ML18144A206

From kanterella
Jump to navigation Jump to search
After Reviewing IE Bulletin 77-03, FP&L Determined the Subject Solid State Protection System Is Not Installed or Scheduled to Be Installed
ML18144A206
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 09/23/1977
From: Robert E. Uhrig
Florida Power & Light Co
To: O'Reilly J
NRC/IE, NRC/RGN-II
References
IEB-77-003
Download: ML18144A206 (1)


Text

P.O. BOX 013100, MIAMI. FL 33101 j

0 t~~f FLORIDA POWER & LIGHT COMPANY September 23, 1977 L-77-301

'I II

~~ ~

Mr. James P. O'Reilly, Director, Region Office of Xnspection and Enforcement U. S. Nuclear Regulatory Commission 230 Peachtree Street, N.W., Suite 1217 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Re: XE:II:JPO 50-389 50-335 50-250 50-251 We have reviewed IE Bulletin 77-03 and have determined that the subject solid state protection system is not installed or scheduled to be installed at St. Lucie Units 1 and 2 or Turkey Point Units 3 and 4.

Very truly yours,

/A > g55.+

Robert E. Uhtig

,Vice President REU/WAK: ltm cc: 'obert Lowenstein, Esq.