Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18152B478 + (00:38:16, 6 January 2025)
- ML18152B474 + (00:38:17, 6 January 2025)
- ML18152B462 + (00:38:18, 6 January 2025)
- ML18152B464 + (00:38:18, 6 January 2025)
- ML18152B459 + (00:38:19, 6 January 2025)
- ML18152B458 + (00:38:20, 6 January 2025)
- PNO-II-99-037J, on 990916,Hurricane Floyd Was Located Approx 25 Miles north-northeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 34.5 North & Longitude 77.6 West.Bsep Units Remain in Csd & Surry Units Are in NOUE + (00:38:22, 6 January 2025)
- ML18152B450 + (00:38:23, 6 January 2025)
- ML18152B447 + (00:38:24, 6 January 2025)
- ML18152B445 + (00:38:24, 6 January 2025)
- 05000280/LER-1999-006, :on 990802,determined That Plant Was Outside of App R Design Basis Due to Fire Barrier Deficiencies. Caused by Original Plant Design Deficiencies.Fire Watches Were Established & Mods Have Been Completed.With + (00:38:26, 6 January 2025)
- 05000280/LER-1999-005-01, :on 990731,effluent Radiation Monitors Were Declared Inoperable.Caused by Degraded Heat Trace Circuits for Monitors Sample Suction Line.Degraded Heat Trace Circuit Was Replaced & Addl Heat Trace Is Being Installed + (00:38:28, 6 January 2025)
- ML18152B440 + (00:38:29, 6 January 2025)
- IR 05000280/1999003 + (00:38:30, 6 January 2025)
- ML18152B436 + (00:38:32, 6 January 2025)
- ML18152B437 + (00:38:32, 6 January 2025)
- ML18152B434 + (00:38:33, 6 January 2025)
- ML18152B430 + (00:38:35, 6 January 2025)
- ML18152B432 + (00:38:35, 6 January 2025)
- ML18152B426 + (00:38:36, 6 January 2025)
- ML18152B424 + (00:38:37, 6 January 2025)
- ML18152B422 + (00:38:38, 6 January 2025)
- ML18152B423 + (00:38:38, 6 January 2025)
- ML18152B421 + (00:38:39, 6 January 2025)
- ML18152B420 + (00:38:43, 6 January 2025)
- ML18152B419 + (00:38:45, 6 January 2025)
- 05000281/LER-1999-002-02, :on 990425,MSSVs Tested Out of Tolerance for as Found Setpoint.Caused by Minor Setpoint Drift.No Immediate Action Required.Deviation Rept Submitted for Each Valve.With + (00:38:46, 6 January 2025)
- ML18152B417 + (00:38:47, 6 January 2025)
- ML18152B416 + (00:38:48, 6 January 2025)
- ML18152B415 + (00:38:49, 6 January 2025)
- ML18152B413 + (00:38:50, 6 January 2025)
- ML18152B412 + (00:38:51, 6 January 2025)
- 05000280/LER-1999-003-01, :on 990331,potential Loss of Charging Pumps Was Noted.Caused by Main CR Fire.Station Deviation Was Issued on 990331.With + (00:38:52, 6 January 2025)
- ML18152B410 + (00:38:53, 6 January 2025)
- ML18152B409 + (00:38:54, 6 January 2025)
- ML18152B408 + (00:38:55, 6 January 2025)
- IR 05000280/1999004 + (00:39:07, 6 January 2025)
- ML18152B405 + (00:39:09, 6 January 2025)
- ML18152B402 + (00:39:10, 6 January 2025)
- ML18152B399 + (00:39:11, 6 January 2025)
- ML18152B400 + (00:39:11, 6 January 2025)
- ML18152B398 + (00:39:12, 6 January 2025)
- ML18152B397 + (00:39:15, 6 January 2025)
- ML18152B396 + (00:39:16, 6 January 2025)
- ML18152B395 + (00:39:17, 6 January 2025)
- ML18152B393 + (00:39:18, 6 January 2025)
- ML18152B391 + (00:39:19, 6 January 2025)
- PNO-II-99-026, on 990705,Surry Unit 2 Experienced Low Reactor Coolant Flow Automatic Scram from 100% Power.Operators Responded to Indication,As Required by Procedures,By Injecting Borated Water Into RCS + (00:39:21, 6 January 2025)
- ML18152B385 + (00:39:22, 6 January 2025)
- ML18152B384 + (00:39:23, 6 January 2025)
- ML18152B383 + (00:39:24, 6 January 2025)