JUN 2 4 198.0 Docket No.:

50-311 APPLICANT:

Public Service Electric and Gas Company FACILITY:

Salem Unit 2

SUBJECT:

SUMMARY

OF MEETING ON CONTROL ROD POSITION INDICATOR A meeting was held in Bethesda~ Maryland on June 10, 1980 with representatives of the licensee to discuss the control rod position indicator system.

The meeting w~s held at the request of the licensee to discuss a license amend-ment request related to the position indicator system.

The meeting attendees are listed in the enclosure. The meeting is summarized as follows; Summary The licensee stated that they could not meet Technical Specification 3.1.3.2.2 because the rod position indicator is not capable of being calibrated to the accuracy required during cold shutdown conditions. The licensee also stated that the accuracy of the calibration improves as the temperature increases because of the thermal characteristics of the position indicator system.

The original purpose of the specification was to ensure that the position of the control rods being moved was known, in order to preclude the remote possibility that the reactor inadvertently would be made critical.

Three possible solutions to the licensee 1s problem were discussed:

1) Eliminate T.S. 3.1.3.2.2 and the associated special test exceptions contained in T.S. 3.10.5,
2) Expand the special test exception (T.S. 3.10.5} to allow the movement of one control ba~k {with the rod position indicator inoperable) pro-vided that Keff ~.95,
3) Expand the control rod position indicator accuracy band from + :i,2 steps

+ 24 steps.

8007110554

Enclosure:

As stated cc: See next page NRC FORM 318 (9-76) NRCM 0240 J. K~~

Project Manager Licensing Branch 3 Division of Licensing

  • u.s. GOVERNMENT PRINTING OFFICE: 1979-289-369

9nrnG SU:\\MARY DISTRIBUTION Docket Fil~.

NRC POR

. *.=--*

Local POR TI.C NSIC Branch File.

H. Denton E. Ca'Se 0; Ei senhut R. Purnle*'

T. Novak S. Varga T. lppol ito R. A *. Clark R. Reid R. Tedesco J. Youngblood A. Schwencer Chief, Licensing Branch #3 J. R. Miller G. Lainas D. *Crutchfield Chief, Syste~ic Evaluation Progra~ Branch Chief, Ooerating Reactors Assessment Branch R. Vo 11 mer R. Bosnak

  • F. Schauer R. E. Jackson G. Lear V. Uoonan
s. Pawlicki V. Benaroya Z. Rosztoczy W. Haass D. Mu.11 er R. Ba*11ard W. *Regan.

J*. O; Sa 1 tzman

. D. Ross

.P. Check R. Satterfield

0. Pa"rr
  • F. Rosa.*

W. Butler W. Kreger

.R. W. Houston T. Murphy W. Gammil:'I L. Rubens te 1 n T. Soeis Chief, Core Performance Branch

  • J. S to 1 z S. Hanauer P. Collins D. Vassallo D. Ziemann

~. Mattson

. R. Schroeder

  • K. Knie 1 D. Skov ho 1't ri. KniQhton*
  • * "1.

Ern~:t R. B"er C *. Berlin~er S. Israel ACRS (16).

Attorney, nELD OIE' (3) 050 ( 7)

Project ~ariaoer J. Kerrigan Licensino Assista-nt J. Lee Receotionis t TER'.~

J. Le Dou x,

  • I H I&[ He!ldnu:3rte _

_!'.:..S

  • It.[: Region I./

l&E Reoion II I t.E. Region. I I.I I&E Re9ion IV l&E Region V

µ~c Particio~nts:

R. Woodruff ;... IE D. Vito - STSS/LGB A. Schwencer H. Li M. Dunenfeld J. Kerrigan bee:* Aopl°ica.nt.'.

~*

Service List

I 1"

I I i

j 1

  • I I

I.

.I I I I i *


~

JUN ~ 4 l9fill Docket No.:

50-311 APPLICANT:

Public Service Electric and Gas Company FACILITY:

Salem Unit 2 *

SUBJECT:

SUMMARY

OF MEETING.,ON CONTROL R_OD POSITION INDICATOR A meeting was.held in Bethesda, Maryland on June 10, 1980 with representatives..

of the licensee to discuss the control rod position indicator system. The meeting was held at the request of the licensee to discuss a license amend-ment request related to the position indicator system. The meeting attendees are listed fo the enclosure. The meeting 1S sumarized as follows:

SunJnary The licensee stated that they could not meet Technical Specification 3.1.3~2.2 because the rod pos1tfon indicator is not capable of being calibrated to the accuracy required during cold shutdown conditions. The licensee also stated.

that the accuracy of the ca11brat'ion improves as the temperature increases.

because of the thennal characteristics of the position indicator system. The original purpose of the specification was to ensure that the position. of *th.e control rods being moved was known, 1n order to preclude the remote possibility that the reactor inadvertently would be made critical.

Three possible solutions to the licensee's problem were discussed:

1) Eliminate T.S. 3.1.3.2*.2 and the associated special test exceptions contained in T.S. 3.10.5,
2) Expand the special test exception (T.S. 3.10.5) to allow the movement*

of one control bank (with the rod position indicator inoperable) pro-vided that Keff ~.95,

3) Expand the control rod position indicator accuracy band.from.:t_ i2 *steps

! 24 steps.

f,J *.

J. Ke?r~~* Project Manager.

Licensing Branch 3 Div1s1on of Licensing

Enclosure:

As stated cc: See next page N~C. FORM 318 (9*76) NRCM 0240

  • u.s. GOVERNMENT PRINTING OFFICE: 1979-289*369

I 1.*

" (

UNITED STATES NUCLEAR REGULATORY COMMiSSION WASHINGTON, D. C. 20666 JUN 2 4 1980 Dock.et No~: 50-31 l APPLICANT:

Public Service Electric and Gas Company FACILITY*:.

Salem Unit 2

SUBJECT:

SUMMARY

OF MEETING ON CONTROL ROD POSITION INDICATOR A meeting was held in Bethesda, Maryland on June 10, 1980 with representatives of the licensee to discuss the control rod position indicator system.

The meeting was held at the request of the licensee to discuss a license amend-ment request related to the position indicator system.

The meeting attendees are 1iste.d in the enclosure. The meeting is summarized as follows.

Summary The licensee stated that they could not meet Technical Specification 3.l.3.2.2 because the rod position indicator is not capable of being calibrated to the accuracy required during cold shutdown conditions. The licensee also stated that the accuracy of the calibration improves as the temperature increases because of the thermal characteristics of the position indicator system.

The original purpose of the specification was to ensure that the position of the control rods being moved was known, in order to preclude the remote possibility that the reactor inadvertently would be made critical.

Three possible solutions to the licensee's problem were discussed:

l) Eliminate T.S. 3~1.3.2.2 and the associated special test exceptions contatned in T.S. 3.10.5,

2) Expand the special test exception (T.S. 3.10.5) to allow the movement of one control bank (with the rod position indicator inoperable) pro-vided that Keff ~.95,
3) Expand the control rod

+ 24 steps.

Enclosure:

As stated cc:

See next page position indicator accuracy band from+ 12 steps

/

()

ltf~c,i--*

(j'_ Kerrigan,tf>roject Manager Licensing Branch 3.

Division of Licensing

Mr. R. L. Mittl, General Manager licensing & Environment Engineering & Construction Department Public Service Electric & Gas Company 80 Park.Place Newark, New Jersey 07101 cc: Richard Fryling, Jr., Esq.

Assistant General Counsel

  • Public Service Electric & Gas Company 80 Park Pl ace Newark, New Jersey 07100 Mark Wetterhahn, Esq.

Conner, Moore & Caber Suite 1050 1747 Pennsylvania Avenue, N. W.

Washington, D. c.

20006 Mr. Leif J. Norrholm c/o U. s. Nuclear Regulatory Conmission Region I, Drawer I Hancocks Bridge, New Jersey 08038

e II~,

, -i ENCLOSURE l ATTENDANCE LIST NAME TITLE AFFILIATION Janis Kerrigan Project Manager

  • NRG 1..'

Marvin Dunenfeld Reactor Physicist NRC Hulbert c*.. Li ICSB NRC John A. Nichols Reactor Engr.

PSE&G Elliot S. Rosenfeld Nuclear Fuel Cycle Engr.*

PSE&G John P. Ronafalvy Sr. Performance Suptd ( l&C)

PSE&G A. Schwencer NRC/DL NRC D. J. Vito STSS/LGB NRC Roger Woodruff IE NRC