ML18057B157
| ML18057B157 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/12/1991 |
| From: | Beverly Clayton NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Slade G CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML18057B158 | List: |
| References | |
| NUDOCS 9107220047 | |
| Download: ML18057B157 (4) | |
See also: IR 05000255/1991012
Text
Docket No. 50-255
Consumers Power Company
ATTN:
Gerald B. Slade
General Manager
Palisades Nuclear Generating Plant
27780 Blue Star Memorial Highway
Covert, MI
49043
Dear Mr. Slade:
JUL 1 2 1991
This refers to the routine safety inspection, conducted by Messrs.
J. K. Heller, J. R. Roton, C. E. Brown and E. R. Schweibinz of this
office during the period of May 14 through July 1, 1991, of activities
at the Palisades Nuclear Generating Plant authorized by NRC Facility
Operating License No. DPR-20 and to the discussion of our findings with
Mr. R. M. Rice and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice of Violation. A
written response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, and the enclosed inspection report will be placed in the NRC
Public Document Room.
The response directed by this letter and the accompanying Notice of Violation
are not subject to the clearance procedures of the Office of Management and
Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Enclosures:
1.
2.
Inspection Report
No. 50-255/91012(DRP)
See Attached
~v
RII I n
JZ7 Ji 1/1~1 \\
sf~;n/dp
Distribution ,)IL_(
RI II
(--*,"7/
.
<::_..:/:..-,-
Sincerely,
Brent Clayton, Chief
Projects Branch 2
~
RIII (Zc
9107220047 910712
/*'::Jorgensen
Cla)"ton
f/r01
ADOCK 05000255
~~~~~~~~~-P~D~R~~
~£01
Consumers Power Company
Distribution
cc w/enclosures:
David P. Hoffman, Vice President
Nuclear Operations
P. M. Do*nne lly, Safety and
Licensing Director
DCD/DCB (RIDS)
OC/LFDCB
Resident Inspector, RIII
James R. Padgett, Michigan Public
Service Commission
Michigan Department of
Public Health
Palisades, LPM, NRR
SRI, Big Rock Point
JUL 1 ?. 1991
2
UNITED STATES
NUCLEAR REGULATORY COMMISSION
Docket No. 50-255
Consumers Power Company
ATTN:
Gerald B. Slade
General Manager
REGION Ill
799 ROOSEVELT ROAD
GLEN ELLYN, ILLINOIS 60137
JUL 12 qS£Q
Palisades Nuclear Generating Plant
27780 Blue Star Memorial Highway
Covert, MI
49043
Dear Mr. Slade:
This refers to the routine s~fety inspection, conducted by Messrs.
J. K. Heller, J. R. Roton, C. E. Brown and E. R. Schweibinz of this
office during the period of May 14 through July 1, 1991, of activities
at the Palisades Nuclear Generating Plant authorized by NRC Facility
Operating License No. DPR-20 and to the discussion of our findings with
Mr. R. M. Rice and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
~interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice of Violation. A
written response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, and the enclosed inspection report will be placed in the NRC
Public Document Room.
The response directed by this letter and the accompanying Notice of Violation
are not subject to the clearance procedures of the Office of Management and
Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Enclosures:
1.
2.
Inspection Report
No. 50-255/91012(DRP)
See Attached Distribution
Sincerely,
- W~L-
Brent Clayton, Chief
Projects Branch 2
Consumers Power Company
Distribution
cc w/enclosures:
i
David P. Hoffman, Vic~ President
Nuclear Operations
P. M. Donnelly, Safety and
Licensing Director
DCD/DCB (RIDS)
OC/LFDCB
.
Resident Inspector, RIII
James R. Padgett, Michigan Public
Service Commission
Michigan Department of
Public Hea 1th
Palisades, LPM, NRR
SRI, Big Rock Point
I,':
I ;c
JUL 1 z 19'31
2