Docket Nos. 50-272
50-311
50-354
Mi. Steven E. Miltenberger
Vice President and Chief Nuclear Officer
Public Service Electric and Gas Company
P.O. Box 236
Hancocks Bridge, NJ 08038
Dear Mr. Miltenberger:
SUBJECT:
SALEM AND HOPE CREEK RESIDENT INSPECTION NOS. 50-272/93-27;
50-311/93-27; 50-354/93-27
The enclosed report documents an inspection to assure public health and safety, conducted by
Mr. C. Marschall, Senior Resident Inspector and other members of the NRC resident and
regional staff at the Salem and Hope Creek Nuclear Generating Stations for the period
between November 27, 1993 and January 15, 1994. The inspectors discussed the findings of
this inspection with Messrs. C. Vondra and R. Hovey of your staff .
Based on the results of this inspection, it appears that one of your activities was not
conducted in full compliance with NRC requirements, as set forth in the attached Notice of
Violation. In accordance with 10 CFR 2. 790 of the NRC's "Rules of Practice", a copy of
this letter and its enclosures will be placed in the NRC Public Document Room. The
responses directed by this letter and the enclosed Notice are not subject to the clearance
procedures of the Office of Management and Budget as required by the Paperwork Reduction
Act of 1980, Public Law No. 96.511.
The violation, involving failure to adequately control trouble-shooting and corrective action
for residual heat removal check valve leakage, appears to be an additional example of the
work control problems previously documented in NRC Inspection Report 50-272/93-23, 50-
311/93-23, and 50-354/93-25. We are concerned that the inadequate control of work
activities has the potential to significantly affect worker safety and the ability to maintain the
plant in a configuration that is within the design basis assumed in the Safety Analysis Report.
We consider that prompt management attention for this concern is warranted to assure timely
corrective action.
18006S
..
940222oooco6~ 6i~&B72
. PDR
A
Q
__ ..... '.
FEB I 0 199'1
Mr. Steven E. Miltenberger
2
Your cooperation with us is appreciated.
Sincerely,
oiJ:-I g foal:-s ig-~;;a-Br!-.
Enclosures:
1.
Appendix A, Notice of Violation
- C11f.:'ord .i. 1A:~de*1*son
Edward C. Wenzinger, Chief
Projects Branch No. 2
Division of Reactor Projects
2.
NRC Inspection Report Nos. 50-272/93-27; 50-311/93-27; 50-354/93-27
cc.w/encl:
S. La.Bruna, Vice President, Engineering and Plant Betterment
- J. Hagan, Vice President, Operations/General Manager - Salem Operations
R. Hovey, General Manager - Hope Creek Operations
C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
F. Thomson, Manager, Licensing and Regulation
J. Robb, Director, Joint Owner Affairs
A. Tapert, Program Administrator
R. Swanson, General Manager, QA and Nuclear Safety Review
M. Wetterhahn, Esquire
R. Fryling, Jr., Esquire
P. J. Curham, Manager, Joint Generation Department, Atlantic Electric Company
Consumer Advocate, Office of Consumer Advocate
William Conklin, Public Safety Consultant, Lower Alloways Creek Township
K. Abraham, PAO (2)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
Mr. Steven E. Miltenberger
bee w/encls:
FEB I 0 1994
3
Region I Docket Room (with concurrences)
J. Stone, NRR
S. Dembek, NRR
v. Mccree, OEDO
C. Miller, PDI-2, NRR
M. Shannon, ILPB
o+/- ~I
E. C. Wenzinger
~1194
-z.. /1:/94
OFFICIAL RECORD COPY