ML18057B193

From kanterella
Jump to navigation Jump to search
Advises That Programmed Enhancements to Address Generic Ltr 88-17, Loss of DHR Implemented,Except for Shutdown Cooling Sys Tech Specs,Per NRC 910717 Ltr.Updated Tech Spec Change Requested Will Be Submitted by 911001
ML18057B193
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/01/1991
From: Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-88-17, TAC-69761, NUDOCS 9108070127
Download: ML18057B193 (1)


Text

consumers Power GB Slade General Manager l'OWERINli MICHlliAN~S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043

. August 1, 1991 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

PROGRAMMED ENHANCEMENTS FOR GENERIC LETTER 88-17, LOSS OF DECAY HEAT REMOVAL (TAC NO. 69761)

NRC letter dated October 17, 1988 (Generic Letter 88-17, "Loss of Decay Heat Removal") discussed loss of decay heat removal events during shutdown conditions and recommended expeditious actions and long term programmed enhancements. The letter required submittal of actions taken to implement the recommended expeditious actions within 60 days and a submittal of a description of enhancements, specific plans and an implementation schedule for each of the six recommended programmed enhancements within 90 days. Consumers Power Company's response to the recommended expeditious actions for the Palisades Plant was provided by letter dated January 3, 1989 and Consumers Power Company's response to the recommended programmed enhancements for the Palisades Plant was provided by letter dated January 31, 1989. Additionally, the NRC letter dated July 17, 1990 requested that Consumers Power Company inform the NRC in writing when the scheduled actions have been implemented and the scheduled modifications are determined to be operational.

This letter is in response to the NRC July 17, 1990 letter and hereby informs the NRC that the actions were implemented and modifications were completed as scheduled. Thus, the expeditious actions and programmed enhancements, with the exception of the shutdown cooling system technical specifications, have been implemented or are operational. The shutdown cooling system.technical specifications change request was submitted on June 28, 1989, revised on May 1, 1991, and is, at the request of the NRC staff, undergoing further revision which will be submitted before October 1, 1991.

~~

Gerald B Slade General Manager CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades