ML18082A681

From kanterella
Jump to navigation Jump to search
Tech Spec Pages 3/4 7-5 Through 7-7 for Auxiliary Feedwater Sys & Auxiliary Feed Storage Tank.Related Documentation Encl
ML18082A681
Person / Time
Site: Salem  PSEG icon.png
Issue date: 06/27/1980
From:
Public Service Enterprise Group
To:
Shared Package
ML18082A679 List:
References
NUDOCS 8007070289
Download: ML18082A681 (8)


Text

l ATTACHMENT 1 PLANT SY3TEMS AUXIL!Af'Y FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three independent ste~m generator auxiliary feedwa1,er pumps and associated flow paths shall ce OPERABLE with:

a.

Two feedwater pumps, each ca1able of being powered from separate vital busses, and

b.

One feedwater pump capable o" being powered from an OPERABLE steam supply system.

APPLICABILITY:

MODES l, 2 and 3.

ACTION:

With onE auxiliary feedwater pump inoperable, restore at least three auxiliary feedwater pumps (two capable of being powered from separat~

vital busses and one capable of being powered by an OPERABLE steam supply ~ystem) to OPERABLE status within *72 hours or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.7.l.2 Each auxiliary feedwater pump shall be demonstrated OPERABL!::

a.

At least once per 31 days by:

l.

Verifying that the steam turbine driven pump develops a discharge pressure of > 1500 psig on recirculation fl~w when the secondary steam supply pressure is greater tnan 750 psig.

2.

Verifying that each valve (manual, power operated or automatic) in the flm>J :>crth that is not locked, sealej or otherwise secured in po.ition, is in its correct p~s iti on.

SALEM-UNIT 1 3/4 7-5 8 0 O 7' 0 7*02-B~

PLANT SYSTEMS SURVEILLANCE REQUUEMENTS (Continued)

b.

At least once per 18 months during shu\\.;down by:

1.

Verifying that each automatic valvt~ in the motor driven pump flow path actuates to its cor~ect position on a pum) discharge pressure test sign~!.

2.

Verifying that each motor driven p*1mp starts automati.cal ly upo1 receipt of each of the follu**,ing test signals:

a)

Loss of main feedwater pumps.

b)

Safeguards sequence signal.

c)

Steam Gen~rator Water Level -- Low-Low from one steam generator.

3.

Verifying that the steam turbine driven pump starts auto-matically upon receipt of each of the following test signals:

a)

Loss of offsite power.

b)

Steam Generator Water Level -- Low-Low from tw~

steam generators.

SALEM-UNIT 1 3/4 7-6 i...

I.*

PLANT SYSTEMS AUX I LIAR LIMITING 3.7.1.3 minimum APP LI CAB ACTION:

With the

a.
b.

~ FEED STORAGE TANK

ONDITION FOR OPERATION The auxiliary feed storage tank (AFST) shall be OPERABLE with a c0ntained volume of 200,000 gallons of water.

ILITY:

MODES 1, 2 and 3.

auxiliary feed storage tank incperable, within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> either:

Restore the AFST to OPERABLE status or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, or Demonstrate the OPERABILITY of a demineralized water or a fire protection/domestic water storage tank as a backup supply to the

- auxiliary feedwater pumps and restore the auxiliary feed storage tank to OPERABLE status within 7 days or be in HOT SHUTDOWi~

within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILU ;NCE REQUIREMENTS 4.7.1.3.

at least 1 The auxiliary feed storage ti*nk shall be demonstrated OPEk.L\\BLE once per* 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying the \\va ter 1eve1 is within its 1 imits w1 ien the tank is the supply sourte for the auxiliary feedwater pumps.

4.7.1.3.; ~

A demineralized water storag1~ tank shall be demonstrated OPERABLE at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying the tank contains

> 200,00 for taki1 0 gallons of water and by verifying proper alignment of valves ig suction from this tank when it is the supply source for t~e y feedwater pumps.

auxiliar 4.7.1.3.. 3 A fire protection/domestic water storage tank shall be demons tr. !ted OPERABLE at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying the tark

_::. 200,000 gallons of water and by verifying proper alignmen~ of Jr taking suction from this tan~ when it is the supply source auxiliary, feedwater pumps.

contains valves f for the SALEM-UN IT 1 3/4 7-7

e*

PLANT SYSTEMS AUXILIARY FEEDW~TER SYSTEM LIMITING CONDIT:ON FOR OPERATION 3.7. 1.2 At lea~,t three independent steam gererator auxiliary feedwater punps and associatec flow paths shall be OPERABLE ~ith:

a.

Two f~edwater pumps, each capable uf being powered from separate vital busses, and

b.

One fr!edwater pump capable of bein~ powered from an OPERABLE steam supp1y system.

APPLICABILITY:

MODES 1, 2 and 3.

-ACTION:

With one auxiliary feedwater pump inoperable. restore at least three auxiliary feedwater pumps (two capable of being powered from separat~ vital busses c,nd one capable of heing powered by an OPERABLE steam supply system) to OPERA8LE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REW

...__I_R_EM_E_N_TS ___________________ _

  • 4. 7.*l. 2 Each auxi 1 i ary feedwater *pump sha ~ : be demonstrated OPERABLE:
a.

At least once per 31 days by:

1.

Verifying that each motor dri1en pump develops a discharge J pressure of greater than or e~ual to 1275 psig on recirculition flow.

2.

3..

SALEM - UNIT 2 Verifying that the steam turLine driven pump develops a discharge pressure of greater than. or equal to 1500 psig on recirculation flow when the secondary stea~ supply pressure is greater than J 750 psig.

The provisions of Specification 4.0.4 are not applicable.

Verifying that each non-autowatic valve in the flow path that is not locked, sealed or othe~wise secured in position, is in its correct position.

3/4 7-5

.
;~

]

PLANT SYSTEMS SURVEILLANCE REQ~*:REMENTS (Continued)

4.

Verifying that each automatic a 1 ve in the fl ow path actuate~

]

tc its correct position wheneve" the auxiliary feedwater system is placed in automatic control c1r when above 10% RATED THERM! L POwER.

b.

At least once per 18 months during s~utdown by:

1.

Ve*~ifying that each automatic v;1lve in the motor driven pump fl1w path actuates to its corrert position on a pump discharre pressure test signal.

2.

Verifying that each motor drive*1 pump starts automatically ur.on r.!ceipt of each of the fol lowin~1 test signals:

a)

Loss of main feedwater pumr*s.

b)

Safeguards sequence signal.

c)

Steam Generator Water Leve~ -- Low-Low from one steam generator.

3.

Verifying that the steam turbine driven pump starts automatically upon receipt of each of the following test signals:

a)

Loss of offsite power.

b)

Steam Generator-Water Le\\~l -- Low-Low* from two steam generators.

SALEM - UNIT 2 3/4 7-6

r PLANT SYSTEMS AUXILIARY FEED STORA(iE TANK LIMITING CONDITION IOR OPERATION

~~~~~~~~~~~~~~

3.7. 1.3 The auxiliary feed storage tank (AFST) shall be OPERABLE with a minimum contained volume of 200,000 gallons of wat2r.

APPLICABILITY:

MODE5 1, 2 and 3.

ACTION:

With the auxiliary feed storage tank inoperable, within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> either:

a.

Restore the AFST to OPERABLE status or r2 in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, or

b.

Demonstrate the OPERABILITY of a demine~?lized water or a fire protectior/domestic water storage tank a5 a backup supply to the auxiliary feedwater pumps and restore th~ auxiliary feed storage

'tank to OPERABLE status within 7 days or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIRFMENTS 4.7. l.3. 1 The aux1 iary feed storage tank shall b~ demonstrated OPERABLE at least once per 12 h.iurs by verifying the water level is within its limits when the tank is the supply source for the auxiliary feedwater pumps.

4.7. 1.3.2 A demine*alized water storage tank shall be demonstrated OPERABLE at least once per 1 ~ hours by verifying the tank cJntains greater than or equal to 200,000 gallons of water and by verifying proper alignment of valves for taking suction *from this tank when it is the supply source for the auxiliary feedwater pumps.

4.7. 1.3.3 A fire p~otection/dornestic water storage tank shall be demonstrated OPERABLE at least 0'1Ce per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying the tank contains greater than or equal to 200,000 gallons of water and by verifying proper alignment of valves for taking suction from this tank when it is the supply source for the auxiliary feedwater pumps.

4.7. 1.3.4 The Service Water System shall be demor~trated capable of providing

]

a water supply to the Auxiliary Feedwater System -t least once per 12 months by verifying that the required spool-piece is on-fite.

SALEM - UNIT 2

. 3/4 7-7

ATTACHMENT 2 ENVIRONMENTAL QUALIFICATIONS OF SAFETY-RELATED ELECTRICAL/CONTROLS EQUIPMENT PSE&G SUBMITTALS FOR ENVIRONMENTAL QUALIFICATION

1.

Letter, Mr. R. L. Mittl, PSE&G to MR. Olan D. Parr, NRC, dated 10/20/78 - submittal of listing of qualification documentation (FSAR Q7.35).

2.

Letter, Mr. R. L. Mittl, PSE&G to Mr. Olan D. Parr, NRC, dated 11/20/78 - submittal of main steam line break analysis (FSAR Q5.82).

3.

Letter, Mr. R. L. Mittl, PSE&G to Mr. Olan D. Parr, NRC, dated 1/4/79 -

information on valve limit switches

{FSAR Q7.35).

4.

Letter, Mr. R. L. Mittl, PSE&G to Mr. Olan D. Parr, NRC, dated 3/6/79 - submittal of information on the following:

Qualification temperature, Barton transmitters, Rosemount transmitters, solenoid valves, limit switches, instrument panels/electrical connections (FSAR Q7.41), test reports for solenoid valves and limit switches.

5.

Letter, Mr. R. L. Mittl, PSE&G to Mr. Olan D. Parr, NRC, dated 3/16/79 -

submittal of information on terminal blocks, cables, motor-operated valves, fan cooler motors (SER Open Item 8.4.8).

6.

Letter, Mr. R. L. Mittl, PSE&G to Mr. Olan D. Parr, NRC, dated 3/30/79 -

submittal of revised listing of qualification documentation (FSAR Q7.30), information on fan cooler motors (SER Open Item 8.4.8).

7.

Letter, Mr. R. L. Mittl, PSE&G to Mr. Olan D. Parr, NRC, dated 4/12/79 - submittal of test reports for solenoid valves and instrument panels.

8.

Letter, Mr. R. L. Mittl, PSE&G to Mr. Olan D. Parr, NRC, dated 7/17/79 - submittal of test report for terminal blocks/enclosures.

9.

Letter, Mr. R. L. Mittl, PSE&G to Mr. Olan D. Parr, NRC, dated 8/7/79 - submittal of test report for American Insulated Wire cable.

M P80 64 09/12

  • }

.Ji 10.

Letter, Mr. R. L. Mittl, PSE&G to Mr. Olan D. Parr, NRC, dated 8/28/79 -

submittal of revised listing of qualification documentation (FSAR Q7.30).

11.

Letter, Mr. R. L. Mittl, PSE&G to Mr. Olan D. Parr, NRC, dated 10/23/79 -

submittal of additional information on instrument panel testing, Barton transmitters, solenoid valves, electrical connections.

11.

Letter, Mr. R. L. Mittl, PSE&G to Mr. Olan D. Parr, NRC, dated 5/22/80 - submittal of new summary listing of qualification documentation, information on Rosemount RTDs and Barton containment pressure transmitters.

PSE&G Submittals for NRC Bulletin 79-0lB

1.

March 7, 1980

- submittal of forms describing equipment/systems required to operate to mitigate an accident and/or shutdown the plant and evaluation forms concerning the qualification data for such equipment and systems (partial).

2.

March 21, 1980 - submittal of additional forms listing equipment required to function under postulated accident conditions.

3.

April 14, 1980 - submittal of evaluation forms concerning qualification data for steam generator instrumentation (partial).

4

  • June 4, 1980 M P80 64 09/13

- submittal of evaluation forms concerning qualification data for containment isolation system equipment (partial).