Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211B016 + (05:31:01, 6 December 2024)
- ML20211B012 + (05:31:05, 6 December 2024)
- ML20211B011 + (05:31:06, 6 December 2024)
- 3F0899-17, Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-05 + (05:31:07, 6 December 2024)
- ML20211B010 + (05:31:07, 6 December 2024)
- ML20211B006 + (05:31:08, 6 December 2024)
- ML20211B007 + (05:31:08, 6 December 2024)
- ML20211B003 + (05:31:11, 6 December 2024)
- ML20211B001 + (05:31:13, 6 December 2024)
- ML20211B000 + (05:31:14, 6 December 2024)
- ML20211A998 + (05:31:15, 6 December 2024)
- ML20211A997 + (05:31:16, 6 December 2024)
- RBG-35407, Special Rept:In Jan 1987,quarterly Rept Showed Marker 34 Settlement in Excess of Predicted Value.Cause Attributed to Assumptions in Effect of Const Schedule on Structural Settlement.Normal Survey Frequency Remains in Effect + (05:31:16, 6 December 2024)
- ML20211A994 + (05:31:17, 6 December 2024)
- 05000458/LER-1987-002, :on 870112,reactor Shutdown Initiated for Unidentified Drywell Leakage Exceeding 5 Gpm.Caused by Packing Leaks on Several Valves W/Rhr B Testable Injection Check Valve as Primary Contributer + (05:31:21, 6 December 2024)
- ML20211A991 + (05:31:22, 6 December 2024)
- 05000249/LER-1986-010-05, :on 860422,cribhouse Deluge Sys 2/3 Taken Out of Svc to Complete Portion of App R Mod Work.Testing Completed on 860503.Sys Placed in Svc on 860507 After Readjustment of Deluge Valve + (05:31:23, 6 December 2024)
- ML20211A988 + (05:31:24, 6 December 2024)
- ML20211A986 + (05:31:25, 6 December 2024)
- ML20211A984 + (05:31:26, 6 December 2024)
- ML20211A983 + (05:31:27, 6 December 2024)
- ML20211A982 + (05:31:28, 6 December 2024)
- ML20211A979 + (05:31:28, 6 December 2024)
- ML20211A978 + (05:31:29, 6 December 2024)
- ML20211A977 + (05:31:30, 6 December 2024)
- TXX-4794, Forwards Public Version of Revised Emergency Plan Procedures,Including Rev 4 to EPP-115, Release of Emergency-Related Info to Public & Rev 5 to EPP-207, Activation of News Ctr.... W/860602 Release Memo + (05:31:30, 6 December 2024)
- ML20211A974 + (05:31:31, 6 December 2024)
- ML20211A973 + (05:31:31, 6 December 2024)
- ML20211A972 + (05:31:32, 6 December 2024)
- ML20211A971 + (05:31:33, 6 December 2024)
- ML20211A970 + (05:31:33, 6 December 2024)
- ML20211A967 + (05:31:34, 6 December 2024)
- ML20211A964 + (05:31:35, 6 December 2024)
- ML20211A965 + (05:31:35, 6 December 2024)
- ML20211A963 + (05:31:36, 6 December 2024)
- 05000263/LER-1986-011, :on 860509,EFT Sys (Control Room HVAC) Automatically Transferred to Toxic Chemical Mode Due to Hydrogen Chloride Monitor Tape Break.Caused by Small Imperfection on Tape + (05:31:37, 6 December 2024)
- 05000409/LER-1986-029, :on 860918,reactor Scrammed on Low Recirculation Flow When Forced Circulation Pump 1B Tripped. Caused by Closed Seal Inject Supply Valve.Valve Controller Rebuilt & Procedure Change Implemented + (05:31:40, 6 December 2024)
- ML20211A955 + (05:31:42, 6 December 2024)
- ML20211A953 + (05:31:43, 6 December 2024)
- ML20211A951 + (05:31:47, 6 December 2024)
- ML20211A950 + (05:31:48, 6 December 2024)
- ML20211A946 + (05:31:49, 6 December 2024)
- ML20211A948 + (05:31:49, 6 December 2024)
- ML20211A945 + (05:31:50, 6 December 2024)
- ML20211A944 + (05:31:50, 6 December 2024)
- LIC-99-0076, Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d) + (05:31:51, 6 December 2024)
- 05000368/LER-1986-004-01, :on 860421,unit Tripped from 100% Power Due to Core Protection Calculator Generated Low Departure from Nucleate Boiling Ratio Trip in 2 of 4 Channels of Reactor Protective Sys + (05:31:53, 6 December 2024)
- ML20211A941 + (05:31:54, 6 December 2024)
- 05000263/LER-1986-010, :on 860508,reactor Bldg Ventilation Isolation & Standby Gas Treatment Sys Initiation Occurred.Caused by Reactor Bldg Vent wide-range Gas Monitor Trip Due to Hardware/Software Problems + (05:31:55, 6 December 2024)
- ML20211A938 + (05:31:59, 6 December 2024)
- IR 05000458/1999011 + (05:32:00, 6 December 2024)
- ML20211A935 + (05:32:02, 6 December 2024)