ML18046A379
| ML18046A379 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 02/09/1981 |
| From: | Kennedy D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML18046A380 | List: |
| References | |
| NUDOCS 8102170091 | |
| Download: ML18046A379 (5) | |
Text
consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 February 9, 1981 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCK.ET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of January 1981.
David M Kennedy General Engineer CC JGKeppler, USNRC KWBerry, P24-207A DPHoffman, P24-115 GHRPetitjean, Palisades Resident Inspector, Palisades CVWaits, Pll-228B LTPhillips, P21-327 DEVanFarowe, Div of Radiological Health Lansing, MI SMierzwa, Mich Dept of Labor RCallen, Mich Public Service Commission BLavallee, NSAC Document Control (2) 950-22*35*10
(
I
"-~.'
OPERA TING DAT A REPORT OPERA TING ST A TUS
- 1. Unit Name:
Palisades
- 2. Reporting Period:
810101 810131
- 3. Licensed Thermal Power (MWt):
2530
- 4. Nameplate Rating (Gross MWe):
811. 7
- 5. Design Electrical Rating (Net MWe): _ ___,8:....:0:..:05=----------
- 6. Maximum Dependable Capacity (Gross MWe): _-r_,6c....7'-'5'--* ___ _
- 7. Maximum Dependable Capacity (Net MWe):
_* *_6_3_5 ____ _
Notes DOCKET NO.
DATE COMPLETED BY TELEPHONE 50-255 2/9/81 PJBodtke 616-764-8913
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
IO. Reasons For Restrictions, If Any:
This Month Yr.-to-Date 1.1. Hours In Reporting Period 744 744
- 12. Number Of Hours Reactor Was CritiCal 723.4 723.4
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line --- --
715. 9 715. 9
- 15. Unit Reserve Shutdow~ Hours -
- 16. Gross Thennal Energy Generated (MWH) 1 777 944 1,777,944
- 17. Gross Electrical Energy Generated (MWH) 556,370 556,370
- 18. Net Electrical Energy Generated (MWH) 527,917 527,917
- 19. Unit Service Factor 96.2 96.2
- 20. Unit Av_ailability Factor
- 96. 2 96.2
- 21. Unit Capacity Factor (Using MDC Net) 111. 7 lll. 7
- 22. Unit Capacity Factor (Using DER Net) 88
- 1 88;1
- 23. Unit Forced Outage Rate
- 3. 8 3.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):
25_ If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure Forecast Cumulative 79,959.
44,245.8 41, 909:. 4 81,481,680 25,120,780 23,578,221 52.4 52.4 46.4
- 36. 6-34.6 Achieved (9/77)
- i.
- .: i
eERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-255 UNIT Palisades.
DAlE 2/9/81 COMPLElED BY PJBodtke TELEPHONE 616-764-8913 MONTIJ January 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)
I 757 17 733 2*
739 I8 738 3
753 19 747 4
744 20 755 s
745 21 755 6
757 -.
22 754 7
758 23 763 8
743 24 752 9
732 25 743
.10 751 26 748 11 694 27 754.
745 747 12 28 13 750 29 744 14 753 30 750.
IS 0
31 749 16 342 INSlRUCTIONS On this format. list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
N11.
Date 22 810115 2
F: Forced S: Scheduled (9/77)
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH January 1981
""L
~ ~
r1
'.)
bO +-*
~ 'J
~ "'
"'O *=
- -:J
<IJ
- = ~
~
~ -
<\\.)
0..
- -:J
~
- -:J
.c~o::
8~
f-0::
Q)..c
~
- (/)
8 F
- 28. 1 A
1 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test
(-Refueling D-Rcgulatory Restriction Licensee Event Report tt E-Operator Training & License Examination F-Ad min isl rat ive G-Operational Error (Explain)
II-Other (Explain)
)*
3 c
Ev
"'vi I::
<IJ
<IJ
<IJ 0 "O
. ~ 1:!
0.. '.)
>. ~
Eu
(/) u 0 u Method:
I-Manual 2-Manual Scram.
3-Automat ic Scram.
4-0ther (Explain)
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-255 Palisades 2/9/81 PJBodtke 616-764-8913 Cause & Corrective Action to Prevent Recurrence Power supply failure to steam generator level controller.
4 5
Ex11ibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LERl File (NUREG-0161)
Exhibit I - Same Soun.:~
---*--'--**--'-**------~-w--*---*-------
- ---~--*~ -*-*~*-----~-*-*-<<--~* -*-*****- *- * * **-* ***:_=:=~===c..c.=:===-'--'~--~~----------
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH OF JANUARY 1981 The plant operated at essentially 100% power the entire month with the only substantial power decrease occurring on January
- 15.
At that time, the reactor was manually tripped in response to erratic feedwater control.
Power production continued the following day.