ML18046A379

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Jan 1981
ML18046A379
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/09/1981
From: Kennedy D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML18046A380 List:
References
NUDOCS 8102170091
Download: ML18046A379 (5)


Text

consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 February 9, 1981 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCK.ET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of January 1981.

David M Kennedy General Engineer CC JGKeppler, USNRC KWBerry, P24-207A DPHoffman, P24-115 GHRPetitjean, Palisades Resident Inspector, Palisades CVWaits, Pll-228B LTPhillips, P21-327 DEVanFarowe, Div of Radiological Health Lansing, MI SMierzwa, Mich Dept of Labor RCallen, Mich Public Service Commission BLavallee, NSAC Document Control (2) 950-22*35*10

(

I

"-~.'

OPERA TING DAT A REPORT OPERA TING ST A TUS

1. Unit Name:

Palisades

2. Reporting Period:

810101 810131

3. Licensed Thermal Power (MWt):

2530

4. Nameplate Rating (Gross MWe):

811. 7

5. Design Electrical Rating (Net MWe): _ ___,8:....:0:..:05=----------
6. Maximum Dependable Capacity (Gross MWe): _-r_,6c....7'-'5'--* ___ _
7. Maximum Dependable Capacity (Net MWe):

_* *_6_3_5 ____ _

Notes DOCKET NO.

DATE COMPLETED BY TELEPHONE 50-255 2/9/81 PJBodtke 616-764-8913

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):

IO. Reasons For Restrictions, If Any:

This Month Yr.-to-Date 1.1. Hours In Reporting Period 744 744

12. Number Of Hours Reactor Was CritiCal 723.4 723.4
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line --- --

715. 9 715. 9

15. Unit Reserve Shutdow~ Hours -
16. Gross Thennal Energy Generated (MWH) 1 777 944 1,777,944
17. Gross Electrical Energy Generated (MWH) 556,370 556,370
18. Net Electrical Energy Generated (MWH) 527,917 527,917
19. Unit Service Factor 96.2 96.2
20. Unit Av_ailability Factor
96. 2 96.2
21. Unit Capacity Factor (Using MDC Net) 111. 7 lll. 7
22. Unit Capacity Factor (Using DER Net) 88
  • 1 88;1
23. Unit Forced Outage Rate
3. 8 3.8
24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):

25_ If Shut Down At End Of Report Period, Estimated Date of Startup:

26. Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • Based on condenser backpressure Forecast Cumulative 79,959.

44,245.8 41, 909:. 4 81,481,680 25,120,780 23,578,221 52.4 52.4 46.4

36. 6-34.6 Achieved (9/77)
i.
  • .: i

eERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-255 UNIT Palisades.

DAlE 2/9/81 COMPLElED BY PJBodtke TELEPHONE 616-764-8913 MONTIJ January 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net)

I 757 17 733 2*

739 I8 738 3

753 19 747 4

744 20 755 s

745 21 755 6

757 -.

22 754 7

758 23 763 8

743 24 752 9

732 25 743

.10 751 26 748 11 694 27 754.

745 747 12 28 13 750 29 744 14 753 30 750.

IS 0

31 749 16 342 INSlRUCTIONS On this format. list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

N11.

Date 22 810115 2

F: Forced S: Scheduled (9/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH January 1981

""L

~ ~

r1

'.)

bO +-*

~ 'J

~ "'

"'O *=

-:J

<IJ

  • = ~

~

~ -

<\\.)

0..

-:J

~

-:J

.c~o::

8~

f-0::

Q)..c

~

(/)

8 F

28. 1 A

1 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test

(-Refueling D-Rcgulatory Restriction Licensee Event Report tt E-Operator Training & License Examination F-Ad min isl rat ive G-Operational Error (Explain)

II-Other (Explain)

)*

3 c

Ev

"'vi I::

<IJ

<IJ

<IJ 0 "O

. ~ 1:!

0.. '.)

>. ~

Eu

(/) u 0 u Method:

I-Manual 2-Manual Scram.

3-Automat ic Scram.

4-0ther (Explain)

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-255 Palisades 2/9/81 PJBodtke 616-764-8913 Cause & Corrective Action to Prevent Recurrence Power supply failure to steam generator level controller.

4 5

Ex11ibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LERl File (NUREG-0161)

Exhibit I - Same Soun.:~

---*--'--**--'-**------~-w--*---*-------

    • ---~--*~ -*-*~*-----~-*-*-<<--~* -*-*****- *- * * **-* ***:_=:=~===c..c.=:===-'--'~--~~----------

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH OF JANUARY 1981 The plant operated at essentially 100% power the entire month with the only substantial power decrease occurring on January

15.

At that time, the reactor was manually tripped in response to erratic feedwater control.

Power production continued the following day.