Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18082A745 + (10:36:33, 6 January 2025)
- ML18082A744 + (10:36:35, 6 January 2025)
- ML18082A743 + (10:36:36, 6 January 2025)
- ML18082A742 + (10:36:37, 6 January 2025)
- ML18082A738 + (10:36:38, 6 January 2025)
- ML18082A741 + (10:36:38, 6 January 2025)
- ML18082A737 + (10:36:39, 6 January 2025)
- 05000311/LER-1980-004-03, /03L-0:on 800610,during Routine Surveillance,Both Safety Injection Pumps Were Made Operable at Less than 312 F in Rcs.Caused by Lack of Procedure to Limit Max Number of Operable Safety Pumps + (10:36:40, 6 January 2025)
- 05000311/LER-1980-004, Forwards LER 80-004/03L-0 + (10:36:42, 6 January 2025)
- ML18082A731 + (10:36:43, 6 January 2025)
- ML18082A730 + (10:36:44, 6 January 2025)
- ML18082A728 + (10:36:45, 6 January 2025)
- ML18082A727 + (10:36:49, 6 January 2025)
- ML18082A726 + (10:36:50, 6 January 2025)
- 05000272/LER-1980-031-99, /99X-0:on 800608,lightning Hit South Penetration Area Causing Failure of Two Main Steam Pressure Transmitters.Transmitters Replaced & Will Be Analyzed.Surge Protection Being Investigated + (10:36:51, 6 January 2025)
- 05000272/LER-1980-031, Forwards LER 80-031/99X-0 + (10:36:52, 6 January 2025)
- ML18082A721 + (10:36:54, 6 January 2025)
- 05000272/LER-1980-033-03, /03L-0:on 800609,while Preparing to Change Modes, Quadrant Power Tilt Ratio Was Noted to Have Not Been Completed within 7 Days.Caused by Lack of Checklist on Tickler Sys.Checklist Distributed for Initialing + (10:36:55, 6 January 2025)
- 05000272/LER-1980-033, Forwards LER 80-033/03L-0 + (10:36:56, 6 January 2025)
- ML18082A717 + (10:36:57, 6 January 2025)
- ML18082A714 + (10:36:58, 6 January 2025)
- 05000272/LER-1980-032-03, /03L-0:on 800608,while Performing Sp 4.6.1.3 on Containment Air Lock,Leak Rate Exceeded Tech Specs.Caused by Failure of Inner Door Seals to Hold Pressure.Seals Were Reversed,Adjusted & Tested Satisfactorily + (10:36:59, 6 January 2025)
- 05000272/LER-1980-032, Forwards LER 80-032/03L-0 + (10:37:01, 6 January 2025)
- ML18082A710 + (10:37:02, 6 January 2025)
- ML18082A707 + (10:37:03, 6 January 2025)
- ML18082A706 + (10:37:04, 6 January 2025)
- ML18082A705 + (10:37:06, 6 January 2025)
- ML18082A704 + (10:37:06, 6 January 2025)
- ML18082A702 + (10:37:07, 6 January 2025)
- ML18082A701 + (10:37:08, 6 January 2025)
- 05000272/LER-1980-034-03, /03L-0:on 800604,150-33 Air Temp Instrument Failed.Caused by Temp Sensor Failure Over Extended Period of Time.Sensors Replaced & Will Be Replaced Annually + (10:37:10, 6 January 2025)
- 05000272/LER-1980-034, Forwards LER 80-034/03L-0 + (10:37:12, 6 January 2025)
- ML18082A696 + (10:37:13, 6 January 2025)
- 05000272/LER-1980-029-03, /03L-0:on 800601,during Normal operations,150- 33 Ft Air Temp Delta T Meteorological Instrument Failed. Caused by Electrical Lead Solder Connection Break After Repeated Use of Test Jack.Connection Repaired & Tested + (10:37:15, 6 January 2025)
- 05000272/LER-1980-029, Forwards LER 80-029/03L-0 + (10:37:17, 6 January 2025)
- ML18082A687 + (10:37:18, 6 January 2025)
- ML18082A684 + (10:37:20, 6 January 2025)
- ML18082A682 + (10:37:23, 6 January 2025)
- ML18082A681 + (10:37:24, 6 January 2025)
- ML18082A678 + (10:37:25, 6 January 2025)
- ML18082A677 + (10:37:26, 6 January 2025)
- ML18082A676 + (10:37:27, 6 January 2025)
- ML18082A674 + (10:37:28, 6 January 2025)
- ML18082A673 + (10:37:29, 6 January 2025)
- ML18082A671 + (10:37:29, 6 January 2025)
- ML18082A670 + (10:37:31, 6 January 2025)
- ML18082A669 + (10:37:32, 6 January 2025)
- ML18082A665 + (10:37:33, 6 January 2025)
- ML18082A664 + (10:37:35, 6 January 2025)
- ML18082A663 + (10:37:36, 6 January 2025)
- ML18082A657 + (10:37:38, 6 January 2025)
- ML18082A656 + (10:37:38, 6 January 2025)