Monthly Operating Rept for Aug 1979
ML18043A999
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/05/1979
From: Bodtke P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18043A998 List:
References
NUDOCS 7909110451
Download: ML18043A999 (4)


Text

c.*

OPERATING DATA REPORT OPERA TING ST A TUS I. Unit Name:

. Palisades *

. 2. Reporting Period:

. 790801 -

790831

3. Licensed Thermal Power (MWt):

2530

4. Nameplate Rating (Gross MWe): ___ 8_1_1_. _7 ______ _
5. Design Electrical Rating (Net MWe):
  • _ _,8_0..;:.5 _______ _
6. Maximum Dependable Capacity~(Gross-MWe): __
  • _,6""'7'-'5"-* ___ _

Notes DOCKET NO.

50-255 DATE 9/5/79 COMPLETED BY P JBod tke TELEPHONE 616-764-8913

7. Maximum Dependable Capacity (Net MWe):
  • __
  • _,6o..:3o..:5o...__ __ _
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:'
9. Power Level To Which Restricted, If Any (Net MWe):

-::10. Reasons For Restrictions, If Any:

.Yl 1. Hours In Reporting Period

12. Number Of Hours Reactor Was Critical
313_ Reactor Reserve Shutdown Hours
  • 14. Hours Generator On~Line.. *...
  • 1s. UnifReserve Shutdown Hours..

This Month 744 710.9 699.9

16. Gross Thermal Energy Gene!'lted:(MWH)-:

1, 570, 656

17. Gross Electrical Energy Generated (MWH). ______ 4_7_1.o...,4_10_
18. Net.Electrical Energy Generated (MWH).

442, 758

19. UnitServiceFactor 94.1
20. Unit Availability Factor 94.1
21. Unit Capacity Factor (Using MDC Net)
93. 7
22. Unit Capacity Factor (Using DER Net) 7 3
  • 9
  • 23. Unit Forced Outage Rate 5
  • 9 Yr.-to-Date 5831 5194.8 5070.4 11, 724,480 3,546,020 3,345,665 87.0 87.0 90.4 71.3 13.1 Cumulative 67-,502.

39,390.7 37, 252. 2 71,189,112 21,937,660 20,583,176*

55.2 55.2 48.0 37.9 36.4

24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):

Refueling scheduied for September*8, 2~ months

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):*

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • Based on Condense.r Backpressure:

Forecast Achieved (Q/77) 7 9091107"57.:i A

  • c c:

(

.RAGE DAILY UNIT POWER LEVEL MONTH August 1979 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 697 2

711 3

711 4

677 5

676 6

679 7

651 8

650 9

672

.JO, 551

'11

.359 12 641 13 708 14 764 15 688 16 729-INSTRUCTIONS DAY 17 18 19 20 21 22 23 24 25

_26 27 28 29

'30 31 DOCKET NO.

  • 50-255 UNIT Palisades DATE 9/5/79 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 A VERA GE DAILY POWER LEVEL (MWe-Net) 719 710 706 698 707 684 661 359 89 313 44 7-574 569 571 580 On this format, list the average daily unit p9wer level in MWe-Net for each c!ay in the reporting ITil>nth. Compute to the nearest whole megawatt.

(9/77)

N11:

Dall!,...

13 790810.

.14 790824 F: Fort:ed S: Scheduled i (lJ/77)

-~

{

  • J UNIT SHUTDOWNS AND POWER REDUCTIONS RE~ORT MONTH August i979

.F 21.2 A

2

  • F 23.0 A

2 Reason:

A-Equipment Failure (Explain)

B-Maintenance of Test C'-Refueling D-Rcgulatory Rest rkt iun Lit:cnsec

. Event.

Report*#

NA NA E-Opcrator Training & Lkcnse Examination F -Ad mi nist rat ivc

. G-Opcratiunal Error (Explain)

H-Olhcr (Explai11)

J E<::t cu cu

\\:I VI v:iu NA NA

.. Method:

c

"'in t::

cu 0 \\:I

.0. ':>

Eu 0

u NA NA I-Manual 2-Manual Scram.

  • 4-0lhcr (~xplain)

~.

DOCKETNO.

50-255 UNIT NAME Palisades DATE.~9~/=5/~7~9..,--~~

COMPLETED BY PJBodtke TELEPHONE 616-764-8913 Cause & Curred ive

. At:tiun to Prevent Re<.:urrcn<.:e Feedwater pump tripped during turbine va,.lve* testing.*.

Loss of feedwater flow while cutting in *the condensate demine*ralizers.

4 5

Exhibit G

  • lnstru<.:tiuns fur Preparation of Data Entry Sheets fur U.:ensee Event Report (LER) File \\NUREG*

0161)

Exhibit I

  • S:1111c Sour~~

,,. -~---* -- --~-------.,..-.._~_..---...,....-

  • -*-~-* -**

General 8-10-79 8-24-79

SUMMARY

OF SHUTDOWN EXPERIENCE FOR AUGUST 1979 With exception noted below, the unit operated at a nominal 98% of rated thermal power for the first 3 weeks of the month, then at a nominal 80% for the last week due to the end-of-life conditions of this core cycle.

The unit was manually tripped from approximately 88% of rated power after the trip of both feedwater pumps during the turbine valve testing.

The unit was manually tripped from approximately 91% of rated power due to a loss of feedwater flow while cutting in the condensate demineralizers.