Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18100A931 + (06:40:58, 6 January 2025)
- ML18100A930 + (06:41:00, 6 January 2025)
- ML18100A929 + (06:41:01, 6 January 2025)
- ML18100A928 + (06:41:02, 6 January 2025)
- ML18100A924 + (06:41:03, 6 January 2025)
- ML18100A923 + (06:41:04, 6 January 2025)
- ML18100A922 + (06:41:05, 6 January 2025)
- ML18100A919 + (06:41:06, 6 January 2025)
- 05000272/LER-1994-004, :on 940131,intentional TS 3.0.3 Entry Made Due to Deenergizing Analog Rod Position Indication (Arpi).Signal Conditioning Module 2SA4 Adjusted & Channel Check Performed to Demonstrate Arpi Operability + (06:41:08, 6 January 2025)
- CNL-18-049, Clinch River Nuclear Site, Response to NRC Request for Additional Information 12 in Support of Early Site Permit Application for Clinch River Nuclear Site + (06:41:09, 6 January 2025)
- ML18100A915 + (06:41:10, 6 January 2025)
- 05000272/LER-1994-003, :on 940127,reactor Trip Occurred on SG 14 Low Low Level.Caused by Equipment Failure of Circuit Cards in 14BF19/40 Controller.Circuit Cards Replaced & Controller Returned to Svc + (06:41:12, 6 January 2025)
- IR 05000272/1993029 + (06:41:15, 6 January 2025)
- ML18100A908 + (06:41:16, 6 January 2025)
- ML18100A906 + (06:41:17, 6 January 2025)
- ML18100A904 + (06:41:18, 6 January 2025)
- ML18100A901 + (06:41:19, 6 January 2025)
- TAC:M87957 + (06:41:20, 6 January 2025)
- ML18100A900 + (06:41:23, 6 January 2025)
- 05000311/LER-1994-001-01, :on 940115,TS 3.0.3 Entries Occurred Due to Deenergizing Analog Rod Position Indication Sys for All Control Rods.Module 2SB4 & Span of Module Adjusted,Channel Check Performed & TS 3.0.3 Exited + (06:41:56, 6 January 2025)
- ML18100A898 + (06:42:01, 6 January 2025)
- ML18100A896 + (06:42:04, 6 January 2025)
- ML18100A895 + (06:42:06, 6 January 2025)
- ML18100A894 + (06:42:08, 6 January 2025)
- ML18100A893 + (06:42:09, 6 January 2025)
- ML18100A892 + (06:42:11, 6 January 2025)
- ML18100A890 + (06:42:13, 6 January 2025)
- 05000311/LER-1994-002-01, :on 940119,determined That Unit May Have Operated Above 3,411 MW Specified in OL Condition 2.C.(1). Administrative Controls Implemented to Power to 95% by Calorimetric + (06:42:43, 6 January 2025)
- 05000272/LER-1994-002, :on 940121,reactor Manually Tripped Due to Less than Required Operable CR Demand Position Indicators.Caused by Improper Assembly of Step Counter Lcd Display Module. Failed Counter Replaced W/Spare + (06:42:50, 6 January 2025)
- IR 05000272/1993027 + (06:43:00, 6 January 2025)
- ML18100A886 + (06:43:02, 6 January 2025)
- ML18100A885 + (06:43:04, 6 January 2025)
- ML18100A883 + (06:43:06, 6 January 2025)
- ML18100A881 + (06:43:08, 6 January 2025)
- ML18100A880 + (06:43:09, 6 January 2025)
- 05000272/LER-1994-001, :on 940105,discovered More than One Inoperable Apri Per Bank.Caused by Design Error.Position Indicators Calibrated & TS 3.0.3 Exited + (06:43:41, 6 January 2025)
- ML18100A876 + (06:43:45, 6 January 2025)
- ML18100A874 + (06:43:48, 6 January 2025)
- ML18100A871 + (06:43:49, 6 January 2025)
- ML18100A868 + (06:43:51, 6 January 2025)
- ML18100A867 + (06:43:52, 6 January 2025)
- TAC:M77374 + (06:43:55, 6 January 2025)
- ML18100A865 + (06:44:01, 6 January 2025)
- ML18100A863 + (06:44:03, 6 January 2025)
- ML18100A862 + (06:44:04, 6 January 2025)
- ML18100A861 + (06:44:05, 6 January 2025)
- ML18100A858 + (06:44:09, 6 January 2025)
- ML18100A855 + (06:44:11, 6 January 2025)
- ML18100A854 + (06:44:13, 6 January 2025)
- 05000272/LER-1993-020, :on 931223,RCS Accumulator Upper Range Level Indication Inaccuracies Affecting Units 1 & 2 Identified. Caused by Use of Incorrect Original Scaling Factors. Accumulators on Both Units Correctly Rescaled + (06:44:38, 6 January 2025)
- ML18100A850 + (06:44:42, 6 January 2025)