Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18059A528 + (12:47:17, 6 January 2025)
- ML18059A527 + (12:47:18, 6 January 2025)
- ML18059A526 + (12:47:26, 6 January 2025)
- ML18059A523 + (12:47:34, 6 January 2025)
- ML18059A521 + (12:47:35, 6 January 2025)
- 05000255/LER-1993-009, :on 930916,identified Pressurizer Penetration Safe End Crack Which Resulted in PCS Leakage.Crack Initiated Due to PWSCC in HAZ of PORV Inconnel 600 Safe End. Engineering Evaluation of Failure Conducted + (12:47:37, 6 January 2025)
- ML18059A519 + (12:47:38, 6 January 2025)
- 05000255/LER-1993-009-01, Forwards LER 93-009-01 Re Pressurizer Penetration Safe End Crack Resulting in PCS Leakage,Suppl Rept.Suppl Changes Event Date from 930919 to 930916 + (12:47:40, 6 January 2025)
- ML18059A515 + (12:47:43, 6 January 2025)
- ML18059A516 + (12:47:43, 6 January 2025)
- ML18059A513 + (12:47:45, 6 January 2025)
- ML18059A512 + (12:47:46, 6 January 2025)
- ML18059A511 + (12:47:47, 6 January 2025)
- ML18059A510 + (12:47:48, 6 January 2025)
- ML18059A509 + (12:47:49, 6 January 2025)
- 05000255/LER-1993-007-01, :on 930817,degradation of Boraflex Neutron Absorber in Surveillance Coupons Observed.Cause of Event Unknown.Temporary Requirement for Daily Sampling & Analysis of SFP Boron Discontinued + (12:47:51, 6 January 2025)
- ML18059A504 + (12:47:53, 6 January 2025)
- ML18059A497 + (12:47:54, 6 January 2025)
- 05000255/LER-1993-011, :on 931009,insp of Pressurizer Upper Temp Nozzle Penetration Found to Be Leaking.Caused by Primary Water Stress Corrosion Cracking of Inconel 600 Nozzle Matl. Leaking Pressurizer Temp Penetrations Repaired + (12:47:56, 6 January 2025)
- ML18059A492 + (12:47:57, 6 January 2025)
- ML18059A491 + (12:47:58, 6 January 2025)
- ML18059A490 + (12:47:59, 6 January 2025)
- ML18059A488 + (12:48:02, 6 January 2025)
- ML18059A487 + (12:48:03, 6 January 2025)
- ML18059A483 + (12:48:04, 6 January 2025)
- ML18059A482 + (12:48:06, 6 January 2025)
- ML18059A481 + (12:48:07, 6 January 2025)
- ML18059A480 + (12:48:08, 6 January 2025)
- ML18059A479 + (12:48:09, 6 January 2025)
- ML18059A478 + (12:48:17, 6 January 2025)
- ML18059A476 + (12:48:18, 6 January 2025)
- STC-18-017, Notification of Acceptance to the Diagnostic and Therapeutic Nuclear Medicine (H-304) Course - May 14-18, 2018 - Houston, Tx + (12:48:19, 6 January 2025)
- ML18059A469 + (12:48:21, 6 January 2025)
- ML18059A468 + (12:48:22, 6 January 2025)
- ML18059A467 + (12:48:23, 6 January 2025)
- ML18059A464 + (12:48:24, 6 January 2025)
- ML18059A459 + (12:48:25, 6 January 2025)
- ML18059A456 + (12:48:29, 6 January 2025)
- TAC:87760 + (12:48:29, 6 January 2025)
- ML18059A454 + (12:48:30, 6 January 2025)
- ML18059A453 + (12:48:31, 6 January 2025)
- 05000255/LER-1993-010, :on 930917,primary Coolant Sys Cooldown Rate as Defined in TS Exceeded.Caused by Combination of Personnel Error & Inadequate Procedures.Proper Temp Monitoring Techniques Verified + (12:48:33, 6 January 2025)
- ML18059A444 + (12:48:43, 6 January 2025)
- ML18059A440 + (12:48:44, 6 January 2025)
- ML18059A439 + (12:48:45, 6 January 2025)
- 05000255/LER-1993-004, :on 930630,fuel Rod Failed & Loss of SNM Discovered Following Refueling Operations.Caused by Core Shroud & Fuel Assembly Interface Problem.Fuel Assembly Insps Increased & Failed Fuel Response Plan Implemented + (12:48:47, 6 January 2025)
- 05000255/LER-1993-004-01, Forwards LER 93-004-01.Suppl LER Includes Summary of Results of Root Cause Analysis Performed to Determine Reasons for Failure of Fuel Assembly I-024 & Subsequent Discharge of Nuclear Fuel Into Primary Coolant + (12:48:52, 6 January 2025)
- ML18059A433 + (12:48:53, 6 January 2025)
- ML18059A432 + (12:48:55, 6 January 2025)
- ML18059A431 + (12:48:56, 6 January 2025)
- ML18059A430 + (12:48:57, 6 January 2025)