Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000333/1986008 + (02:59:19, 6 December 2024)
- ML20211K947 + (02:59:20, 6 December 2024)
- ML20211K953 + (02:59:20, 6 December 2024)
- ML20211K946 + (02:59:21, 6 December 2024)
- ML20211K943 + (02:59:22, 6 December 2024)
- ML20211K941 + (02:59:22, 6 December 2024)
- TXX-4863, Interim Deficiency Rept CP-85-54 Re Discrepancies in Supplier Provided HVAC Support Documents.Initially Reported on 851220.Engineering Evaluation Scheduled for Completion by Sept 1986.Next Rept Will Be Submitted by 860926 + (02:59:24, 6 December 2024)
- ML20211K939 + (02:59:24, 6 December 2024)
- ML20211K934 + (02:59:25, 6 December 2024)
- 05000440/LER-1986-079, :on 861109,Train B of Control Room HVAC Sys Started Unexpectedly in Emergency Recirculation Mode During Performance of Special Test Instruction.Caused by Procedural Deficiency + (02:59:28, 6 December 2024)
- ML20211K924 + (02:59:31, 6 December 2024)
- ML20211K919 + (02:59:32, 6 December 2024)
- ML20211K916 + (02:59:33, 6 December 2024)
- ML20211K913 + (02:59:35, 6 December 2024)
- ML20211K911 + (02:59:36, 6 December 2024)
- ML20211K910 + (02:59:37, 6 December 2024)
- IR 05000324/1999005 + (02:59:38, 6 December 2024)
- ML20211K901 + (02:59:40, 6 December 2024)
- ML20211K900 + (02:59:40, 6 December 2024)
- ML20211K899 + (02:59:41, 6 December 2024)
- 05000213/LER-1986-021, :on 860524,one of Four ex-core Channels Failed to Meet Acceptance Criteria for Dropped Rod Load Runback Setpoint.Caused by Setpoint Drift.Setpoint Recalibr & Weekly Surveillances Established + (02:59:44, 6 December 2024)
- ML20211K896 + (02:59:45, 6 December 2024)
- ML20211K893 + (02:59:46, 6 December 2024)
- IR 05000369/1999005 + (02:59:49, 6 December 2024)
- ML20211K888 + (02:59:50, 6 December 2024)
- ML20211K886 + (02:59:51, 6 December 2024)
- TXX-4871, Interim Deficiency Rept CP-86-11 Re Cracks in Bingham-Willamette Impeller Casting of Rotating Element of Component Cooling Water Pumps.Initially Reported on 860224. Impellers Will Be Inspected.Next Rept by 860923 + (02:59:53, 6 December 2024)
- ML20211K883 + (02:59:53, 6 December 2024)
- LIC-99-0083, Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase + (02:59:54, 6 December 2024)
- ML20211K881 + (02:59:54, 6 December 2024)
- IR 05000483/1997016 + (02:59:55, 6 December 2024)
- ML20211K878 + (02:59:56, 6 December 2024)
- ML20211K875 + (02:59:57, 6 December 2024)
- 05000528/LER-1986-035, :on 860522,discovered That Two Valve Retests Not Performed on 860513.Caused by Personnel Error.Night Order Will Be Written to Advise Control Room Personnel to Ensure That Work Order Properly Closed Out + (02:59:59, 6 December 2024)
- ML20211K871 + (03:00:00, 6 December 2024)
- 05000323/LER-1985-026, :on 850507 & 860210,Mode 6 Entered W/O Performing Required Surveillance Test & Discovered That Test Line Not Included in Procedures,Respectively.Caused by Inadequate Procedure Review + (03:00:02, 6 December 2024)
- ML20211K869 + (03:00:02, 6 December 2024)
- ML20211K865 + (03:00:03, 6 December 2024)
- ML20211K864 + (03:00:04, 6 December 2024)
- ML20211K863 + (03:00:04, 6 December 2024)
- ML20211K861 + (03:00:05, 6 December 2024)
- ML20211K862 + (03:00:05, 6 December 2024)
- IR 05000302/1986016 + (03:00:07, 6 December 2024)
- ML20211K858 + (03:00:08, 6 December 2024)
- PNO-III-99-041, on 990902,employees at Station Reported Feeling Ground Motion Associated with Earthquake.Plant Staff Checked Plant Sys & Equipment & No Evidence of Damage Was Found + (03:00:08, 6 December 2024)
- ML20211K856 + (03:00:09, 6 December 2024)
- ML20211K851 + (03:00:10, 6 December 2024)
- ML20211K854 + (03:00:10, 6 December 2024)
- ML20211K850 + (03:00:11, 6 December 2024)
- ML20211K849 + (03:00:11, 6 December 2024)
- ML20211K848 + (03:00:12, 6 December 2024)
- BSEP-99-0150, Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6) + (03:00:13, 6 December 2024)