OPERATING DATA REPORT OPERA TING ST A TUS I. Unit Name:
. Palisades *
. 2. Reporting Period:
. 790801 -
790831
- 3. Licensed Thermal Power (MWt):
2530
- 4. Nameplate Rating (Gross MWe): ___ 8_1_1_. _7 ______ _
- 5. Design Electrical Rating (Net MWe):
- _ _,8_0..;:.5 _______ _
- 6. Maximum Dependable Capacity~(Gross-MWe): __
- _,6""'7'-'5"-* ___ _
Notes DOCKET NO.
50-255 DATE 9/5/79 COMPLETED BY P JBod tke TELEPHONE 616-764-8913
- 7. Maximum Dependable Capacity (Net MWe):
- __
- _,6o..:3o..:5o...__ __ _
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:'
- 9. Power Level To Which Restricted, If Any (Net MWe):
-::10. Reasons For Restrictions, If Any:
.Yl 1. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 313_ Reactor Reserve Shutdown Hours
- 14. Hours Generator On~Line.. *...
- 1s. UnifReserve Shutdown Hours..
This Month 744 710.9 699.9
- 16. Gross Thermal Energy Gene!'lted:(MWH)-:
1, 570, 656
- 17. Gross Electrical Energy Generated (MWH). ______ 4_7_1.o...,4_10_
- 18. Net.Electrical Energy Generated (MWH).
442, 758
- 19. UnitServiceFactor 94.1
- 20. Unit Availability Factor 94.1
- 21. Unit Capacity Factor (Using MDC Net)
- 93. 7
- 22. Unit Capacity Factor (Using DER Net) 7 3
- 9
- 23. Unit Forced Outage Rate 5
- 9 Yr.-to-Date 5831 5194.8 5070.4 11, 724,480 3,546,020 3,345,665 87.0 87.0 90.4 71.3 13.1 Cumulative 67-,502.
39,390.7 37, 252. 2 71,189,112 21,937,660 20,583,176*
55.2 55.2 48.0 37.9 36.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
Refueling scheduied for September*8, 2~ months
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):*
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on Condense.r Backpressure:
Forecast Achieved (Q/77) 7 9091107"57.:i A
- c c:
(
.RAGE DAILY UNIT POWER LEVEL MONTH August 1979 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 697 2
711 3
711 4
677 5
676 6
679 7
651 8
650 9
672
.JO, 551
'11
.359 12 641 13 708 14 764 15 688 16 729-INSTRUCTIONS DAY 17 18 19 20 21 22 23 24 25
_26 27 28 29
'30 31 DOCKET NO.
- 50-255 UNIT Palisades DATE 9/5/79 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 A VERA GE DAILY POWER LEVEL (MWe-Net) 719 710 706 698 707 684 661 359 89 313 44 7-574 569 571 580 On this format, list the average daily unit p9wer level in MWe-Net for each c!ay in the reporting ITil>nth. Compute to the nearest whole megawatt.
(9/77)
N11:
Dall!,...
13 790810.
.14 790824 F: Fort:ed S: Scheduled i (lJ/77)
-~
{
- J UNIT SHUTDOWNS AND POWER REDUCTIONS RE~ORT MONTH August i979
.F 21.2 A
2
- F 23.0 A
2 Reason:
A-Equipment Failure (Explain)
B-Maintenance of Test C'-Refueling D-Rcgulatory Rest rkt iun Lit:cnsec
. Event.
Report*#
NA NA E-Opcrator Training & Lkcnse Examination F -Ad mi nist rat ivc
. G-Opcratiunal Error (Explain)
H-Olhcr (Explai11)
J E<::t cu cu
\\:I VI v:iu NA NA
.. Method:
c
"'in t::
cu 0 \\:I
.0. ':>
Eu 0
u NA NA I-Manual 2-Manual Scram.
- J-Autumatic Scram.
- 4-0lhcr (~xplain)
~.
DOCKETNO.
50-255 UNIT NAME Palisades DATE.~9~/=5/~7~9..,--~~
COMPLETED BY PJBodtke TELEPHONE 616-764-8913 Cause & Curred ive
. At:tiun to Prevent Re<.:urrcn<.:e Feedwater pump tripped during turbine va,.lve* testing.*.
Loss of feedwater flow while cutting in *the condensate demine*ralizers.
4 5
Exhibit G
- lnstru<.:tiuns fur Preparation of Data Entry Sheets fur U.:ensee Event Report (LER) File \\NUREG*
0161)
Exhibit I
- S:1111c Sour~~
,,. -~---* -- --~-------.,..-.._~_..---...,....-
- -*-~-* -**
General 8-10-79 8-24-79
SUMMARY
OF SHUTDOWN EXPERIENCE FOR AUGUST 1979 With exception noted below, the unit operated at a nominal 98% of rated thermal power for the first 3 weeks of the month, then at a nominal 80% for the last week due to the end-of-life conditions of this core cycle.
The unit was manually tripped from approximately 88% of rated power after the trip of both feedwater pumps during the turbine valve testing.
The unit was manually tripped from approximately 91% of rated power due to a loss of feedwater flow while cutting in the condensate demineralizers.