Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211E884 + (04:39:10, 6 December 2024)
- ML20211E881 + (04:39:15, 6 December 2024)
- ML20211E879 + (04:39:16, 6 December 2024)
- AECM-86-0331, Application for Amend to License NPF-29,revising Tech Specs to Delete 2 Minute Time & Temp Limits Associated W/Stuck Open Safety/Relief Valves,Adding Smoke Detectors & Reflecting Changes Re RCIC Turbine Bypass Valve.Fee Paid + (04:39:17, 6 December 2024)
- ML20211E877 + (04:39:17, 6 December 2024)
- IR 05000285/1987001 + (04:39:19, 6 December 2024)
- ML20211E873 + (04:39:22, 6 December 2024)
- ML20211E871 + (04:39:23, 6 December 2024)
- ML20211E868 + (04:39:24, 6 December 2024)
- ML20211E864 + (04:39:24, 6 December 2024)
- ML20211E863 + (04:39:25, 6 December 2024)
- ML20211E860 + (04:39:26, 6 December 2024)
- ML20211E861 + (04:39:26, 6 December 2024)
- ST-HL-AE-1677, Final Deficiency Rept Re Rotated Locknuts on safety-related Cable Tray Support Connections.Initially Reported on 860310. Discrepancies in Alignment & Engagement of Locknuts Corrected.Item Not Reportable Per 10CFR50.55(e) + (04:39:27, 6 December 2024)
- ML20211E857 + (04:39:28, 6 December 2024)
- ML20211E856 + (04:39:28, 6 December 2024)
- ML20211E854 + (04:39:29, 6 December 2024)
- ML20211E855 + (04:39:29, 6 December 2024)
- 3F1086-13, Supplemental Application for Amend to License DPR-72, Incorporating Rev 3 to Change Request 103,to Revise Tech Specs Re Administrative Controls + (04:39:30, 6 December 2024)
- ML20211E852 + (04:39:31, 6 December 2024)
- 05000245/LER-1997-035-01, :on 970826,ECCS Actuation LCO Was Not Met. Caused by Human Error (Technical Oversight) When Interlock Was Added to Ts.Performed Review to Determine Whether Containment Spray Interlock Should Be Controlled in TS + (04:39:34, 6 December 2024)
- ML20211E848 + (04:39:36, 6 December 2024)
- ML20211E850 + (04:39:36, 6 December 2024)
- BECO-86-162, Forwards Corrected Table 4.1.1, Reactor Protection Sys (Scram) Instrumentation Functional Tests Min Functional Test Frequencies for Safety Instrumentation & Control Circuits, for 860227 Proposed Tech Spec Change Re Analog Trip Sys + (04:39:40, 6 December 2024)
- ML20211E843 + (04:39:40, 6 December 2024)
- ML20211E841 + (04:39:41, 6 December 2024)
- ML20211E839 + (04:39:42, 6 December 2024)
- ML20211E837 + (04:39:42, 6 December 2024)
- 05000263/LER-1986-012, :on 860508 Five Penetrations of Transversing in-core Probe Sys Omitted from double-gasket Seal Testing Procedure.Procedure Revised.Penetrations Tested & Drawings Reviewed + (04:39:44, 6 December 2024)
- 05000245/LER-1997-035, Forwards LER 97-035-00,documenting Event That Occurred on 970826.Commitments Provided + (04:39:45, 6 December 2024)
- IR 05000353/1986021 + (04:39:47, 6 December 2024)
- ML20211E828 + (04:39:50, 6 December 2024)
- ML20211E823 + (04:39:52, 6 December 2024)
- ML20211E824 + (04:39:52, 6 December 2024)
- ML20211E822 + (04:39:54, 6 December 2024)
- ML20211E820 + (04:39:55, 6 December 2024)
- IR 05000461/1986023 + (04:40:36, 6 December 2024)
- ML20211E818 + (04:40:37, 6 December 2024)
- ML20211E816 + (04:40:38, 6 December 2024)
- ML20211E817 + (04:40:38, 6 December 2024)
- ML20211E815 + (04:40:39, 6 December 2024)
- IR 05000213/1999002 + (04:40:41, 6 December 2024)
- ML20211E813 + (04:40:42, 6 December 2024)
- IR 05000498/1987001 + (04:40:44, 6 December 2024)
- ML20211E809 + (04:40:44, 6 December 2024)
- ML20211E805 + (04:40:45, 6 December 2024)
- ML20211E806 + (04:40:45, 6 December 2024)
- ML20211E804 + (04:40:46, 6 December 2024)
- 05000280/LER-1986-016, :on 860510,lift Settings for Five Safety Valves on Main Steam Line B Found 3% Greater than Lift Setpoints. Caused by Setpoints Set Too High During 841223 Calibr Due to Unreliable Indication + (04:40:48, 6 December 2024)
- ML20211E802 + (04:40:49, 6 December 2024)
- ML20211E801 + (04:40:50, 6 December 2024)