Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18057B251 + (13:47:54, 6 January 2025)
- ML18057B242 + (13:47:55, 6 January 2025)
- ML18057B235 + (13:47:56, 6 January 2025)
- ML18057B237 + (13:47:56, 6 January 2025)
- 05000255/LER-1991-016, :on 910523,containment Spray pump,P-54C,failed to Start Using Local Control Switch at Station Breaker. Caused by Failure of Closing Coil Fuses to Complete Closing Circuit.Troubleshooting Methods Reinforced + (13:47:58, 6 January 2025)
- IR 05000255/1991014 + (13:48:02, 6 January 2025)
- ML18057B231 + (13:48:04, 6 January 2025)
- ML18057B230 + (13:48:05, 6 January 2025)
- ML18057B225 + (13:48:06, 6 January 2025)
- TAC:48726 + (13:48:06, 6 January 2025)
- ML18057B223 + (13:48:07, 6 January 2025)
- ML18057B222 + (13:48:08, 6 January 2025)
- ML18057B221 + (13:48:09, 6 January 2025)
- ML18057B220 + (13:48:09, 6 January 2025)
- 05000255/LER-1991-015, :on 910712,main Feedwater Pump Turbine Tripped While Troubleshooting Indication of Low Bearing Oil Pressure on Main Turbine.Caused by Personnel Error & Equipment Failure.Affected Circuit Components Replaced + (13:48:11, 6 January 2025)
- ML18057B204 + (13:48:12, 6 January 2025)
- TAC:68578 + (13:48:13, 6 January 2025)
- ML18057B202 + (13:48:14, 6 January 2025)
- ML18057B200 + (13:48:16, 6 January 2025)
- ML18057B193 + (13:48:17, 6 January 2025)
- 05000255/LER-1991-012, :on 910703,reactor Trip Occurred.Caused by Failure of Electrical Components in Reactor Protective Sys Circuitry.Corrective Actions Include,Evaluating Periodic Monitoring of Reactor Protective Sys Circuitry + (13:48:18, 6 January 2025)
- 05000255/LER-1991-013, :on 910507,leak Identified in One Containment Spray Header at Upper Containment Elevation.Caused by Personnel Error.Event Will Be Reviewed W/Plant Mgt, Engineering,Maint & Operations Planners + (13:48:24, 6 January 2025)
- ML18057B190 + (13:48:25, 6 January 2025)
- ML18057B189 + (13:48:26, 6 January 2025)
- 05000255/LER-1991-011, :on 910627,determined That Core Exit Thermocouple Electrical Connectors Not Fastened to Supports, Per Seismic Analysis for in-core Detectors.Caused by Inadequate Procedure.Procedure Revised.W/Undated Ltr + (13:48:27, 6 January 2025)
- ML18057B186 + (13:48:29, 6 January 2025)
- ML18057B185 + (13:48:31, 6 January 2025)
- ML18057B184 + (13:48:32, 6 January 2025)
- ML18057B182 + (13:48:33, 6 January 2025)
- ML18057B181 + (13:48:34, 6 January 2025)
- ML18057B180 + (13:48:35, 6 January 2025)
- TAC:76588 + (13:48:35, 6 January 2025)
- ML18057B171 + (13:48:37, 6 January 2025)
- ML18057B170 + (13:48:38, 6 January 2025)
- ML18057B167 + (13:48:39, 6 January 2025)
- ML18057B168 + (13:48:39, 6 January 2025)
- PMNS20180218, Pre-Submittal Meeting with Exelon Generation Company, LLC Regarding a Proposed License Amendment Request for Calvert Cliffs Nuclear Power Plant to Relocate Plant Emergency Operations Facility and Technical Support Center + (13:48:40, 6 January 2025)
- ML18057B165 + (13:48:42, 6 January 2025)
- ML18057B164 + (13:48:44, 6 January 2025)
- ML18057B160 + (13:48:45, 6 January 2025)
- ML18057B159 + (13:48:46, 6 January 2025)
- ML18057B157 + (13:48:47, 6 January 2025)
- ML18057B148 + (13:48:48, 6 January 2025)
- ML18057B139 + (13:48:49, 6 January 2025)
- IR 05000458/2017006 + (13:48:50, 6 January 2025)
- ML18057B136 + (13:48:50, 6 January 2025)
- IR 05000298/2017006 + (13:48:51, 6 January 2025)
- ML18057B126 + (13:48:53, 6 January 2025)
- RS-18-006, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control + (13:48:54, 6 January 2025)
- IR 05000416/2017006 + (13:49:00, 6 January 2025)