Notice of Violation from Insp on 800618-20
ML18082B312
Person / Time
Site: Salem  PSEG icon.png
Issue date: 07/11/1980
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML18082B309 List:
References
50-272-80-14, NUDOCS 8010100069
Download: ML18082B312 (1)


Text

.APPENDIX A NOTICE OF VIOLATION Public Service Electric and Gas Company.

Docket No. 50-272

  • eased on the results of an NRC inspection conducted on June 18-20, 1980, it appears that two of your activitfes were not conducted in full compliance with conditions of your NRC Facility License, DPR-70, as indicated below.
l.

10 CFR 55, Appendix A, Requal ifi cation Programs for Licensed Operators of Production and Utilization Facilities, states,. in part,

. u3.

On-the-job training.

The requalification program shall include on-the-job training so that:

11 "3c. Each licensed operator and senior operattlr is cog-

. ni zant of facility design changes...

11 Contrary to the above, no evidence was found that all licensed operators and senior operators review facility design changes nor is there a system in place to insure these reviews occur.

This item is an infraction.

2.

Salem Generating Station Training Procedure 10, Revision 2, 11NRC Licensed Oper~tor Requalification Program 11

, paragraph IV requires an individual

  • training folder maintained for each licensed operator and senior operator.

These folders shall contain, in par~, records of simulator training received~ The 12 October 1979 letter from Mr. H. J. Midura to Mr. Paul Collins of Operator Licensing Branch, NRC, indicated that simulator training would still be required as part of the Unit 1 modified requalifi-cation program.

Contrary to the above, no record of simulator training, other than reactiv-ity manipulations, was* found in the records of either the three licensed operators or the four senior operators reviewed.

This item is a deficiency.

80101000 (p'f