_

.,..,_,._~F-

~~

?;'*~'-.

A*.IJ. 19tore testi?lg aprinkler or d*ll.13* a7atema, protect el~tncai*C..;'*-

't':. * ;, -.u1s:-at 1n the an&.

'1..*_

.*.tj,

"'!~:::

. *:~;.".<*~~ :;--~-:\\~.~~- :~.*,.*f{}.

  • -:..~.

~.. '.

~.

11euure* t!le engine speed am i;mip dillcharg9 pressure at llhutott, rated capacity (l.500 gpn) &lid 15~ rated capacit)' (2250 gpm).

-~-

Shutott

  • tee! Cape.city im eapac1t)'

l.Bl.o 3

    • e

'.?.*'-_-

__ J~

.. *' *****:t*""'

.. ~;.tsu...*1CN Fi\\cN:

CAf'ACITY _________

GALS.

-)~*~......,. Lt'T (w.i1n1t LltYEL l'O DISCHARGE HUD FOR 'llRT ICAL l'UAl I NE) ____.. FT.

.*.,~,:

~,..,...;

~:.'.i-~:~~~--~~~~~-.~~!£~- -~ *,-L~-E~c~ ~,*;~-~~R FOR VERTICAL TUAlllHI P'T. LllS.

-. ~

OP£AAT£S:

~MUA\\.~TOMATIC

.. ti::PJT***'tl!-.**

PSrtltr O&'I"_**-**-----'"-**~.

,,,

  • Un., c:-=;:;,. *"l.. ~~-; ';":."' flt. et~ c*h~ J ~-.,JO

.-.. L~ A\\Jl(ILl.iirf P\\W: MAKE TYl"E. _______ tA,ActTY __________

tvT I II f'S I

  • Cur-OUT PS l.

~-SPECIAL tCH£NTs....:il-..~._* o-.*~z~&-<e~. ~'fl~Cex...i..:. 4a.l\\' __

1,..;/ '1l;;;....:::o...11'<f.:.lll.,L..l@~~/3,"""".J.Jt _________ _

lOCATION

-~

--t:-

I --

(. -,

,~

~**---

, 7,;

PtTOT G.P.M.

-~1::?*~* °2100

~.*~::-**;;*,..,

  • I

-I

....J """

!'**'!""-~-i

'Z JS':.

.. _.,,.. )

"'/

VERTICAL TUR~INE

~tscMARCIE GAaic 11-------T-O~WITElt LEYEL oa*

01SCMU!lt SUCTION

. ~

-"-'1 '~,>

'. } ' -*

1.. 7 to 0

+I. -

I

~.. -

~,.,

..J_,-

-'* ~

,......... ~*

ST CAM AT IH\\.ET

j.

e*

9(> '.s'. "17

.:..~*;:;:.._.... 7*

HS-3~

/S~

161:::~:.

111 **

/f~

/1.3 117 eo

/¥~

14:15

/5'7

/57 /7/

/'71) "

/B9 h.

i¥'1 i"c l.fG

~dS IF'?.;i.07

/'/b 2/D

!12.;).1.3

/S.3

/3:J-:r.-

,~

/:J..7

~~

G"T SI

  • ~I) Jir

~~

t;>O ~(

~"

~"

rv

/ha 7u,( Dffv<!N rr/!G' A, '"'I'

.. (

1.

l/Jel.J AL"vO~ PYJ\\'vc....,.,

. tJj.
.tJ~ 0

/,J1 ~ n. e1:"'? l(,,G.

1..... ~i.1.~~

t I*

3.:,.,, ~

.3N.i,.

i~u.i *

. I/,, Di,J,. Ml:

/~4/I

"~

ltn1%*

A"'1i' Jo.,,c) r..

Pl()

l7.s' l'ld I 1:1...

17~-

(ys-*

'T'.9.*.:

.. ***.:. *~

~~*.. ** :<t~* -.

';~*- :.

-*.: ;'f ~.

'-~.

  • ""'.*~
._;;(....
r.***' *..

~..

-~; 1i/*

/7_?1** ::*

~I~*

~~-

.. *i.:"..:.-.. ~

-~. *.,..;... :.

.. ~-t~:~

~~i:l

e*

-~*..

DATC ( **, *~

ANNUAL r IRE: f'UMP TEST SHEET J yM:? ft

~

FILE NO *. __ _,.,. __

RtSK

~~~a,.1.1at',

,, =u, es e~vr:

- *:"Slc.uct-~'- _..

MoD!L oR TTP£ Sriuu No.

".;i:'i;. ' R:-.-,.-~--CA-P_A_C:_l_T_"r _________ Q_.P-.-.. -.-AT RATED HUO*::::::::::-,.-T-.-.. -.,--RATED SJ>ctD_R.P~e

~-

A~*\\-~ HoelZOMTAL.11 'llltTl'-\\L, TUA*1NE, STAllU INPELUR O****----*NCHES

~_, *.

~:*~~':,.-~No.

. z: *.. ;.~.:.:fi:i:_c';i CUT OU'f ____ _;

-~ *'£;...::. ~~-..: ___

. ~-**

--.::t.

..:~~-.. *,..

-..,,_"Q11VDi BY':. E\\.ICTltlC MOro~... STtAM.., TURelHI, GASOLINE, ou:a!L.., INQIME, VATrlt 'r'UL, HO

    • '*~-:.~~~; ~ ~~:

CAPAC I T1' GALS.

-~~

_.;/,,~ -~:. tir?: (vAn* LEYCL TO OISCHAAOC HrAO,Ollt ¥!,_lt_T_l_C_A_L_T_U_A_B_l_N_E_)__

rT.

~"!

  • -.~.-;;HEAZt (w.UR UVIL TO LOWCaT INPrLLElt P'OA VUTICAL.TUltltHl*.,,----,T. &.BS..
    .

~-~

.. :~:*_;_:*:~--~*..JJ'

. *;*=*-:-*--,~~ *:::** *- *~

.;;.'"'- ~'QPDOTES: -- ~IOUAL~TCMATIC...f-.,

~CuY 1"1 f'SI

~';:::. Uo* ~i::,. *-.:... ~~; o..r:,, J74".... 'cwt~ J ~o~ 1io'""---*
"'~ AUtJL&.\\irt PUP: Mut TTP'E CA.. *cnv_*.;... __..;_ __

~*. * **

Cv'f:" IN P'S I

  • CUT OUT P'S I *

-........,....... - ~

1~.:~:.*~~ **COKNTs I~-* i'a <e '0'9, L ff

/ti o ~

.. @ IV.t+

~.:

  • . -:~

toeATIOll P1TOT G.P.M,

  • t.

-..*:*,:-01*,,,;, -

I_,., '

-~

.*.,,1 --

~*** - r -~

-~*;

"Z J("?.

--... -~,__..~..

z-.:. '/

-.**.~-

~

VEaTICAL TURBINE DISClfHQC GAU T_O~WJTIR LEYr1.

Oft*

OtS<:M&llllt SUCTION N,.

.a..',':..>

I *.'U-:.

...:..r~ **

  • ~~...

1 - -

,. 7

.. J'-....

10 0

+I..._

lol.'1.

R p '.lo!

- ;;:., r.

  • ~ ~-c

'~!*,~

11r..o

-.l.. -

~, *

  • -:'.:*1:'

-:~°"'.. *.

~"~

,~,,

~:;.. -*

~

ANNUAL FIRE PUMP TEST SHEET R_ISK J...A U $A,'1?.!, ~

Gt. ecn I<: J>~ rvc. ?ohwf?

lOCATIOM Pt TOT O.P)4.

-=-***'

  • ----~~---l*---*---*--

,,J.

... ~..

CUT OUT _____.....

....:. /'*

I

~-.:

I I

I I

I I

I

co::!;. *::::\\5 Ff\\"n-r:!'! co:-PANY PAL!;::...\\DF.S CC\\'Ll~lG ro:r:::i l*"ODIFICATICl!IS Preoperittional ~est No 14-R21 (b)

Fire Protection (Extension) SyatClll (Diesel Drlv~n Fire Pump)

  • The *purpose of this lest is to demonstrate proper operation ot the Diesel Fire Pump (Extension) Controb and verify flov capacities or the pulllp.
l. Construction h~s been completed.

Release fol"!llS included iri the turnover package have been reviewed, round satis:factory, and are OD file~

Verif'ied by:---~-----;'------ Date: 5-1-21:..

2.

Each individual component and/or subsystem has been checked.

a. All equip!llent per the attached data sheet; "Equipment Status," Pace~' baa been installed and checked out
  • Verified by:. /lllr-4<

Date:

s 7;/

Tbe following support and/or related systems are operational:

-~it~*

~~~~f'

  • ii:r**

.8]~.

~~11~

.*f;~.

F...... ~:2~

i~~~=~'.~~~~,;:;~l~t

~~~~""!'f~,.;

~£~~~:4

}~-
-

~ ;

-ven:.. ::::~~'.. sY-?e E '

ff<~~~'

~'::;* '-~,.* *. i

--.~

.. ~ A physical inspection o~ th1t Syate:ii(s) ancl ita componentac:> * -

,-7;~--

_.~

  • -*<<'j;J;*~~-F~.-'.*Y

.t~~r* : *,~,..~*

~. -:~

Cl:. -~

-~~-'~_.; :~

~~i1-~i~~~::-~~::~;;:

~~;..

(piping, val.vea, 1ttc) hu confimed the (a) ccmple~neaa, (!>~ proper..****.c.rt:.-;:_:

  • ,.*,.~;;;
{
:;:~-:<~*,;:i..f;:.'.~~-:

~~

  • l'i,{,1,~u..* 'Oad,~) ~with la~;~-rerlai....:. ~~~~~t ~EM~~f iiJ't:§~;::7~~;ft:{f;_

~

....;.~:.~.:..:'.*;,.~.;~change notice(a). ot' ~e-*_a"1i~le pi~ing *~.instrument di&.gra.ms~*-&r.d:-.::'". ~-~~-~~- :"t:~:~~~;;w::f;~;-~'j'?2*::~J~" Page...!.!__, has ~n completed and checked to be in accordance rltb the wiring schematics listed

D, FROCED\\!. c:.: ( co:;n,)

[.r.1-k'\\"cl Sw1tc-h LS-5353 Low Low-Level A lcr:n 53~3---.;--

~t roint 5'?t Point ___ _

Vcri:"l!!i b)r:--:-... / ____

7...._*,;._ ** _.t _____

/.

Date: __,.*_/~-*~,/'--~-'---

5.

Continue to tran.111fer oil unt.11 tei"lllinated. b,y the high-level Witch, Note levd. Po11ition Switch HS-5353B to "l-!anual" and tritm.fer oil until t.'1e hii.,h"7levd Rl.£rm is acti:ntt'd (W'indOtl' 33 on _Control

...... --**--*---*-*~.-*..

Posit.ion l-iS-5353A and lf3-5353B to "Auto,"

ff~Gh*Lcv~l Switch LS-5353 High. High-Leve:.. Alarm 5353--t,-. -.. -

I)

VcrUied by:

v/f'"...,I;......

. 't__.

Set l'oint*--"'----

Set Point" Dste:

f/ *.1/">,-

s~,Jo{

T 7

6.

Verify Fire Puu:p (P..41) discharge

___ /_,_ __________ _

is lined l.'P to fir~

Two fighting system.

Verified by: __ _,_~-----~"""-""F--"---- Date:

4-26~"21_

See.. tJa-re-r~o trip 'breaker to F.lectric-Driven Fire Pu:np P..9A.

7, Turn control or iiiesel-Dr.iven Fi~ Puinp ?-5iE Lo OFF and Verified by:

~

~

D&te:

S"-/3-2¢

8. Teat the autom:tiC:l:t:;eature ot the diesel-driven f'ire pump at least ten ti:lle11 by diacharg:ing water-through the hose test connections.

Pump should start trom PS-5350 'llhen cyatem prea.sure drops

,. to !:() prlg.

Pump will continue to run arter being started until it ia ll&llu&l.l,)'" atoPT>ed.

Allow die.el to operate at leaat five minutes arter During these te11ta, ~t:oz: batta17 cba:rBer.:

.~::~*~

.. ~

  • hoJ;, ch,* lubrlcatioo;: IUld engine
  • ~~ ~* o~t~,.~~r~.

':°

!-t-~-

~ ~~

~.:.}.. '\\:... ::: l.:.V.i

--I""

-~

.. ahatott, sev: ------------

Dn toe:_-....-.;."'--

  • .:~~ ---:-.

D.

~f:~)\\f3::.S (CL:;r.>}

Test#

Sl.nrting Pr.:ssur~ ( t>~; :12 Iinte Verified ~':

l

~

S-13-"?f M4 2

5-1~--lf

~

3 2:_-n-

'=ia

~-I!-~

-~

5

{;iC

~-13-~

/)1j) 6

~

5:._-t.J-7~

~

7

~~

s..-o -z~

8

~ 1-s-7~ ~*

9 kC2.

5-1:!. -5~-

10 6.Q f;-13-7f!..

Record:

Diesel. Lube Oil. Pressure Diesel Cooling Water Operating Temperature l...;;;.B_,,O:;;...__or-Te11t the manual star',-ing feature at lea.st ten ti.Illes.

Test #

1.

2 3..

5 6.

7 8

*-y:
  • ---:~~-* *:.. -.

-~';,../~,_

~

Dies<!l Start

nate Verified by:

-~*..._*-*. ;.:f~;.- ~>!~~ ~,;~*-=~--

.~ii~ ~;~~f- -;~~~:~l~;

~ -

___.3::.ES"_..,

__ t_: _________

Pn;...;.;:...<"...;';.;* r.:..*

  • f::w-cJ Disr~nr~c Pr-essur.!:,__

t.hutorr P.ntcd C:i;m:.-i!:y -1..lSC 150~ car>8cil.y _ll~

/c.eq Ps:li I "Z.o Ps,~

7.r..::Z Ps.!.j W! t~ t;h-~ ho4'c outlc:::.:i;-en ar. ~unt COZ'?"!:sp:miing to 15<>;!.

capscity, start thP. dic:el manunliy ~nd rcco:-d ti~e to ec=il to.speed-

~-

~corms Verified ey:

ru.MP £~tc:

<:-2-?tf

9.

L"J:On CO."llpletio:i or t.f-,,e l;tsts, lockout the diesel driven fire JlUl'IP i.nd allov the presa!.lre to decay in the tes-:

preasure aJ.~m is indicated i:in Co1*trol Panel C-126.

syste111 until a lov AURA'J b~c.ei~

SEt-IM'** co.53 P.Fr<I-Verified by:

10. Record water level in fo~bay for comparison in future I

II c-._/

_ /1 pump per.formance teats. Record.L.':1ke Elev. 7 8

~t:/JV J:""~L~

Verified by:

11f./JeJ.e~ Date:

S: 9 -2 4'

  • f-. ll.. OYerspeed tbe diesel and. wrify OVEBSPJmD indication on

..:.. ~

J.4.

Cl:cck crnuki np: opcr-J.tl on or P.ies~l durin~ 90 second cycle, 1'!' t.t~rl'?s !:hould ait.er::At.c each tir.:e t.he engine 1a cranked

  • Repeat test so each set cf bl.ttc'l"ies are used.

Verlt!cd by:

/lc.AJ.~'lA-Inte: s=-7-7g

15. Veriry Diesel start by moving local control handle to test position.

-* *_verified by:. __._.. --:~:.:...*.;..__;;..;¥+~~;;.;;;;;..-__ Date-:

~-7-)f

< 16.

Check cr11nking operation ot D.i.escl with the uae ot only oc.e set or batteries. Complete l~ss o't voltage from one set will cat:Se set of batteries. (battery charger ofr). Sir::ulate loss ~voltage, verify trana'ter am then repeat test" WJing other set o't batterie:i.

Verified by:

. ~

D31e:

S"'-/-?f

  • /,

1'--

17.

Check Engine Troubl~ Alarm for battery charger.

Verified by: __ _.},~~=~~*=--- Date:._.;;..r._-_;7_-_7_tJ-=---

18.

Veri'ty Diese~ Jacket~ter-Heater and. Lube Heater are energized from Panel L-34., J:!reakcr 1/:4.

Verified. by:

~

Date : __

.!;"_-_7_-_7_'j-_.__

NOO:Z:

Length o't 1'est - The pur.ip ahall be in operation not; leas than 9ne hour (total time) durlll& the toregoing teats.

.:::aii'*

i:o T-40

-JC-10 14-Ra (b)

--rir"C>=::otectjon (f:'t:ten::ion) r.1::t<::n - Cooling Tol'er Diesel Fir~ Pu?'E

'~ l* *:*a in::,

}"l\\::;h: 11:.:

& :1;;.?roin~

Co:-;rl.:~c

\\:; :;<? II ired A/.,4 Int.er taco P.ipln:;

C<l:iiplcte Power t.

Contl*ol Wirlntt Coo:iplcti:

ncndicd For Service Per Inst~tlon

~nua.l
  1. .A.

4-24-7/-*

Initlal Of"~r<&t1on Date Lubr. Bu.'ll'fl t.

Allzn Cheek Coi:iplete

~-~-~

/fl.A.

P-41

¢-u tj-/B-??

--~~-;-~~~~~~~~-i-~~~~~-+-~~~~~:i-~~~~~~~~~~~--;

4-z6-7rl-

  • .C *-

~.....

.:~

0

~;-

~-: :f--~~~- -_, *--,w*.,-., __.,_ ---~-~J:><>- ~"l!"<-ii*-~'-t9:A~-

_,_ *.._.,. ;r. --

___, -~~

l-7-Tt

~~

ft

~~

~-:.

-~.::.ir;;.;o*-

  • ~.~

i

. consumers Power REVIEWED BY PRC/ QC -

DATE 7/11/79 PALISADES NUCLEAR PLANT MONTHLY TECH. SPEC. SURVEILLANCE PROCEDURE

, INSERVICE TEST PROCEDURE SERVICE WATER PUMPS APPROVED BY P 1.0 PURPOSE AND REFERENCES 1.1 PURPOSE PROC HO M0-16 PAGE 1

OF 5

REVISIUN 6

DATE

?f24/79 DATE

  • 1.1.l To survey the*performance of the Service Water.Pumps P-7A,.R and C.

1.2 REFERENCES

1.2.1 Engineering Manual Procedure EM-09-04.

1. 2.2 Tech. Spec. 4.17.

2.0 INITIAL CONDITIONS 2.1 Two pumps shall be operating with a normal system iineup per checJ.<J.ist B.15.

Test should be run when Radwaste Evaporators are *not operating, if practical Note exceptions to this lineup in Section 5.1.

2.2 When the data is taken*, the plant should be in a steady.state condition.

2.3 Obtain Shift Supervisor's* permission prior to running test.

Shift Su~ervisor:

Date:


~--~------~

3.0 ACCEPTANCE CRITERIA 3.1 Acceptance Criteria are contained within the body of this procedure and in Engineering Manual Procedure*EM-09~04.

4. 0 PRECAUTIONS AND LIMITATIONS 4.1 Unless otherwise specified, all. data in a given set should be taken withirt the shortest practical time period.

4.2 Allow each pump to run for at least five minutes prior to recording data.

~.3 Since *all pump bearings are submerged in water and completely unaccessible, no temperature measurements are required to be made.

Similarly,. there is no way that pump lubrication can be checked.

4.4 If the TK-80 vibration instrumen*t is *unavailable for *use**.(i.e., away for calibration or repair), the IRD vibration instrument shall be used.

Note its use in data table or comments section.

i~

~1 l

TITLE:

consumers Power 5.0 PROCEDURE PALISADES NUCLEAR PLANT MONTHLY TECH. SPEC. SURVEILLANCE PROCEDURE INSERVICE TEST PROCEDURE SERVICE WATER PUMPS 5.1 Verify that the initial conditions are met.

Verified PROC NO PAGE 2

REVISION DATE M0-16 OF s 6

. il/24 1/79

.. -* _.-.. -. ".? J Exceptiori._s_:________

~~~~s~~r. ;

7 ;.*:.. r--.~: -


~-~~--'-=--~...;._~-~-.......,..-~~-=-~--~---'---'-~

\\.!...".*I>/-':;:

i..:..: :..;. -

NOTE:

Paragraphs 5.2, 5.3 and S.~ may be performed in any order.

Notify the Control Room to shift running pumps when desired.

5.2 For Pump P-7A, establish stable conditions as required by Section 4.0 and record the following data:

INSTRUMENT REQ.ACT.

MEASURED OR OBSERVED VALUES PARAMETER INSTRUMENT LOCATION

>HI/<LO TIME N/A N/A N/A See Disch.Press.

PI-1322 Local Graph psig Portable/On 7.2/0 Pump Vibra.

TK-80 Yellow Dot mils Bus lD Volt.

Control Rm.

N/A volts Motor Current AI-1308 Control Rm.

N/A amps Header Press.

PI-1318.

Control Rm.

N/A psig Header Temp.

TI-1319 Local N/A o* F Remarks:

Data Recorded By:

Date

-~~~-----~-~~

---~~~~--

5.3 For Pump P-7B, establish stable conditions as required by Section 4.0 and record the following data:

J '

r*

TITLE:

  • 9 PALISADES NUCLEAR PLANT MONTHLY TECH. SPEC. SURVEILl.ANCE PROCEDURE consumers Power INSERVICE TEST PROCEDURE SERVIC}::-~A'I'.Jµlr;t.'UMPS.-*...

PROC NO PAGE 3

REVISION DATE 7 /2 INSTRUMENT PARAMETER INSTRUMENT LOCATION Time N/A N/A Discharge Pressure PI-1321 Local Pump Portable/On Vibration TK-80 Yellow Dot Bus IC Control Volta e Room Motor Control Current AI-1309 Room Heade.r

  • Control Pressure PI-1319 Room Header Tern erature TI-1319 Local Remarks:

Data Recorded By:

i* **.

REQ.ACT.

>HI/(LO N/A See Graph 5.4/0 N/A N{A N/A N/A MEASURED OR OBSERVED VALUES 5.4 For Pump P-7C, establish stable conditions as required by Section 4.0 and record the following data:

PARAMETER Time Discharge Pressure Pump Vibration BUS ID Volta e Motor Current Header Pressure Header Tern erature INSTRUMENT INSTRUMENT LOCATION N/A N/A PI-1320 Local Portable/Ott TK-80 Yellow Dot AI-1310 PI-1319.

TI-1319 Remarks:

Control Room Control

  • Room Control Room Local REQ.ACT.

>HI/<LO N/A See Gra h 6.0/0 N/A N/A N/A N/A MEASURED OR OBSERVED VALUES

~'

~*

i----=-psi:

Data Recorded By: ------------------

c I

~-

PALISADES NUCLEAR PLANT PROC NO M0-16 MONTHLY TECH. SPEC. SURVEILLANCE PROCEDURE PAGE 4

OF 5

INSERVICE TEST PROCEDURE REVIS.ION 6

TITLE~

DATE 7/24/79 consumers Power SERVICE WATER PUMPS 5.5 From instrument RIA-0833, record the Service Water Radi.ation Monitor reading.

5.6 Reviewed for completeness and data compared with Required Action Range Limits.

. --**.:::.:..* :..-*:._-:-:::-=-=---=*

Shift Supervisor NOTE:

1.

~~~~~~~~~--

If a parameter is >HI or <LO Required Action Limits, initiate a DR/ER as ap_p_~opriate and notify the Technical Superintendent

-**c;r--*:e"roject Enginee*r~* * *Pump iS considered inoperable.

  • 2.

Limits shown. on the attached graph are based on ~ormal SWS heat loads with the _plant on line.* If this test is run while the plant is shut down, pump discharge pressures may exceed the high pressure limits.

In this case, a DR is not required.

5.7 Transferred to graphs and evaluated by:

Evaluator remarks (include any further action required and reference applicable MO's, DR, etc.):

Tech. Superintendent

Ll' ~ I YEAR BY WEEKS 46 3010 U"()ll;; X I llO OIVISION9

    • or** u. '*'*

.,._.,.~...

K!!:UF'P'EL llo 1!:9SER CO, Service Water Disch. Pressure (Two Pumps Opera ting), psig OJ OJ 0

~

0

~

l.O 0

9' I

I' 0

H'I

e.

f

~-

i*

(

i ' '*

consumers Power a

M't"'l.?7' PALISADES NUCLEAR PLANT REFUELING TECH. SPEC. SURVEILLANCE PROCEDURE TITLE*

FIRE SUPPRESSION WATER SYSTEM

'FUNCTIONAL TEST AND PUMP CAPACITY TEST ch "*(('I I('

  • PROC NO R0-52 PAGE 1

OF 7

REVISION 3

DATE ll-J.-78 APPROVED BY PLANT SUPERINTENDENT

. 11-1-78 REVIEWED BY PRC/Q~ - DATE

. JJ :)".

~<4 I

,_/._

-,... ~. I DATE 1.0 PURPOSE 2~0 3.0 1.1 To perform a system functional test including simulated automatic actuation of the system throughout its operating sequence.

  • REFERENCES.. ; - ---

2.1 2.2 Tech. Spec. 4.17.2.l(e) and 3.22.2.

SOP 21, Fire Protection srstem.

PREREQUISITES 3.1 Electric and Diesel Fire Pumps are available

.SS 3.2 for service.

Test equipment required for pump capacity test. All instrumentation calibrated within the last year.

(OP) ~-----

a.

Pitot tube, knife blade type with. test gauge 0-100 psi ~ange *.

S/N Cal. Date Cal: Due Date

b.

Pump Discharge Pressure Gauges.

PI-1311 S/N Cal. Date Cal. Due Date PI-1310 S/N Cal. Date*

-Cal. Due Date PI-5350 S/N Ca. Date Cal. Due Date

c.

Pump Suction Pressure Gauge.

r:.

S/N -----------Cal. Date ------------Cal. Due Date-------------

NOTE:

The rotational speed of the pump is not required to meet the Acceptance Criteria of the Tech. Specs.

Therefore, calibration requirements are not required.

3.3 If possible test should be coordinated with the Fire Engineering Section of the Property Protection Department.

Property Protection will notify the agent for NML.

I PALISADES NUCLEAR PLANT REFUELING TECH. SPEC. SURVEILLANCE PROCEDURES PROC NO R0-52 PAGE 2

OF 7

REVISION

~

consumers Power TITLEi FIRE SUPPRESSION WATER SYSTEM FUNCTIONA TEST AND PUMP CAPACITY TEST DATE 11-1-78 4.0 5.0 PRECAUTIONS AND LilfITATIONS 4.1 Testing should be conducted during the warm weather months.

4.2 Valves operated to shutoff the water flow should be closed slowly to prevent water hammer.

PROCEDURE.

5.1 Connect four 2~

11 hoses from the test header to the playpipes mounted at drain.

Measure and record the Qutlet diameter of the playpipes, normally 1-3/4, on Attachment*£: *..

5.2 Check all four test header valves closed. All references to test header

    • valves are those located outside th.e Intake Structure.

5.3 Measure and record the approximate distance from the centerline one pump to the surface of the intake bay (suction head).

Assume all pumps are 5.4 about the same.

Place the fire pump selector switches (diesels) and breaker (electric) in the off position.

This will.prevent inadvertant operation of the.fire pumps when the isolation valves are opened.

5.5 Open the mainfold isolation valve corresponding to the pump being tested; 104FP (P-9B), 105FP (P-9A), or 701FP (P-41).

The recommended sequence is P-9A, P-9B and P-41.

5.6 5.7 5.8 5.9 Stop the Jockey Pump at local motor controllers.

Place the selector switch in auto (diesel) or close the breaker (electric) of the fire pump to be tested.

Slowly bleed off fire system pressure with drain valve'.

Record the auto s_tart pressure on Attachment 1.

The sequence of steps 5.10 to 5.16 can be altered at the discression of the Supervisor.

5.10 Open fully four test header valves and establish a flow.

5.11 If the pump being tested is diesel driven remove the protective cover from the coupling and check the speed.

If necessary, set the speed as close as possible to 1750 RPM at 100% flow (1500 GPM).

Record the adjusted speed for Attachment 1.

f:-"

5.12 With pitot blade inserted to the center of the stream and out a distance approximately~ the nozzle tip diameter (3/4" - l") from the nozzle end measure the flowing stream pressure and record on Attachment 1.

Repeat flow measurement for each stream.

Also record.the pum~sp;:;._d,.dies~E\\~)~ 'F'~ ~. n and pump discharge pressure on Attac.h.m~~~~U ~ il **jTif{u\\).~

l:i

.. *... f,f ~:;.; *'

~ r-\\ q ~ ~~ r: 1.1 d1n.:> :*** *.1* 1t.1r1 ~ ~

t:1 L1,... -

11

... ' *:, ~ f; 1.1 * *.*.i ~ '** * :- ~: * \\ t,

\\:l I

~ M *.:

fl t:i I.. ** I d

    • 1

"\\ ~H.i~c.. l*J*.;*.1

';~ "* (l'-\\::;;Ji.J\\:

~--

. I.c I

\\... L

6'"

N PALISADES NUCLEAR PL.ANT PROC NO R0-52 REF1JELING TECH. SPEC. SURVEILLANCE PROCEDURE PAGE 3

OF 7

FIRE SUPPRESSION WATER SYSTEM REVISION 3

I consumers Power TITLEi FUNCTIONAL TEST AND PUMP CAPACITY TEST DATE ll-;-1-78 5.13 Slowly close one of the test header valves and repeat flow and pump measurements.

Record on Attachment 1.

5.14 Slowly close a second test header valve and repeat flow and pump measurements.

Record on Attachment 1.

5.15 Slowly close a third test header valve and repeat flow and pump

, -
:;~. c-;7*-_-:*- measurements.

Record on Attachment l._

~- ____ _

5.16 Slowly close the -fourth test header valve and record t~e pump discharge pressure and speed (diesel_)~

~***

5*17 Stop the pump by. turning_ the:_.sel.ecto'I;-.S~~o.££_.. (.diestl}.:.o.~.pushing-,--

the stop button (ele_ctr-ic).

NOTE:

Diesel engines should be run a minimunrof 30 min~tes.

5.18 Close the test header isolation valve.

5.19 Repeat Steps 5.5 to 5.18 (excluding 5.6) for the remaining fire pumps.

5.20 Return fire system to normal per.Operating Procedure SOP-21, Step 6.1.

5.21 Remove hoses and replace valve caps -as required.

5.22 Return test equipment as required.

6.0 ACCEPTANCE CRITERIA 7.0 6.1 Each pump develops at least 1500 gpm at 125 psig.

6.2 Auto starting pressures of pumps verify ~eque!lti~l starting to maintain system pressure ~ 90 psig.

NOTE:

For failure to meet the Acceptance Criteria refer to Tech. Spec.

Section 3.22.2, Action

  • RECORDS AND ATTACHMENTS 7.1, Pump and Water Flow Data Sheet.

7.2, Theoretical Discharge Through Circular Orifices.

7.3, Fire Pump Flow vs Dis.charge Pressure.

. ' f c

ATTACHMENT I R0-52 Page 4 Rev. 3 PUMP AND WATER FLOW DATA SHEET PUMP DATA J

PUMP AUTO START SUCTION DISCHARGE PRESSURE PRESSURE PRESSURE T~TAL PUMP TEST HEADER HEAD SPEED VALVES OPEN ELECTRIC P9-A DIESEL

'B PI.-1311 ~

PI..;1311 Pdi...Ps RPM

\\

. I

\\

J

\\

I

\\

I

\\ I

\\

I _.::><::_ >< \\ I

/\\

I\\

/\\X><I\\

I

\\

I PI-1310 PI... 1310

  • Jt'

\\

I\\

J

\\

!~><><

\\ I V XlXt><

/\\

/\\XXX l

  • if To Be Completed *By Engineering*':'
    • F11
  • O. 97 (Coefficient for playpipes)

None 1

2 3

4 None 1

2 3

4 WATER FLOW DATA PITOT PRESSURE FLOW

  • TOTAL**

FLOW

  • REMARKS -

-*-~

From Att 2 A+B+C+D 0

0 0

A A

A A

A A&B B

B A

A B

B A+B+c c

c A

A B

B c

c.

A+B+c+D D

D

.. 0 0

0 A

A A --

A A*

A+B B

B A

A-B*

B A+B+c c

c*

A A

B B

A+B+C+D c

c D

D Nozzle Outlet t

.... ~~*---

ATTACHMENT I (CONTD,)'

. PUMP AND WATER FLOW DATA SHEET..

PUMP,:

. i WATER FLOW DATA TOTAL PUMP TEST HEADER

..:PITOT UTO START PRESSURE HEAD

  • SPEED VALVES OPEN.

PRESSURE FLOW

  • DIESEL P-41 PI-5350 Pr.:.*5350

-I Pd-Ps RPH

  • To Be Completed By Engineering
    • Flow X 0.97 (Coefficient forMplaypipes~

None*

1

2.

3 4

Returned *to Normal (Initials)

(OP) _________ _

e Completed By/Date (OP)

I I,

  • .1:.

Reviewed By/ Date

.*(SS)

I

.j,:

Engineering Evaluation:

1.

Completed By/Date

. (En~r)

I I'

  • 1:1

.'.r' I"

    • ~*

....... f-'

1

\\..

From Att 0

0 A

A A

A B

B A

A B

B c

c A

A B

B c

c D

D 2

TOTAL**

FLOW

  • A+B+C+D 0

A A&B A+B+c A+B+C+D R0-.32 Page 5 Rev. 3

  • REMARKS

(".. '\\

I *.

Velocity Head Psi 20 22 24 26 28

{

30 32 34

e.

36 38 40 42 44 46 48 50

(~ "i' 1 Table

Table, ATTACHMENT II Theoretical Discharge Through Circular Orifices c = 1.00 (United States Gallons of Water per Minute)

Flow for Orifices Velocity Head Flow for Orifices size of 1 3/4 11.'.

Psi size of 1'3/4" 409.

52 659 428' 54 671 448" 56 684 466 58 696 483' 60 708 500*

62 719 517 611 731.

533 66..

742 548 68

'753 563 70 764

578, I

72 775 592 71~

786 j

606

"(6 796 620 78 807 633 Bo 817 646 82 827 extracted from 14th ~Ecition of F~.,~~ Prote~tion Handboolt (NFPA, ll-6B, section ch p er 6 pgs 11-68 & 11 69 11 I

~

tr-'-_..., *.,.....

e:

-r.*

--""!"t!'

{

. ' ::\\

,...... ~~J

~,;;:.:,.:... :~... :

FJ r;:~

'7Ja.~J}'

Velocity Hea-Cfi~0fr.:..~low for Orifice e:..*,~:1:.

Psi

.~...-size of 1 3/4"

~;<;i.::t":!~3 84

&~.,.,.,:c:*:-J 837

. ~-..-:~

86

~~~~~

847 ea

~-.. :'."'.. ~

857 C.'/*-'1!

,,,:~

90 c*;

~~: -~

867 b"

!.::'1 ;i:i 92 a::r.-~ ~

876

&i.:-

.... !Jl

~

t::I 94 886 96 895 98 904 I

100 914 I

I I

i 1

  • ~'!."~.-**

I.(\\)>

180 170 10 x 10 TO iHE INCH. 7 x 10 °INCHES KEUFFEL II& ESSER CO. MAD£ IN U.U.

ATTACHMENT 3

FIRE PlliP TESTS PRESSURE VS FLOW 46 0782 R0-52, Page 7 Rev.

3

  • - -*-.= -

.-1--1.- -

-L-

_L--

_1.-1.-

-L-

--r- --

- 1-

_____ I.,_

- ~l-1- - ~I--1-1-==:::=~=~ j~:

~ ::
  • I-1.- l-L- 1--

- -1- -

-* - -L-L- L-L- -- --

-L-L-1 -J-

--L-1----L-,_.1 __ 1--L__--

1-f--,-1-.-- ---1-t-1-i.-1-J--*------L-L-l-------i-----1--*

L.-,_, __ 1_

1--1--

1--L-*-1-----


1-t--L----------*-------1-----1-L--.l-L---l--l---L-l--..--J--1-1--

L----(

'P1 Pt-----

1-1 -t-1- L-l-

'---l-L-L---1....--f--L-*--

1--l.-1----L----1----1--1---1---1--

1-'-------

--r- "---L-L-l-

_,_._I-1--1--1--1--1-+-*f- '- l- *-L-I- -l-

-L- -l-i--..:..1-- - - - -

_L-_ L._ L__ _1_ -

... _1.-

-* *- --L-L-1--

- --t- -~

1-L-1-.L--~1 ti~ p..:.:.9a -* -I-* -

'"-'--I- -

L-1--.._ t l--.I..-

1--

1-

- -1-._ -

f-1- -1-t-- - -

-L-- -

- - - - - -"- l- -l- -

_I.- -~

_l._.:;__ -

-~-I- - r- ;._

    • - --* - - --1-- -~1-L-.L -L -'"-- -
    • - _._ _.__'-*- ______._ ___ t-r--L--L-L---1--1---1.-1--l-l-Hl-l-

-*~I--*


l--i- -----

1-1-1-1-l-1-1---i--l--l--l-+-+-l-l-l-l-l-1-I-'- _: - t- -t-1-- ~ 1-1-11-JH-4-f-l--~-I-'- L -I-I' -'- - - 1--1--1--1--l--l--1--1-+-*l-l-l-+-1-1--+--+-...._..._1-l-ll-l-1-1-1--1--1-l.i ~ ~ j ~

~ -~-l-1-1-1 l-l-ll-l-t-1-~-+-l--t--1-~--1---1 -~'--.__ -

1-i.-

i.- J. l-l-1-*l-ll-I- -'"- 1-*i- - -

-l-l-~-l--l--1--1-+-l-*l-*l-1-l-l-l-ll-ll-l-i-l-l--~++-l-+++-+-l-HH-t-t-t++-t-1-

1 -L -

_.__ 1-

+--~1-~1-11-l-1-+-~+++-l-*I-~ -1.- - -

- l-+-+-+-I_.. ~.__ - -- _..__ -

~ -

1-

  • - 11-+-J.-4--1 l--1--1--l--1-+-+-+-*l-*l-l-<l-l>-1--l-+-+-+-t--I-* - -1-1---1--1--1- - -*- -

--1- -l-+-l--l--l--l-+-+-*l-1-... _i__ _

-~....-. ______,_ ** _

-~

_ +-+--1- - L- ~ -

-~ -

-..--l-'-+-1._,__,__,__.__1 _ _,_...__..__._,_._._,1-1-**-4--...-1--+--1-- 1 -k ~i lrr utn *

.~ 00 - ~PM

-l-.l-l--l-l-_-1-l_,-1_-_ ~===~ ~ =:= = ==== :: *=:::.=I==========:::::::====*=:::'::::::::::: __ ---'- 1-1-l-+- - -- - -~ -~--

.J-1-1-_'.:,-~J_J---~ _:~lfPi~ )_{f 1-*~ - 1-1*++++ _______ -~- __ -~ ____ -*--'-

_i__ ____ 1-... _-:- -* ____ -1-- _ 1-1-1-~---i--l--1--1-*l- --l-~-l-1-+-+-+-1-1-11-l-t-+-l*+-l- __ --1~=-_

~r _

-*-<*-+--1--1-4-....... -*-i--L,__ --l-I-- ----- -*-

- -~----L---*-----L- ---*--'"---'"-- --o-1-ll-.Jl-1-1-1-...L-l-1-..._f.- __,._.._____

L--.

I l->-1--l-1-1-1 *-----~-- -


*-~*---

'-'-'-...:1FJ.-*---1...:1_

f-*.__ -

-i-- -

  • -t- -

-l-+-l---i- -L- -

_.__~-*-l-+++++-1--*l-+-+-l-l-HHr '-l--l--l-+-l--l--l-l-l-ll-l-4--J.-+-++'--t---1'--l--+1--+--1-1--1~""'.~;. *.*.-~.~l~f-t-1

++++-*l--l-l-Hl-l-i-+-~-l-l--1--1--1>-~- i-1.-1 i-- -1.- -

i.- 1--1-~--1--1--1--1-+-~- l-,_ -

1..._

in i-H1-1-1-+-1--1--1-+-1-'-'--l-l-L.... _._.__ 1- -f-t-- 1-L-l-'- t...... ' -

_,_ 1-

  • 1-.-
  • . '-r**1=~ -.y-*

1- - -1-- -~ -

-L-*-1-... -

. 1-

_.__ l-*-1 - 1--1-~--1--1--J--1-+.-1-.1-.i-l-+-'-l-ll-l-+-1--1--1-*l-l-l-l-ll-l-+*- ~- :- ~r~.*1-L- ~~ -*

-l-l*-l--l--l-1-1-il-ll-l-1-~ -

-'- --1-1-1-1--- -1-- -1 -L-L-- -- -~-- ---*- -*- --- -

-l-1-...

1 -'--;t-1-- -*bf""'- -1--1--1-+-+-.l-l-ll-l-l-+-+-+-l--l--1--1-+-~-l-l L-"- 1-... -

-~'=..~ f-1 - ~-l---i--l--l--l--1--1-+-~-~-~ -*Hl-l-+-1--1-*l-+--l-1-*Hl-1 l-"- _.1-... I~ ':t~ ~.::..*1~ -

-l--t--l-+-l-1-l-1-11-1-t-+-l--+-l -.1-*-._1-1-11-l_,_, __ 1_...__,_.._.,_._l-+-l-++++-l-*l-*I-1. 1-1-. 1 -

\\:. ~ ~~_:':i 5--

-l---i--l--l--1-+--l-l--l-ll--l-1-+-l--l--l--1--1--1-1-'- 1-1---i--+-1--l--l--l-+-1-l-1-1-l>-1-l-+-+-1--1--1-*l-l--l-l-11-1-~-+-l--l--t-+-l--l---l--+-l-Hl-ll-11-l--J.-l-l--+++-l-+-l---l-l-HH--J.-l- -+-l--._H1 ' -

1-1--1-1>-1-1-+-1--1--1-++-+-+-.1-1--1-11-1-1-1-1.-._,_ - +-+-1--1--1-+-+-+-*1-1-'-'- _._,__,__,__._ 1-'--.._,_ 1--t-- -~-~+-1-++++-+-+-+-l-HHl-l--J.-+-+-++ LLLJl-l-!-i-LJ.J.._l--l-.!-l-!..;f.:::~t!l~ll

-l--J.-f-1--1--J.-J-L- -L-L-- - 1--1-.... - 1.__ -l-1.-..L-1..-1.-.l.-J....-J.... 1-1-1-1>-l-1 --~-l--.J-1-l-il-l-t-f-1*-J--J.-J-+-l-1-*1-1-1-1...r.

1 = 1:~ rt l-1-11-l-t-+-l--l--t--l-++-+-l-l-ll-ll-l--J.-+-~-l-+-1-+-l-+*l-1-+-l--1-- -l-+-+-1---1--l--l- '- -

--l-1-1>-.l-l-t-+-+--i--l--l--l--1-+-+--l-+-I-

- -l-+-+-+ l-ll-l-1-+-1*--i--l--l--1-+-+-.i-l-l-11-1-f-+~ ~.

"i!

1--1-1>-1-t-+--i--l--l---+-+-+-.!-l-l-+-l--i--l--l-.!.1--l--I- - --1.- _1-... :_1-... ' -1-- -l-l--+-1--1--1- -1-- - -- -'*-'*-'--'--'--'-

~-+-1-1--1--1--1--1-+-+-1-i- -~ -1-+--1--+ l-Hl-l-+-r~i.- -

~I~ -1--1-+-*l-l-Hl-l>-l-+-+-l*-+ -1-... -

- -1--'--'- 1---1-1*-+-+-+-l- *-'-- -

- -1-... *- -

-l-l.-+-+-1--l--l--l-+-.l--1-1-1--1-11-l-1*- -

..:_ -L-- - -

_1-... -

i__ -

"'..:'~...!. c!

~.:_ +--i--l--l--l-+-+--1-1-1-+-l--l--1- -

-L-- --~ -

-'"--1-1-4-1-1-1---i--1--I- -

- -1-1-11-1-1 -

- 1-+-1'--1--1--l--l-*1

-*1-+--l-*1-1-1-11-1-i-I*- -*1-l-1-1-11-l-1-1--l-1-1-.1'-1-I-r.l-*..... }*

-l-1--l-1--1--1--1-+-+-*l-l- -

- _;_ - -1-- -

-l-f-1--1--1--1--1-l- -

1-1-1-1-11-1-1-+-1-1--1-l-l-IH--J.-l-+-l--++-l-*l-l--l-1-11-l ~ - *-*->--1--J--1-.1-.0-.i-1--._,,_ --1-+-~-~-1--1--1-1>-.1--l-1-l - l-1-Hl-lC....l-+-1-1-1--1--1- '-

...t - '-"'-* :;":1

-~-+-+-1--1--l-+-+-l-l-l-ll-l-l~-+~-l.*.-+_~__,_l--11--~-l-l---1--i--1--1--1--1-~--:+1--:1 1

~-+i--~i--l-I---...... _

-1...

I--_jle---1

-1_

-.j

.j.-

-.j.

+--I I==~= --.-l-+-1--1--1-1*-l--1--l-+-*l-+-1-1-11-1-4-+-.J.-1-*l-*l--+-*l-l-l*-i--l--J--1-+--1-*- ~ =:=:= =L=L~ = ~ ~: ~ ~~ :~ 1-._ *-1-1-+--1--1--1 1 --

-~: :~~ ~;~

  • l-+-*l--f-l~f-1*- -L- ~-~-1--1-1 -t- - -1-- I- - -* __._ 1-- -L- -

-l--1-++-l--l-l-l-1-11-l--J.-l-l--l-1--1_ -** -.._._ J- -

- 1 _.,_.._._ -

_[_ l- -L.......1-1-1-Jl-I-1- -1- -*- L-L- -'-1 -

-* -L-

-*l-1--1--f--l-*l-.l-l--l-0 -

- 1- - - -1-'"-

-l-++~--l-++*-l-+-1-1-L- - -* -

~ --~ __ i__ __

_ _,__,__,_ - --- -- --- *~~-*---*- -

-"--l-~ -..:.-.-I.- -

.. - -L- -

- --1-... -

- -~ ---i--.->- -1--1-*l-*-.1-l-ll-l-l-+-+--i--+.-1--1-~ - -- -

-*-1--...-1--1-1--1-li-1-1-+- * -

---~- - -- -- --1-- -L-1--'--'--1-l- -

-* l--1--1--1--t--l--1--l--*l-l-I-- -

,_i__ -

i.-

-l-l*--l---l---i--1--1--l--l-.J.- -

-L-- -* -

1-I- -*l-ll-1.-4-4-l.-+-l--1--l--l--l--l-*l-+-*l--l-I-'- -l-4*-l--1--i--l-*l-l-1--1 L- -

1- -

~ -i--l--l--l--l-*l-*l-1-1-1-l>-I-'--'--'-*'-* -

- -- -,_ -f- -

-f-1-1--1- -

1-

_i__ - 11-1-1 -.l-.l-.1-.1-1--W>-.l-l-1-L-'--1*-'- *-"-- - -*l-,l-l-i--1---1--I- -

~

-~ -

i.-

-i.- -

- 1-+-+-1--1--1--1--1-+-*1-- -

- ~-+-+-+-I

_L.-l-L--.. - --- -

--1-*- -'-1-- -L- -- -

-*i-- -- -- *-~I- ---l--L-L-'--l..-'--J-l _1-..., __ -l-l-hl-J-1*---r---L-l.-L-L..... -

0 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 255 270 285

. -r--1:1=r1-F&Hfl:l:b H-H:l*-H-+*1-1-1-1--l+H+*tH-l+l-t+l-tl--1 I

I 1*++1++H+ l-H-l+/-t-Ht-1-1-H+l+H+/-H-1 tt1j-1j-1*-1-1-'

I

~.
i.

(XlO)

,.*~~-...

\\

1972 P-ZA Nov Replaced packing 1973

==---=-------*---,--*-*-"*-*-* *-* ----- -.

Jul Replaced packing Jan Dec

. *-- -*--- ~'."'}J3 ___________________ *-

Adjusted packing.

Nov Replaced packing; I*

Jun Repla~ed.packing Jun Nov

~,,,.

P-7C Replaced packing Replaced packing Replaced packing 1974 Feb Replaced motor bearings Jun Oct' Replaced. motor bearings

~~----~*.------~----------+-------------.-.------------------

Replaced packing

/

None

..