Forwards IE Insp Rept 50-281/80-20 on 800505-08 & Notice of Violation
ML18139A680
Person / Time
Site: Surry Dominion icon.png
Issue date: 05/30/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18139A678 List:
References
NUDOCS 8008280073
Download: ML18139A680 (2)


See also: IR 05000281/1980020

Text

, . .;

,...

~

===~---=---~-=--------------- -- **-* - ----

--- ------~---- ,~- ____ , *-----

In Reply Refer To:

-RII:RCS

50-281/80-20

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

MAY 3 O 1980

Virginia Electric and Power Company

ATTN:

J. H. Ferguson

Executive Vice President-Power

P. 0. Box 26666

Richmond, VA

23261

Gentlemen:

I:\\

This refers to the inspection conducted by R. C. Sauer of this office on May 5-8,

1980 of activities authorized by NRC License No. DPR-37 for the Surry facility,

and to the discussion of our findings held with J. L. Wilson at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

,During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements.

This item and references

to pertinent requirements are listed in the Notice of Violation enclosed here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2. 201 of the NRc** s "Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Section:2.201 requires you to submit to this office, within 20

days of your receipt of this notice, a written statement or explanation in reply

including:

(1) corrective steps which have been taken by you and the results

achieved; (2) corrective steps which will be taken to avoid further noncompli-

ance;_and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

_ the specified period, the report will be placed in the Public Document Room.

-~8008280073

r ----*-*-------*"'* --

--* ------- ---- ~*-----_, --___ .....,_~--*-*--*~------------ ~-*--* ---*---*** -- -*---*-* -- -*

Virginia Electric and Power Company

-2-

MAY 3 0 1980

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Enclosures:

Sincerely,

$~C., }

R. C. ~ting Chief

Reactor Operations and

Nuclear Support Branch

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-281/80-20

cc w/encl:

J. L. Wilson, Manager

P. 0. Box 315

Surry, VA

23883

., .