Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211B058 + (05:30:33, 6 December 2024)
- ML20211B056 + (05:30:34, 6 December 2024)
- ML20211B054 + (05:30:35, 6 December 2024)
- ML20211B052 + (05:30:39, 6 December 2024)
- ML20211B051 + (05:30:39, 6 December 2024)
- 05000321/LER-1986-021, :on 860501,full Reactor Protection Sys Logic Actuation Occurred,Causing Scram Discharge Vol Header to Fill.Caused by Broken Molded Bakelite Actuating Lever of Channel Scram Relay.Relay Replaced + (05:30:41, 6 December 2024)
- ML20211B046 + (05:30:42, 6 December 2024)
- ML20211B045 + (05:30:43, 6 December 2024)
- ML20211B043 + (05:30:43, 6 December 2024)
- 05000286/LER-1986-008-01, :on 860829,field Insp Identified Absence of Heat Shrink Tubing at Connection of Coaxial Cable of Containment high-range Radiation Monitors R25 & R26.Heat Shrinkable Tubing Installed + (05:30:47, 6 December 2024)
- ML20211B038 + (05:30:49, 6 December 2024)
- ML20211B037 + (05:30:49, 6 December 2024)
- ML20211B030 + (05:30:51, 6 December 2024)
- ML20211B033 + (05:30:51, 6 December 2024)
- ML20211B029 + (05:30:52, 6 December 2024)
- ML20211B028 + (05:30:53, 6 December 2024)
- ML20211B027 + (05:30:53, 6 December 2024)
- ML20211B026 + (05:30:54, 6 December 2024)
- ML20211B024 + (05:30:55, 6 December 2024)
- ML20211B025 + (05:30:55, 6 December 2024)
- ML20211B023 + (05:30:56, 6 December 2024)
- 05000327/LER-1986-043, :on 860910,Surveillance Instruction (SI)-156 for Surveillance Requirement 4.6.1.2 Did Not Provide for Venting of Three Containment Isolation Valves During Testing.Caused by Inadequate Review + (05:30:58, 6 December 2024)
- ML20211B020 + (05:30:59, 6 December 2024)
- B12396, Forwards Probabilistic Risk Analysis of Events Caused by Internal Flooding,Per 860731 Commitment.Analysis Identifies & Evaluates Consequences of Postulated Accidents Due to Internal Flooding.Insights Gained Listed + (05:31:00, 6 December 2024)
- ML20211B019 + (05:31:00, 6 December 2024)
- ML20211B016 + (05:31:01, 6 December 2024)
- ML20211B012 + (05:31:05, 6 December 2024)
- ML20211B011 + (05:31:06, 6 December 2024)
- 3F0899-17, Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-05 + (05:31:07, 6 December 2024)
- ML20211B010 + (05:31:07, 6 December 2024)
- ML20211B006 + (05:31:08, 6 December 2024)
- ML20211B007 + (05:31:08, 6 December 2024)
- ML20211B003 + (05:31:11, 6 December 2024)
- ML20211B001 + (05:31:13, 6 December 2024)
- ML20211B000 + (05:31:14, 6 December 2024)
- ML20211A998 + (05:31:15, 6 December 2024)
- ML20211A997 + (05:31:16, 6 December 2024)
- RBG-35407, Special Rept:In Jan 1987,quarterly Rept Showed Marker 34 Settlement in Excess of Predicted Value.Cause Attributed to Assumptions in Effect of Const Schedule on Structural Settlement.Normal Survey Frequency Remains in Effect + (05:31:16, 6 December 2024)
- ML20211A994 + (05:31:17, 6 December 2024)
- 05000458/LER-1987-002, :on 870112,reactor Shutdown Initiated for Unidentified Drywell Leakage Exceeding 5 Gpm.Caused by Packing Leaks on Several Valves W/Rhr B Testable Injection Check Valve as Primary Contributer + (05:31:21, 6 December 2024)
- ML20211A991 + (05:31:22, 6 December 2024)
- 05000249/LER-1986-010-05, :on 860422,cribhouse Deluge Sys 2/3 Taken Out of Svc to Complete Portion of App R Mod Work.Testing Completed on 860503.Sys Placed in Svc on 860507 After Readjustment of Deluge Valve + (05:31:23, 6 December 2024)
- ML20211A988 + (05:31:24, 6 December 2024)
- ML20211A986 + (05:31:25, 6 December 2024)
- ML20211A984 + (05:31:26, 6 December 2024)
- ML20211A983 + (05:31:27, 6 December 2024)
- ML20211A982 + (05:31:28, 6 December 2024)
- ML20211A979 + (05:31:28, 6 December 2024)
- ML20211A978 + (05:31:29, 6 December 2024)
- ML20211A977 + (05:31:30, 6 December 2024)
- TXX-4794, Forwards Public Version of Revised Emergency Plan Procedures,Including Rev 4 to EPP-115, Release of Emergency-Related Info to Public & Rev 5 to EPP-207, Activation of News Ctr.... W/860602 Release Memo + (05:31:30, 6 December 2024)