APPENDIX A NOTICE OF VIOLATION Virginia Electric and Power Company Surry Unit 2 License No. DPR-37 Based on the NRC inspection May 5-8, 1980, certain of your activities were apparently not conducted in full compliance with NRC requirements as indicated below.
These items have been categorized as described in correspondence to you dated December 31, 1974.
As required by Technical Specifications 6.4.A.7 and 6.4.D, de~ailed written procedures with appropriate check-off lists and instructions shall be provided and followed for preventive or corrective maintenance operations which would have an effect on the safety of the reactor.
Contrary to the above, the "A" reactor coolant loop hydrostatic test proce-dure (DC 50006-P-4-U2A) performed on January 30, 1980 did not:
- a.
Specify the position of all boundary valves associated with the test.
- b.
- c.
Incorporate field changes discovered during the "B" and "C" hydrostatic tests though the action specified by the field changes was taken.
Specifically identify removal of all procedure installed test equipment.
- d.
Satisfactorily review that the alpha-numeric valve designators applied to the valve descriptions.
This is an infraction.