Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-78-201, FP&L Will Provide Proposed Methods and Procedures for Implementation of Draft Staff Position on System Operations in 30 Days, and Proposed Tech Specs for Surveillance of Onsite Power Source in 60 Days + (01:32:18, 6 January 2025)
- ML18144A719 + (01:32:18, 6 January 2025)
- L-78-259, Response to Letter of 5/17/1978 Requesting Information Regarding Control of Heavy Loads. FP&L Plans to Submit by 9/30/1978 + (01:32:21, 6 January 2025)
- 05000335/LER-2076-043-01, Missing Standpipes in Steam Generator a Feed Ring + (01:32:24, 6 January 2025)
- 05000335/LER-2076-046, Inoperable Door Operating Mechanism in Containment Personnel Air Lock Outer Door + (01:32:26, 6 January 2025)
- ML18144A704 + (01:32:27, 6 January 2025)
- ML18144A703 + (01:32:28, 6 January 2025)
- 05000335/LER-2077-002, Lockout Trip of Diesel Generator 1B During Surveillance Testing + (01:32:30, 6 January 2025)
- ML18144A701 + (01:32:31, 6 January 2025)
- ML18144A693 + (01:32:32, 6 January 2025)
- L-76-241, Regarding NRCs Letter of 5/25/1976 Informing Inservice Inspection Requirements Were Changed, FP&L Requests Submittal of Amendment to Technical Specifications to Be Delayed Until 7/1/1977 + (01:32:34, 6 January 2025)
- ML18144A692 + (01:32:34, 6 January 2025)
- PMNS20180669, June 14 2018 Forthcoming Closed PRE-SUBMITTAL Meeting for the Westinghouse Electric Company Restart of WCAP-15942-P-A/WCAP-15942-NP-A, Supplement 1,REVISION 1, Material Changes for SVEA-96 Optima 2 Fuel Assemblies Topical Report Review + (01:32:38, 6 January 2025)
- L-75-522, Report of Leaking Socket Welds Will Not Be Available Until 11/21/1975 + (01:32:49, 6 January 2025)
- ML18144A522 + (01:32:51, 6 January 2025)
- ML18144A525 + (01:32:51, 6 January 2025)
- ML18144A470 + (01:32:52, 6 January 2025)
- ML18144A440 + (01:32:52, 6 January 2025)
- ML18144A434 + (01:32:53, 6 January 2025)
- IR 05000320/2018011 + (01:32:54, 6 January 2025)
- ML18144A358 + (01:32:55, 6 January 2025)
- ML18144A306 + (01:32:56, 6 January 2025)
- ML18144A302 + (01:32:57, 6 January 2025)
- ML18144A297 + (01:32:57, 6 January 2025)
- ML18144A296 + (01:32:58, 6 January 2025)
- ML18144A277 + (01:33:03, 6 January 2025)
- ML18144A276 + (01:33:04, 6 January 2025)
- ML18144A275 + (01:33:05, 6 January 2025)
- ML18144A265 + (01:33:06, 6 January 2025)
- ML18144A269 + (01:33:06, 6 January 2025)
- ML18144A263 + (01:33:07, 6 January 2025)
- ML18144A261 + (01:33:08, 6 January 2025)
- ML18144A251 + (01:33:08, 6 January 2025)
- SBK-L-18097, Additional Changes to the Eighth Annual Update to the NextEra Energy Seabrook License Renewal Application + (01:33:09, 6 January 2025)
- ML18144A240 + (01:33:10, 6 January 2025)
- ML18144A239 + (01:33:11, 6 January 2025)
- ML18144A238 + (01:33:12, 6 January 2025)
- ML18144A237 + (01:33:14, 6 January 2025)
- ML18144A222 + (01:33:15, 6 January 2025)
- ML18144A212 + (01:33:16, 6 January 2025)
- ML18144A211 + (01:33:16, 6 January 2025)
- ML18144A208 + (01:33:17, 6 January 2025)
- L-78-064, Response to Request of Information within 30 Calendar Days of Date of IE Bulletin 78-02 Regarding Environmental Qualifications of Unprotected Terminal Blocks. Plant Is in Early Construction Stages and FP&L Will Answer by 3/31/1978 + (01:33:18, 6 January 2025)
- ML18144A206 + (01:33:18, 6 January 2025)
- ML18144A203 + (01:33:19, 6 January 2025)
- ML18144A204 + (01:33:19, 6 January 2025)
- ML18144A202 + (01:33:20, 6 January 2025)
- L-78-253, Response to IE Bulletin 78-06 Concerning Defective Cutler-Hammer Type M Relays with DC Coils, FP&L Will Either Replace or Modify in Accordance with Recommended Action If Such Relays to Be Found on Equipment + (01:33:21, 6 January 2025)
- L-78-269, Response to IE Bulletin 78-07 Concerning Protection Afforded by Air-Line Respirators and Supplied-Air Hoods, FP&L States Respiratory Protection Program Does Not Intend to Utilize Supplied-Air Respirators in Demand Mode + (01:33:21, 6 January 2025)
- ML18144A196 + (01:33:22, 6 January 2025)
- ML18144A198 + (01:33:22, 6 January 2025)