IE Insp Rept 50-255/80-09 on 800624-25.Noncompliance Noted: Failure to Follow Procedures for Documentation & Training
ML18045A588
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/18/1980
From: Baker K, Schulz R, Swanson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML18045A586 List:
References
50-255-80-09, 50-255-80-9, NUDOCS 8009100140
Download: ML18045A588 (3)


See also: IR 05000255/1980009

Text

U.S. NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-255/80-09

'

Docket No. 50-255

License No. DPR-20

Licensee:

Consumers Power Company

212 West Michigan Avenue

Jackson, MI

49201

Facility Name:

Palisades Nuclear Generating Plant

Inspection at: Palisades Site, Covert, MI

Inspection Conducted:

June 24-25, 1980

.

~~/4___.

Inspectors:

~pchul~ /}

_

-~P~

E. R. Swanson

Approved By: il1,.&'~ief

Nuclear Support Section 2

Inspection Summary

Inspection on June 24-25, 1980 (Report No. 50-255/80-09)

4r4V

7/rs/<00

~/

?#tk

Areas Inspected:

Routine, unannounced inspection of training and requal-

ification training for licensed operators and other plant employees. The

inspection involved 29 inspector-hours _onsite by two NRC inspectors.

Results:

Of the two areas inspected, no apparent items of noncompliance

or deviations were identified in one area; one apparent item of noncom-

pliance (Deficiency-failure to adhere to procedures for.training and

documentation - Paragraph 4), was identified in one area.

\\ LfO

DETAILS

1.

Persons Contacted

  • J. G. Lewis, General Plant Manager
  • H. W. Keiser, Plant Operations Superintendent
  • G. H. Petitjean, Technical Engineer
  • N. Hough, Senior Engineer - Training
  • R. E. McCaleb, Quality Assurance Superintendent

The inspectors also interviewed 6 other licensee employees during

the course of the inspection.

  • Denotes those present at the exit interview.

2.

Followup on Items of Noncompliance

(255/78-26):

Failure to adhere to procedures for training and

documentation.

As discussed in Paragraph 4 corrective action taken

and actions taken to prevent recurrence appear to have not been

effective.

3.

Licensed Operator Requalification Training

4.

The requalification training was reviewed to ascertain its con-

formance with Consumer Power Company's current Licensee Requalifica-

tion Program and regulatory requirements.

The inspector verified

that the established program includes the scheduled use of prepared

lesson plans.

On-the-job training requirements have been specified

to include control manipulations, review of changes in facility

design, procedures and license.

Training records of licensed indi-

viduals are maintained to include completed course and yearly

examinations, documentation of manipulations, documentation of

required simulations of emergency and abnormal conditions, results

of supervisory evaluations and observations of manipulations and

simulations.

The inspector reviewed the records of licensed senior reactor

operators and licensed reactor operators to verify that the licensee's

approved requalification program was being properly implemented.

Operators were interviewed to ascertain whether the training docu-

mented had been received.

No items of noncompliance or deviations were identified.

Training

The inspector reviewed the licensee's program for conducting general

employee training and retraining, training for temporary employees

and on-the-job training for operators, craftsmen, technicians, and

QA/QC personnel.

No major changes to the licensee's program had

been made since the last inspection in this area.

The majority of

- 2 -

s.

the changes were related to corrective action taken in response to

the item of noncompliance which resulted from the last inspection.

Job related Quality Assurance training was deleted, as were some

specific time requirements. It was found, however, that even.with

slightly relaxed training programs for General Employee Training

and Departmental Employee Training, many training requirements were

not documented in individual training records.

From reviewing a

selection of training records provided by the licensee for review,

the inspectors discovered many deficiencies similar to those pointed

out at the last inspection.

Included were:

(a)

Crane Safety Training, Forklift Training, and Controlled

Material Procedures Training not conducted every 2 years as

required by Administrative Procedure 13.3 (4 of 5 records from

maintenance disciplines}.

(b)

Industrial Safety and Quality Assurance Indoctrination not

conducted as required by Administrative Procedure 13.1 (3 of

12 GET records).

This constitutes an item of noncompliance with the Technical Speci-

fications Section 6.10.le and is classified as a deficiency.

The inspectors verified that the training documented in individual

training records was received by interviewing a selection of the

different categories of employees.

One of twelve General Employee Training Records reviewed was noted

to include an audit of documented training.

However, it had not

been completed in that no one was assigned responsibility for

correcting the deficiencies which were discovered, thereby rendering

it useless as a means of correcting the deficiencies.

The inspector also reviewed a Quality Assurance audit dated

October 27, 1978, and noted that several audit findings paralleled

the findings of this inspection.

Apparently, the corrective action

taken to correct the audit findings was not effective since similar

examples still exist.

In addition, the response.to IE Inspection

Report 78-26 describing corrective actions taken, corrective actions

taken to prevent recurrence, and the date when full compliance was

to be achieved was examined in light of the above findings.

The

licens'ee apparently did not effectively perform the corrective actions

he committed to complete.

Exit Interview

The inspectors met with the licensee representatives (denoted i~

Paragraph 1) with the NRC Senior Resident and Resident Inspectors

present on June 25, 1980.

The inspectors summarized the scope and

findings of the inspection.

The licensee discussed intentions they

have for reorganizing the Departmental and Special Employee Training

Programs into more effective programs.