ML18082B311
| ML18082B311 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 07/29/1980 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Schneider F Public Service Enterprise Group |
| Shared Package | |
| ML18082B309 | List: |
| References | |
| NUDOCS 8010100065 | |
| Download: ML18082B311 (2) | |
See also: IR 05000272/1980014
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
631 PARK AVENUE
KING OF PRUSSIA, PENNSYLVANIA 19406
ocket Nos. 50-272
50-311
'JUL 2 ! f980
Public Service Electric and Gas Company
ATTN:
Mr. F. W. Schneider
Vice President - Production
80 Park Place
Newark, New Jersey 07101 *
Gentlemen:
Subject:
Combined Inspection Nos. 50-272/80-14 and 50-311/80-10
This refers to th~ routine inspection conducted by Dr. Lee H. Bettenhausen of
this office on June 18-20, 1980, at Salem Generating Station and other company
locations of activities authorized by NRC License Nos. DPR-70 and DPR-75 and to
the discussions of our findings held by Dr. Bettenhausen with Mr. H. Midura and
other members of your staff at the conclusion of the inspection, and to a subse-
quent telephone discussion between Dr. Bettenhausen and Mr. J. Zupko on July 18,
1980.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that certain of your activi-
ties were not conducted in full compliance with NRC requirements, as set forth
in the Notice of Violation, enclosed herewith as Appendix A.
These items of
noncompliance have been categorized into the levels as described in our corres-
pondence to you dated December 31, 1974.
This notice is sent to you pursuant
to the provisions of Section 2.201 of the NRC's Rules of Practice," Part 2,
Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to
this office, within twenty (20) days of your receipt of this notice, a written
statement or explanation in reply including:
(1) corrective steps which have
been taken by you and the results achieved; (2) corrective steps which will be
taken to avoid further items of noncompliance; and (3) the date when full com-
pliance will be achieved.
Item* number 2 (272/80-14-02), shown in the Notice of Violation enclosed with
this letter, is a recurrent or uncorrected item.
In your response please give
this matter your particular attention.
.
.
In accordance with Section 2.790 of the NRC's "Rules of Practice,
11 Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosures
so 101 ooo~s *
-- -
- - - *-
_______
- _-_-* _----_* *_* __
*- ---**::::_***:._***:._***_-**_* ____
-_** -_-*_*---~~---*_--_---------------------
. Public Service Electric and
Gas Company
2
'JUl 2 9 t980
will be placed in the NRC
1 s Public Document Room.
If this report contains any
information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written app 1 i cation within 20 days to this /office to
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section 2.790.
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room-.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Enclosures:
1.
Appendix A, Notice of Violation
Sincerely,
~~
El
J. Brunner, Chief
Re
tor Operations and Nuclear
Support Branch
2.
Office of Inspection and Enforcement
Inspection Report Nos. 50-272/80-14
and 50-311/80-10
cc w/encl:
F. P. Librizzi, General Manag~r - Electric Production
E. N. Schwalje, Manager - Quality Assurance
R. L. Mittl, General Manager - Licensing and Environment
H. J. Midura, Manager - Salem Generating Station