Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18139A725 + (02:19:07, 6 January 2025)
- 05000281/LER-1980-011-01, /01T-0:on 800819,at 12% Power,Steam Flow Transmitters (FI-474,475,484,485,494 & 495) Isolated Contrary to Tech Spec-3.7.B.Caused by Transmitters Being Isolated Following Containment Integrated Leak Rate Test + (02:19:08, 6 January 2025)
- 05000281/LER-1980-011, Forwards LER 80-011/01T-0 + (02:19:10, 6 January 2025)
- IR 05000280/1980010 + (02:19:47, 6 January 2025)
- ML18139A719 + (02:19:49, 6 January 2025)
- ML18139A717 + (02:19:50, 6 January 2025)
- ML18139A715 + (02:19:51, 6 January 2025)
- 05000280/LER-1980-040-03, /03L-0:on 800731,in Steady State Operation, Found That Primary to Secondary Leakage Through 1C Steam Generator Was 0.33 Gpm.Caused by Primary to Secondary Leakage Through Four Steam Generator Tubes + (02:19:53, 6 January 2025)
- 05000280/LER-1980-040, Forwards LER 80-040/03L-0 + (02:19:55, 6 January 2025)
- ML18139A705 + (02:19:57, 6 January 2025)
- ML18139A704 + (02:19:57, 6 January 2025)
- ML18139A702 + (02:19:58, 6 January 2025)
- 05000280/LER-1980-058-01, /01T-0:on 800819,w/unit at 90%,refueling Water Storage Tank Vol Found Different than Assumed in 780629 Order for Mod.Caused by Failure to Specify Number of Available Gallons in Order.Correct Vol Calculated + (02:19:59, 6 January 2025)
- 05000280/LER-1980-058, Forwards LER 80-058/01T-0 + (02:20:01, 6 January 2025)
- ML18139A697 + (02:20:02, 6 January 2025)
- IR 05000280/1980023 + (02:20:04, 6 January 2025)
- ML18139A695 + (02:20:05, 6 January 2025)
- ML18139A693 + (02:20:06, 6 January 2025)
- 05000281/LER-1979-008-03, During Surveillance Check,Found Deterioration of Piping on Low Portion of Recirculation Spray Subsystems.Caused by Chloride Stress Corrosion.Piping Replaced W/Nonsensitized Piping + (02:20:08, 6 January 2025)
- 05000281/LER-1979-008, Forwards Updated LER 79-008/03X-1 + (02:20:09, 6 January 2025)
- ML18139A689 + (02:20:10, 6 January 2025)
- IR 05000280/1980019 + (02:20:12, 6 January 2025)
- ML18139A687 + (02:20:13, 6 January 2025)
- ML18139A686 + (02:20:14, 6 January 2025)
- ML18139A685 + (02:20:15, 6 January 2025)
- ML18139A683 + (02:20:16, 6 January 2025)
- IR 05000281/1980020 + (02:20:17, 6 January 2025)
- ML18139A681 + (02:20:19, 6 January 2025)
- ML18139A679 + (02:20:20, 6 January 2025)
- ML18139A680 + (02:20:20, 6 January 2025)
- ML18139A677 + (02:20:21, 6 January 2025)
- ML18139A676 + (02:20:22, 6 January 2025)
- IR 05000280/1980028 + (02:20:23, 6 January 2025)
- 05000280/LER-1980-049-03, /03L-0:on 800722,at 100% power,PT-27D Revealed Amp Readings for Circuit 13A Boron Injection Recirculation to Boric Acid Tanks Panels 8 & 9 Below PT Acceptance Criteria.Caused by Heat Tracing Tape Failure + (02:20:26, 6 January 2025)
- ML18139A671 + (02:20:27, 6 January 2025)
- ML18139A670 + (02:20:27, 6 January 2025)
- ML18139A669 + (02:20:28, 6 January 2025)
- 05000280/LER-1980-048-03, /03L-0:on 800721,w/unit at 100% Power, Investigation Revealed That Amp Readings for Circuit 22A Boron Injection Tank Inlet Panels 1 & 2 Were Below Tech Specs.Caused by Excess Amount of Heat Tracing Tape + (02:20:30, 6 January 2025)
- 05000280/LER-1980-048, Forwards LER 80-048/03L-0 + (02:20:32, 6 January 2025)
- ML18139A665 + (02:20:33, 6 January 2025)
- 05000280/LER-1980-047, Forwards LER 80-047/03L-0 + (02:20:35, 6 January 2025)
- ML18139A657 + (02:20:36, 6 January 2025)
- ML18139A656 + (02:20:37, 6 January 2025)
- ML18139A654 + (02:20:38, 6 January 2025)
- ML18139A653 + (02:20:38, 6 January 2025)
- ML18139A652 + (02:20:40, 6 January 2025)
- ML18139A651 + (02:20:41, 6 January 2025)
- ML18139A649 + (02:20:43, 6 January 2025)
- ML18139A650 + (02:20:43, 6 January 2025)
- ML18139A648 + (02:20:44, 6 January 2025)
- ML18139A647 + (02:20:46, 6 January 2025)