Text

'

,,. ,.

....

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

In Reply Refer To:

MAY 2 7 1980

RII:DJB

50-280/80-19

S0-281/80-19

Virginia Electric and Power Company

ATTN:

J. H. Ferguson

Executive Vice President-Power

P. 0. Box 26666

Richmond, VA

23261

Gentlemen:

This refers to the inspection conducted by D. J. Burke of this office on April 7

through May 2, 1980 of activities authorized by NRC License Nos. DPR-32 and

DPR-37 for the Surry Power Station *facility, and to the discussion of our findings

held with J. L. Wilson at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the enclosed

inspection report.

Within these areas, the inspection consisted of selective exam-

inations of procedures and representative records, interviews with personnel, and

observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters.

These are discussed in the enclosed inspection report.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements.

These items and references

to pertinent requirem~nts are listed in the Notice of Violation enclosed here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Section 2.201 requires you to submit to this office, within 20

days of your receipt of this notice, a written statement or explanation in reply

including:

(1) corrective steps which have been taken by you and the results

achieved; (2) corrective steps which will be taken to avoid further noncompli-

ance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

  • proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

  • application must include a full statement of the reasons on the basis of which

it is_claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Virginia Electric and Power Company

-2-

MAY 2 7 7980

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Enclosure:

Sincerely,

,e.c. r

.

R. C.~cting Chief

Reactor Operations and Nuclear

Support Branch

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-280/80-19

and S0-281/80-19