Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211F378 + (04:32:27, 6 December 2024)
- ML20211F377 + (04:32:28, 6 December 2024)
- ML20211F375 + (04:32:29, 6 December 2024)
- ML20211F372 + (04:32:30, 6 December 2024)
- ML20211F371 + (04:32:30, 6 December 2024)
- ML20211F370 + (04:32:31, 6 December 2024)
- ML20211F369 + (04:32:32, 6 December 2024)
- ML20211F367 + (04:32:33, 6 December 2024)
- ML20211F365 + (04:32:36, 6 December 2024)
- ML20211F363 + (04:32:37, 6 December 2024)
- IR 05000309/1986020 + (04:32:38, 6 December 2024)
- ML20211F358 + (04:32:42, 6 December 2024)
- ML20211F356 + (04:32:43, 6 December 2024)
- 05000424/LER-1997-006-02, :on 970830,H Monitoring Sys Train Was Rendered Inoperable.Caused by Personnel Error.Reviewed Tests Conducted During Period of Time Involved + (04:32:45, 6 December 2024)
- SVP-97-197, Responds to NRC Re Violations Noted in Insp Repts 50-254/97-11 & 50-265/97-11.Corrective actions:1B RHR Gate Was Continually Attended Until Reactor Bldg Basement Was Released from LHRA Status + (04:32:46, 6 December 2024)
- ML20211F348 + (04:32:48, 6 December 2024)
- ML20211F345 + (04:32:55, 6 December 2024)
- ML20211F344 + (04:32:55, 6 December 2024)
- ML20211F343 + (04:32:56, 6 December 2024)
- ML20211F337 + (04:32:57, 6 December 2024)
- ML20211F342 + (04:32:57, 6 December 2024)
- ML20211F335 + (04:32:58, 6 December 2024)
- ML20211F332 + (04:32:59, 6 December 2024)
- 3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 + (04:33:00, 6 December 2024)
- ML20211F329 + (04:33:01, 6 December 2024)
- ML20211F326 + (04:33:02, 6 December 2024)
- ML20211F321 + (04:33:03, 6 December 2024)
- 05000445/LER-1997-007, :on 970820,post-work Testing for Containment Isolation Valve Was Not Performed After Maint.Caused by Incorrect Belief That Work Did Not Involve Replacement. Tested Valve IAW TS Requirements + (04:33:05, 6 December 2024)
- 05000220/LER-1999-004-01, :on 990723,reactor Scram Was Noted.Caused by Mechanical Pressure Regulator Suppressor Valve Failure. Cleaned Pressure Suppressor Valve & Provided Guidance for Valve Disassembly & Insp.With + (04:33:07, 6 December 2024)
- ML20211F316 + (04:33:08, 6 December 2024)
- ML20211F309 + (04:33:09, 6 December 2024)
- ML20211F308 + (04:33:10, 6 December 2024)
- ML20211F303 + (04:33:11, 6 December 2024)
- ML20211F307 + (04:33:11, 6 December 2024)
- ML20211F300 + (04:33:12, 6 December 2024)
- ML20211F297 + (04:33:13, 6 December 2024)
- ML20211F296 + (04:33:14, 6 December 2024)
- 05000327/LER-1986-044, :on 860925,determined That Surveillance Instructions Did Not Adequately Verify ECCS Flow.Caused by Procedural Inadequacy.Procedure Changed to Ensure Injection Flow Path + (04:33:15, 6 December 2024)
- ML20211F290 + (04:33:17, 6 December 2024)
- ML20211F289 + (04:33:17, 6 December 2024)
- ML20211F288 + (04:33:18, 6 December 2024)
- ML20211F285 + (04:33:19, 6 December 2024)
- ML20211F282 + (04:33:20, 6 December 2024)
- ML20211F284 + (04:33:20, 6 December 2024)
- ML20211F280 + (04:33:21, 6 December 2024)
- ML20211F279 + (04:33:22, 6 December 2024)
- ML20211F278 + (04:33:22, 6 December 2024)
- ML20211F276 + (04:33:23, 6 December 2024)
- ML20211F275 + (04:33:23, 6 December 2024)
- ML20211F272 + (04:33:26, 6 December 2024)
- ML20211F271 + (04:33:26, 6 December 2024)