Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211D030 + (05:07:15, 6 December 2024)
- ML20211D029 + (05:07:16, 6 December 2024)
- ML20211D028 + (05:07:16, 6 December 2024)
- ML20211D025 + (05:07:17, 6 December 2024)
- ML20211D023 + (05:07:18, 6 December 2024)
- IR 05000317/1986022 + (05:07:22, 6 December 2024)
- 05000334/LER-1999-009-01, :on 990429,missed Surveillance of Ccws 10 & 8 Header cross-connect Inlet Isolation Valve ICCR-42 Was Noted.Caused by Personnel Error.Involved Personnel Have Been Counseled on Scrutiny of Surveillances.With + (05:07:24, 6 December 2024)
- ML20211D013 + (05:07:25, 6 December 2024)
- ML20211D014 + (05:07:25, 6 December 2024)
- ML20211D011 + (05:07:26, 6 December 2024)
- ML20211D010 + (05:07:27, 6 December 2024)
- ML20211D008 + (05:07:28, 6 December 2024)
- ML20211D009 + (05:07:28, 6 December 2024)
- TXX-6281, Interim Deficiency Rept CP-86-83 Re Use of Separation Barrier Matl on Power Cables & Power Raceways.Initially Reported on 861208.Evaluation of Conductor Temp of Power Cables Scheduled for 870228.Next Rept Expected by 870323 + (05:07:29, 6 December 2024)
- ML20211D006 + (05:07:30, 6 December 2024)
- ML20211D003 + (05:07:30, 6 December 2024)
- ML20211D002 + (05:07:31, 6 December 2024)
- ML20211C999 + (05:07:32, 6 December 2024)
- ML20211D001 + (05:07:32, 6 December 2024)
- ML20211C998 + (05:07:33, 6 December 2024)
- ML20211C996 + (05:07:34, 6 December 2024)
- ML20211C993 + (05:07:34, 6 December 2024)
- IR 05000334/1986020 + (05:07:42, 6 December 2024)
- ML20211C991 + (05:07:43, 6 December 2024)
- ML20211C990 + (05:07:44, 6 December 2024)
- ML20211C988 + (05:07:44, 6 December 2024)
- B12288, Forwards Summary of Safety Impact Model Project Analysis for Isap Topic 1.21, Reg Guide 1.97 Instrumentation + (05:07:45, 6 December 2024)
- ML20211C987 + (05:07:45, 6 December 2024)
- PNO-II-86-075, Region II Received Rept Re Five Fission Detectors,Each Containing Approx 2 G High Enriched U, Identified as Missing in Jul 1986.Matl Believed Included in 1985 Radwaste Shipment.Region II Specialist Sent to Site + (05:07:46, 6 December 2024)
- ML20211C982 + (05:07:47, 6 December 2024)
- ML20211C979 + (05:07:48, 6 December 2024)
- ML20211C980 + (05:07:48, 6 December 2024)
- IR 05000327/1986052 + (05:07:50, 6 December 2024)
- ML20211C977 + (05:07:51, 6 December 2024)
- 05000364/LER-1986-008-01, :on 860915,failure to Post Fire Watch Per Tech Spec 3.7.11.2 Discovered.Caused by Personnel Propping Open Fire Door W/O Control Room Approval.Personnel Counseled Re Fire Door Opening Procedures + (05:07:53, 6 December 2024)
- ML20211C972 + (05:07:54, 6 December 2024)
- ML20211C966 + (05:07:55, 6 December 2024)
- ML20211C969 + (05:07:55, 6 December 2024)
- ML20211C965 + (05:07:56, 6 December 2024)
- ML20211C964 + (05:07:56, 6 December 2024)
- ML20211C962 + (05:07:57, 6 December 2024)
- ML20211C960 + (05:07:58, 6 December 2024)
- ML20211C961 + (05:07:58, 6 December 2024)
- ML20211C959 + (05:07:59, 6 December 2024)
- ML20211C958 + (05:08:00, 6 December 2024)
- ML20211C950 + (05:08:01, 6 December 2024)
- ML20211C952 + (05:08:01, 6 December 2024)
- U-603258, Forwards ISI Summary Rept, IAW ASME Section Xi,Article IWA-6000.Summary Rept Addresses ISI Activities Performed at Plant from 950429-990527,including Extended Sixth Refueling Outage + (05:08:02, 6 December 2024)
- ML20211C947 + (05:08:02, 6 December 2024)
- ML20211C943 + (05:08:03, 6 December 2024)
- ML20211C939 + (05:08:04, 6 December 2024)
- ML20211C942 + (05:08:04, 6 December 2024)