Forwards IE Insp Repts 50-280/80-23 & 50-281/80-26 on 800609-0703 & Notice of Violation
ML18139A693
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/08/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18139A694 List:
References
NUDOCS 8009020209
Download: ML18139A693 (2)


See also: IR 05000280/1980023

Text

In Reply Refer To:

Ril..;J)JB1

~jAf0-23

S0-281/80-26

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

AUG O 8 1980

Virginia Electric and Power Company

ATTN: J. H. Ferguson

Executive Vice President-Power

P. 0. Box 26666

Richmond, VA 23261

Gentlemen:

This refers to the inspection conducted by D. J. Burke of this office on June 9

through July 3, 1980 of activities authorized by NRC Operating License Nos.

DPR-32 and DPR-37 for the Surry facility, and to the discussion of our findings

held with J. L. Wilson at the conclusion of the inspection.

Areas examined. during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters.

These are discussed in the enclosed inspection report.

One item of noncompliance has been withdrawn.

During the inspection, it was found that certain activities under your license

appear to be in. noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

______ a=s~A.,,p~enrlix A.

This notj ce j s sent to you pur-suant-~-the-p.r~~------

2. 201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions.

Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the :'

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Virginia Electric and Power Company

-2-

AUG O B 1980

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Enclosures:

Sincerely,

K. C . ./

-. - )

. R. C. ~ng Chief

Reactor Operations and Nuclear

Support Branch

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-280/80-23

and 50-281/80-26

cc w/encl:

J. L. Wilson, Manager