Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18045A652 + (15:25:51, 6 January 2025)
- ML18045A649 + (15:25:52, 6 January 2025)
- HNP-18-019, Cycle 21 Core Operating Limits Report, Revision 1 + (15:25:53, 6 January 2025)
- IR 05000255/1980011 + (15:25:54, 6 January 2025)
- ML18045A645 + (15:25:56, 6 January 2025)
- 05000255/LER-1980-032-03, /03L-0:on 800826,primary Data Logger Ceased Performing Control Rod Scans & Secondary Data Logger Typer Became Stuck.Cause Unknown.Failure Corrected by Resetting + (15:25:57, 6 January 2025)
- 05000255/LER-1980-031-01, /01T-0:on 800826,group 1 Control Rods Withdrew 121 Inches Which Resulted in Unplanned Reactivity Insertion. Caused by Loss of Both Primary & Secondary Data Loggers. Loggers Restored & Control Rods Reinserted + (15:25:59, 6 January 2025)
- ML18045A640 + (15:26:00, 6 January 2025)
- ML18045A639 + (15:26:02, 6 January 2025)
- ML18045A638 + (15:26:03, 6 January 2025)
- 05000255/LER-1980-027-01, During Venting of Quench Tank to Waste Gas Surge Tank,Gaseous Release Occurred W/O 15 Day Min Holdup.Caused by Leaking Isolation Valve & Valve Pin Disassembly.Pin Replaced + (15:26:05, 6 January 2025)
- 05000255/LER-1980-027, Forwards Updated LER 80-027/01X-1 + (15:26:06, 6 January 2025)
- ML18045A633 + (15:26:08, 6 January 2025)
- ML18045A634 + (15:26:08, 6 January 2025)
- ML18045A632 + (15:26:09, 6 January 2025)
- ML18045A631 + (15:26:09, 6 January 2025)
- ML18045A630 + (15:26:10, 6 January 2025)
- ML18045A628 + (15:26:11, 6 January 2025)
- ML18045A624 + (15:26:18, 6 January 2025)
- ML18045A623 + (15:26:19, 6 January 2025)
- ML18045A621 + (15:26:20, 6 January 2025)
- ML18045A618 + (15:26:22, 6 January 2025)
- ML18045A620 + (15:26:22, 6 January 2025)
- ML18045A614 + (15:26:23, 6 January 2025)
- ML18045A611 + (15:26:24, 6 January 2025)
- 05000255/LER-1980-030, Forwards LER 80-030/03L-0 + (15:26:25, 6 January 2025)
- ML18045A603 + (15:26:26, 6 January 2025)
- IR 05000255/1980010 + (15:26:27, 6 January 2025)
- ML18045A597 + (15:26:28, 6 January 2025)
- ML18045A596 + (15:26:29, 6 January 2025)
- ML18045A595 + (15:26:30, 6 January 2025)
- ML18045A594 + (15:26:31, 6 January 2025)
- ML18045A593 + (15:26:32, 6 January 2025)
- ML18045A592 + (15:26:33, 6 January 2025)
- ML18045A588 + (15:26:34, 6 January 2025)
- ML18045A587 + (15:26:35, 6 January 2025)
- ML18045A584 + (15:26:36, 6 January 2025)
- ML18045A585 + (15:26:36, 6 January 2025)
- ML18045A583 + (15:26:37, 6 January 2025)
- 05000255/LER-1980-023-03, Containment High Radiation Detectors Re 1805 & 1807 Determined Inoperable.No Apparent Cause for Failure.Detectors Disassembled,Cleaned & Recoated & Are Now Functional + (15:26:38, 6 January 2025)
- 05000255/LER-1980-023, Forwards Updated LER 80-023/03X-1 + (15:26:40, 6 January 2025)
- 05000255/LER-1980-028-03, /03L-0:on 800807,during Normal Power Operations, Low Level Alarm Received from Switch on SI Tank a (T 82 A). Apparently Caused by Slow Leakage from Tank.Inaccuracy of Analog Channel Attributed to Liquid Loss in Ref Leg + (15:26:42, 6 January 2025)
- 05000255/LER-1980-028, Forwards LER 80-028/03L-0 + (15:26:44, 6 January 2025)
- 05000255/LER-1980-029-01, /01T-0:on 800819,during Normal operation,CV-3031 Was Stroked Closed & Immediately Reopened.Caused by Failure to Follow Procedural Requirements Related to Plant Conditions Needed to Perform Test + (15:26:46, 6 January 2025)
- 05000255/LER-1980-029, Forwards LER 80-029/01T-0 + (15:26:47, 6 January 2025)
- ML18045A568 + (15:26:49, 6 January 2025)
- ML18045A567 + (15:26:50, 6 January 2025)
- ML18045A566 + (15:26:51, 6 January 2025)
- ML18045A563 + (15:26:52, 6 January 2025)
- ML18045A564 + (15:26:52, 6 January 2025)
- ML18045A562 + (15:26:54, 6 January 2025)