Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18046A409 + (15:18:42, 6 January 2025)
- PNO-III-80-197, on 801023,unplanned Gaseous Release Occurred While Sluicing Fuel Pool Demineralizer Resins to Spent Resin Storage Tank.Caused by Overpressurization of Dirty Equipment Drain Tank + (15:18:42, 6 January 2025)
- 05000255/LER-1981-006, Forwards LER 81-006/03L-0 + (15:18:44, 6 January 2025)
- 05000255/LER-1981-005, Forwards LER 81-005/01L-0 + (15:18:45, 6 January 2025)
- ML18046A399 + (15:18:46, 6 January 2025)
- PNO-III-81-004, on 810106,circuit Breakers in Both Battery Outlet Circuits Supplying 125-volt Dc Control Buses 1 & 2 Opened.Breakers Closed in 1-h + (15:18:48, 6 January 2025)
- PNO-III-80-201, on 801030,diesel Generator 1-2 Taken Out of Svc for Surveillance Testing While Charging Pump P-55-C on Opposite Emergency Bus Was Out of Svc for Maint.Emergency Boration Capability Degraded + (15:20:13, 6 January 2025)
- ML18046A396 + (15:20:13, 6 January 2025)
- IR 05000255/1980014 + (15:20:15, 6 January 2025)
- PNO-III-80-221, on 801204,during Filling of Safety Injection Accumulators,Flow Dropped to Zero.Caused by 1-inch Shaft on Sys Isolation Valve CV-3066 Breaking,Resulting in Plug Seating in Closed Position.Valve Will Be Replaced + (15:20:17, 6 January 2025)
- 05000255/LER-1981-004, Forwards LER 81-004/01T-0 + (15:20:19, 6 January 2025)
- ML18046A385 + (15:20:20, 6 January 2025)
- ML18046A381 + (15:20:21, 6 January 2025)
- ML18046A382 + (15:20:21, 6 January 2025)
- ML18046A379 + (15:20:22, 6 January 2025)
- 05000255/LER-1981-003, Forwards LER 81-003/03L-0 + (15:20:24, 6 January 2025)
- ML18046A376 + (15:20:25, 6 January 2025)
- ML18046A374 + (15:20:26, 6 January 2025)
- ML18046A372 + (15:20:26, 6 January 2025)
- ML18046A368 + (15:20:27, 6 January 2025)
- ML18046A366 + (15:20:28, 6 January 2025)
- ML18046A365 + (15:20:32, 6 January 2025)
- ML18046A359 + (15:20:33, 6 January 2025)
- ML18046A355 + (15:20:35, 6 January 2025)
- ML18046A353 + (15:20:35, 6 January 2025)
- ML18046A352 + (15:20:36, 6 January 2025)
- ML18046A351 + (15:20:38, 6 January 2025)
- ML18046A350 + (15:20:40, 6 January 2025)
- ML18046A348 + (15:20:41, 6 January 2025)
- IR 05000255/1980022 + (15:20:42, 6 January 2025)
- ML18046A345 + (15:20:43, 6 January 2025)
- ML18046A344 + (15:20:44, 6 January 2025)
- ML18046A343 + (15:20:45, 6 January 2025)
- ML18046A341 + (15:20:46, 6 January 2025)
- ML18046A337 + (15:20:47, 6 January 2025)
- ML18046A336 + (15:20:48, 6 January 2025)
- ML18046A334 + (15:20:49, 6 January 2025)
- ML18046A333 + (15:20:50, 6 January 2025)
- ML18046A331 + (15:20:51, 6 January 2025)
- ML18046A332 + (15:20:51, 6 January 2025)
- ML18046A329 + (15:20:52, 6 January 2025)
- ML18046A328 + (15:20:53, 6 January 2025)
- NUREG/CR-1833, Forwards Request for Addl Info Necessary to Complete SEP Seismic Review.Info Identified as Open Items from Draft NUREG/CR-1833, Seismic Review of Palisades Nuclear Power Plant,Unit 1,As Part of Sep. W/O NUREG + (15:20:54, 6 January 2025)
- ML18046A326 + (15:20:56, 6 January 2025)
- ML18046A323 + (15:20:57, 6 January 2025)
- ML18046A325 + (15:20:57, 6 January 2025)
- ML18046A322 + (15:20:58, 6 January 2025)
- IR 05000255/1980015 + (15:20:59, 6 January 2025)
- ML18046A318 + (15:21:01, 6 January 2025)
- ML18046A317 + (15:21:03, 6 January 2025)
- ML18046A316 + (15:21:04, 6 January 2025)