ML18144A204

From kanterella
Jump to navigation Jump to search
Response to IE Bulletin 78-02, Unprotected Terminal Blocks Will Not Be Used on Safety Related Systems Inside Containment; Post LOCA Qualification Documentation on Cable Splices Will Be Provided in FSAR
ML18144A204
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/17/1978
From: Robert E. Uhrig
Florida Power & Light Co
To: O'Reilly J
NRC/IE, NRC/RGN-II
References
Download: ML18144A204 (1)


Text

(II//i I/

FLORIOA POWER 5 LIGHT COMPANY April 17, 1978 L-78-137 Mr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U.

S. Nuclear Regulatory Commission 230 Peachtree

Street, N. W., Suite 818 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Re:

RII:JPO 50-389 In response to IE Bulletin 78-02, unprotected terminal blocks will not be used on safety related systems inside the containment at St. Lucie Unit 2.

Post LOCA qualification documentation on cable splices will be provided in the St. Lucie Unit 2 FSAR.

Very truly yours, 4 E C)k'~<Zip Robert E. Uhrig Vice President REU:JNB:sl cc:

Harold F. Reis, Esquire HELPING 8UILD FLORIDA