Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18082B381 + (10:29:03, 6 January 2025)
- ML18082B380 + (10:29:03, 6 January 2025)
- ML18082B379 + (10:29:04, 6 January 2025)
- ML18082B377 + (10:29:05, 6 January 2025)
- ML18082B378 + (10:29:05, 6 January 2025)
- ML18082B376 + (10:29:06, 6 January 2025)
- ND-18-0364, Supplement to Request for License Amendment: Technical Specification Updates for Reactivity Controls and Other Miscellaneous Changes (LAR-17-024S2) + (10:29:07, 6 January 2025)
- ML18082B375 + (10:29:07, 6 January 2025)
- ND-18-0097, Supplement to Request for License Amendment and Exemption Regarding Ventilation System Charges (LAR-16-030R1S1) + (10:29:08, 6 January 2025)
- IR 05000237/2018410 + (10:29:09, 6 January 2025)
- 05000272/LER-1980-052-03, /03L-0:on 800910,record Review Prior to Reactor Startup Revealed Required Inservice Insp Surveillance of Valves Had Not Been Completed During Previous Reactor Shutdown.Caused by Improper Surveillance Scheduling + (10:29:11, 6 January 2025)
- 05000272/LER-1980-052, Forwards LER 80-052/03L-0 + (10:29:13, 6 January 2025)
- ML18082B341 + (10:29:14, 6 January 2025)
- ML18082B343 + (10:29:14, 6 January 2025)
- ML18082B340 + (10:29:16, 6 January 2025)
- ML18082B337 + (10:29:16, 6 January 2025)
- ML18082B333 + (10:29:20, 6 January 2025)
- ML18082B332 + (10:29:21, 6 January 2025)
- ML18082B331 + (10:29:22, 6 January 2025)
- 05000311/LER-1980-030-03, /03L-0:on 800907,during Cold Shutdown,Both Safety Injection Pumps Were Made Operable at Same Time.Caused by Supervisor Error.Supervisor Counseled + (10:29:24, 6 January 2025)
- 05000311/LER-1980-030, Forwards LER 80-030/03L-0 + (10:29:25, 6 January 2025)
- 05000272/LER-1980-050-03, /03L-0:on 800908 Discovered Failed Air Particulate Detector in Reactor Coolant Leak Detection Sys.Caused by Cracked Sodium Iodide Crystal.Detector Replaced & Satisfactorily Tested + (10:29:27, 6 January 2025)
- 05000272/LER-1980-050, Forwards LER 80-050/03L-0 + (10:29:29, 6 January 2025)
- ML18082B323 + (10:29:30, 6 January 2025)
- IR 05000272/1980014 + (10:29:32, 6 January 2025)
- NRC-2018-0003, NRC-2018-000466 - Request for Documents Related to Holtec License Application for Cis Facility in Lea County, New Mexico (in Relation to NRC-2018-000331) + (10:29:33, 6 January 2025)
- ML18082B313 + (10:29:36, 6 January 2025)
- ML18082B312 + (10:29:37, 6 January 2025)
- ML18082B310 + (10:29:38, 6 January 2025)
- ML18082B311 + (10:29:38, 6 January 2025)
- ML18082B308 + (10:29:39, 6 January 2025)
- ML18082B300 + (10:29:40, 6 January 2025)
- PNO-I-80-110A, on 800725,IBEW Strike Has Been Settled & Picket Lines at Corporate Ofc Have Been Withdrawn.Phone Cables Will Be Repaired as Soon as Picket Lines at Plant Site Are Withdrawn + (10:29:42, 6 January 2025)
- ML18082B295 + (10:29:42, 6 January 2025)
- ML18082B294 + (10:29:43, 6 January 2025)
- 05000272/LER-1980-049-03, /03L-0:on 800830,during Normal Operation,Leak Discovered in Svc Water Supply to Centrifugal Charging Pump 12 Lube Oil Cooler.Caused by Corrosion at T Fitting in Piping.Fitting Replaced & Pump Returned to Svc + (10:29:44, 6 January 2025)
- 05000272/LER-1980-049, Forwards LER 80-049/03L-0 + (10:29:46, 6 January 2025)
- 05000272/LER-1980-048-03, /03L-0:on 800830,during Power Coastdown Near End of Fuel Cycle,Quadrant Power Tilt Ratio Was 1.03,exceeding Tech Spec Limits.Caused by Instrument Drift & Power Tilts + (10:29:48, 6 January 2025)
- ML18082B289 + (10:29:49, 6 January 2025)
- 05000272/LER-1980-048, Forwards LER 80-048/03L-0 + (10:29:50, 6 January 2025)
- 05000272/LER-1980-041-03, /03X-1:on 800708,during Normal Operation Safety Injection Pump 11 Declared Inoperable Because of Water Mixed W/Lubricating Oils.Caused by Cooler Tube Failure.Tube Plugged & Tested Satisfactorily + (10:29:55, 6 January 2025)
- ML18082B285 + (10:29:56, 6 January 2025)
- IR 05000456/2018410 + (10:29:57, 6 January 2025)
- 05000272/LER-1980-041, Forwards LER 80-041/03X-1 + (10:29:59, 6 January 2025)
- ML18082B278 + (10:30:00, 6 January 2025)
- 05000311/LER-1980-029-03, /03L-0:on 800830,during Cooldown,Channel I Pressurizer Overpressure Protection Sys Relief Valve Failed to Open.Caused by Faulty Open Limit Switch on Relief Valve. Sys Depressurized & Vented.Limit Switch Replaced + (10:30:01, 6 January 2025)
- 05000311/LER-1980-029, Forwards LER 80-029/03L-0 + (10:30:03, 6 January 2025)
- ML18082B273 + (10:30:05, 6 January 2025)
- ML18082B272 + (10:30:06, 6 January 2025)
- 05000272/LER-1980-047-03, /03L-0:on 800829,QC Inspector Discovered Fire Barrier Open Between Units 1 & 2 W/No Fire Watch Established.Caused by Contractor Error.Warning Sign to Be Installed & Training Improved + (10:30:07, 6 January 2025)
- 05000272/LER-1980-047, Forwards LER 80-047/03L-0 + (10:30:09, 6 January 2025)